Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONCRETE COMPACTION SYSTEM, VIBRATOR DEVICE, AND CONCRETE COMPACTION METHOD
To provide a concrete compaction system capable of precisely managing a position and a depth in a horizontal plane where a compaction performance is carried out.SOLUTION: A vibrator 20 is provided with: a vibrating part 22 on a first end part in a longitudinal direction; and a first reflection prism 23a and a second reflection prism 23b which are space apart along the longitudinal direction to a second end part opposite to the first end part. Management of compaction is precisely performed through: detecting positions of the first reflection prism 23a and the second prism 23b of the vibrator 20; determining the position of the vibrating reflection part 22 on the first end part based on the detected positions of the first reflection prism 23a and the second reflection prism 23b; and storing the determined position of the vibrating part 22.SELECTED DRAWING: Figure 1
【課題】締固め作業を行った平面的な位置や深さを確実に管理できるコンクリート締固めシステムを提供する。【解決手段】バイブレータ装置20には、長手方向における第1端部に振動部22が配置され、第1端部とは反対側の端部である第2端部に対して長手方向に沿って離間して第1の反射プリズム23aと第2の反射プリズム23bとが設けられる。バイブレータ装置20の第1の反射プリズム23aと第2の反射プリズム23bの位置を検出し、検出された第1の反射プリズム23aと第2の反射プリズム23bの位置に基づいて、第1端部の振動部22の位置を求め、求められた振動部22の位置を記憶して、締固めを管理する。【選択図】図1
CONCRETE COMPACTION SYSTEM, VIBRATOR DEVICE, AND CONCRETE COMPACTION METHOD
To provide a concrete compaction system capable of precisely managing a position and a depth in a horizontal plane where a compaction performance is carried out.SOLUTION: A vibrator 20 is provided with: a vibrating part 22 on a first end part in a longitudinal direction; and a first reflection prism 23a and a second reflection prism 23b which are space apart along the longitudinal direction to a second end part opposite to the first end part. Management of compaction is precisely performed through: detecting positions of the first reflection prism 23a and the second prism 23b of the vibrator 20; determining the position of the vibrating reflection part 22 on the first end part based on the detected positions of the first reflection prism 23a and the second reflection prism 23b; and storing the determined position of the vibrating part 22.SELECTED DRAWING: Figure 1
【課題】締固め作業を行った平面的な位置や深さを確実に管理できるコンクリート締固めシステムを提供する。【解決手段】バイブレータ装置20には、長手方向における第1端部に振動部22が配置され、第1端部とは反対側の端部である第2端部に対して長手方向に沿って離間して第1の反射プリズム23aと第2の反射プリズム23bとが設けられる。バイブレータ装置20の第1の反射プリズム23aと第2の反射プリズム23bの位置を検出し、検出された第1の反射プリズム23aと第2の反射プリズム23bの位置に基づいて、第1端部の振動部22の位置を求め、求められた振動部22の位置を記憶して、締固めを管理する。【選択図】図1
CONCRETE COMPACTION SYSTEM, VIBRATOR DEVICE, AND CONCRETE COMPACTION METHOD
コンクリート締固めシステム、バイブレータ装置、及びコンクリート締固め方法
UNO MASATOSHI (Autor:in) / NEMOTO HIROSHI (Autor:in) / HAYASHI MINORU (Autor:in) / SHIRASAKA NORIHIKO (Autor:in)
06.08.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
CONCRETE COMPACTION VIBRATOR, AND CONCRETE COMPACTION METHOD
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2016
|CONCRETE COMPACTION VIBRATOR AND CONCRETE INSTALLATION MANAGEMENT SYSTEM
Europäisches Patentamt | 2019
|