Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
To provide a post-installed anchor structure, a post-installed anchor construction member, and a post-installed anchor structure deterioration inspection method that enable deterioration of an anchor to be easily confirmed at low cost.SOLUTION: In a hole forming process, an insertion hole 10 is formed in a base material 1. In a filling process, the insertion hole 10 is filled with an adhesive 3 from a hole bottom 16 to an intermediate position. In an inserting process, an anchor 2 is inserted into the insertion hole 10, and the anchor 2 is buried in the adhesive 3 except a space 13 from an opening 11 of the insertion hole 10 to a predetermined position 12 of the insertion hole 10. Elongation of a part of the anchor 2 which is exposed from the adhesive 3 is detected, and when the elongation is equal to or larger than a predetermined quantity, it is determined that the anchor structure has deteriorated.SELECTED DRAWING: Figure 1
【課題】アンカーの劣化を低コストで容易に確認することができるあと施工アンカー構造、あと施工アンカー施工方法およびあと施工アンカー構造劣化検査方法を提供する。【解決手段】孔形成工程で母材1に挿入孔10を形成する。充填工程で挿入孔10の孔底16から中間位置まで接着剤3を充填する。挿入工程で、アンカー2を挿入孔10に挿入して、挿入孔10の開口11から挿入孔10の所定位置12までの空間13を除き、アンカー2を接着剤3に埋め込む。アンカー2の接着剤3から露出した部分の伸びを検出し、伸びが所定量以上のときアンカー構造が劣化していると判断する。【選択図】図1
To provide a post-installed anchor structure, a post-installed anchor construction member, and a post-installed anchor structure deterioration inspection method that enable deterioration of an anchor to be easily confirmed at low cost.SOLUTION: In a hole forming process, an insertion hole 10 is formed in a base material 1. In a filling process, the insertion hole 10 is filled with an adhesive 3 from a hole bottom 16 to an intermediate position. In an inserting process, an anchor 2 is inserted into the insertion hole 10, and the anchor 2 is buried in the adhesive 3 except a space 13 from an opening 11 of the insertion hole 10 to a predetermined position 12 of the insertion hole 10. Elongation of a part of the anchor 2 which is exposed from the adhesive 3 is detected, and when the elongation is equal to or larger than a predetermined quantity, it is determined that the anchor structure has deteriorated.SELECTED DRAWING: Figure 1
【課題】アンカーの劣化を低コストで容易に確認することができるあと施工アンカー構造、あと施工アンカー施工方法およびあと施工アンカー構造劣化検査方法を提供する。【解決手段】孔形成工程で母材1に挿入孔10を形成する。充填工程で挿入孔10の孔底16から中間位置まで接着剤3を充填する。挿入工程で、アンカー2を挿入孔10に挿入して、挿入孔10の開口11から挿入孔10の所定位置12までの空間13を除き、アンカー2を接着剤3に埋め込む。アンカー2の接着剤3から露出した部分の伸びを検出し、伸びが所定量以上のときアンカー構造が劣化していると判断する。【選択図】図1
POST-INSTALLED ANCHOR STRUCTURE
あと施工アンカー構造
TANAKA REIJI (Autor:in)
31.08.2020
Patent
Elektronische Ressource
Japanisch
POST-INSTALLED ANCHOR, POST-INSTALLED ANCHOR CONSTRUCTION METHOD, AND POST-INSTALLED ANCHOR SYSTEM
Europäisches Patentamt | 2016
|Europäisches Patentamt | 2015
|Europäisches Patentamt | 2016
|Europäisches Patentamt | 2017
|