Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONCRETE FLOOR SURFACE CONSTRUCTION TOOL AND CONCRETE FLOOR SURFACE CONSTRUCTION METHOD
To provide a concrete floor construction method that can simplify the joint work and significantly reduce the labor and time required for the joint work in the concrete floor construction.SOLUTION: A vertical trowel plate portion 42 of a floor surface construction tool 40 is inserted into a step portion S, an inner side surface 42b thereof is brought into contact with an outer surface F3 of a concrete layer F, and a lower surface 41b of a horizontal trowel plate portion 41 is brought into contact with a surface F1 of the concrete layer F. In this state, when an operator grasps a handle member 44 by hand and moves the floor surface construction tool 40 horizontally along a retaining frame 100 in the longitudinal direction (arrow line X direction) of the step portion (step-like gap) S, by passing the floor surface construction tool 40, a convex curved surface (R surface) F4 is formed along the longitudinal direction of a peripheral edge portion F2 of the surface F1 of the concrete layer F facing the concrete retaining frame 100.SELECTED DRAWING: Figure 5
【課題】コンクリート床面工事において、打継作業を簡易化し、打継作業に要する労力と時間を大幅に削減することができるコンクリート床面施工法などを提供する。【解決手段】床面施工具40の垂直鏝板部42を段差部Sに挿入し、その内側面42bをコンクリート層Fの外側面F3に当接させるとともに水平鏝板部41の下面41bをコンクリート層Fの表面F1に当接させた状態とし、この状態で、作業者が柄部材44を手で把持して、床面施工具40を止め枠100に沿って段差部(段差状隙間)Sの長手方向(矢線X方向)に水平移動させると、床面施工具40の通過により、コンクリート止め枠100と対向するコンクリート層Fの表面F1の周縁部F2の長手方向に沿って凸曲面(R面)F4が形成される。【選択図】図5
CONCRETE FLOOR SURFACE CONSTRUCTION TOOL AND CONCRETE FLOOR SURFACE CONSTRUCTION METHOD
To provide a concrete floor construction method that can simplify the joint work and significantly reduce the labor and time required for the joint work in the concrete floor construction.SOLUTION: A vertical trowel plate portion 42 of a floor surface construction tool 40 is inserted into a step portion S, an inner side surface 42b thereof is brought into contact with an outer surface F3 of a concrete layer F, and a lower surface 41b of a horizontal trowel plate portion 41 is brought into contact with a surface F1 of the concrete layer F. In this state, when an operator grasps a handle member 44 by hand and moves the floor surface construction tool 40 horizontally along a retaining frame 100 in the longitudinal direction (arrow line X direction) of the step portion (step-like gap) S, by passing the floor surface construction tool 40, a convex curved surface (R surface) F4 is formed along the longitudinal direction of a peripheral edge portion F2 of the surface F1 of the concrete layer F facing the concrete retaining frame 100.SELECTED DRAWING: Figure 5
【課題】コンクリート床面工事において、打継作業を簡易化し、打継作業に要する労力と時間を大幅に削減することができるコンクリート床面施工法などを提供する。【解決手段】床面施工具40の垂直鏝板部42を段差部Sに挿入し、その内側面42bをコンクリート層Fの外側面F3に当接させるとともに水平鏝板部41の下面41bをコンクリート層Fの表面F1に当接させた状態とし、この状態で、作業者が柄部材44を手で把持して、床面施工具40を止め枠100に沿って段差部(段差状隙間)Sの長手方向(矢線X方向)に水平移動させると、床面施工具40の通過により、コンクリート止め枠100と対向するコンクリート層Fの表面F1の周縁部F2の長手方向に沿って凸曲面(R面)F4が形成される。【選択図】図5
CONCRETE FLOOR SURFACE CONSTRUCTION TOOL AND CONCRETE FLOOR SURFACE CONSTRUCTION METHOD
コンクリート床面施工具及びコンクリート床面施工法
KIBA YOSHIYUKI (Autor:in)
22.10.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
Engineering Index Backfile | 1908
AUTOMATIC CONSTRUCTION SYSTEM OF CONCRETE FLOOR SURFACE
Europäisches Patentamt | 2023
|Construction. Laying a good concrete floor surface
Engineering Index Backfile | 1928
|