FLOOR SLAB REPLACEMENT METHOD AND STEEL GIRDER CONSTRUCTION DEVICE
To optimize an upper surface and corners of a steel girder after an existing floor slab has been removed.SOLUTION: A floor slab replacement method includes: an existing floor slab removal step (S1) of removing an existing floor slab 2 from a steel girder 1; a steel girder processing step (S11) of processing the steel girder 1 from which the existing floor slab 2 has been removed; and a new floor slab installation step (S3) of installing a new floor slab 15 on the steel girder 1 that has undergone the processing. The steel girder processing step (S11) includes applying surface preparation processing to an upper surface 1a of the steel girder 1 (the upper surface 1a of an upper flange 1f of the steel girder 1) and/or applying chamfering processing to corners 6, 7 of the steel girder 1 (the corners 6, 7 of the upper flange 1f of the steel girder 1).SELECTED DRAWING: Figure 2
【課題】既設床版が撤去された後の鋼桁の上面や角部の最適化を図る。【解決手段】床版架け替え方法は、既設床版2を鋼桁1から撤去する既設床版撤去工程(S1)と、既設床版2が撤去された鋼桁1に処理を施す鋼桁処理工程(S11)と、この処理が施された鋼桁1上に新設床版15を設置する新設床版設置工程(S3)と、を含む。鋼桁処理工程(S11)は、鋼桁1の上面1a(鋼桁1の上フランジ1fの上面1a)にケレン処理を施すこと、及び/又は、鋼桁1の角部6,7(鋼桁1の上フランジ1fの角部6,7)に面取り処理を施すことを含む。【選択図】図2
FLOOR SLAB REPLACEMENT METHOD AND STEEL GIRDER CONSTRUCTION DEVICE
To optimize an upper surface and corners of a steel girder after an existing floor slab has been removed.SOLUTION: A floor slab replacement method includes: an existing floor slab removal step (S1) of removing an existing floor slab 2 from a steel girder 1; a steel girder processing step (S11) of processing the steel girder 1 from which the existing floor slab 2 has been removed; and a new floor slab installation step (S3) of installing a new floor slab 15 on the steel girder 1 that has undergone the processing. The steel girder processing step (S11) includes applying surface preparation processing to an upper surface 1a of the steel girder 1 (the upper surface 1a of an upper flange 1f of the steel girder 1) and/or applying chamfering processing to corners 6, 7 of the steel girder 1 (the corners 6, 7 of the upper flange 1f of the steel girder 1).SELECTED DRAWING: Figure 2
【課題】既設床版が撤去された後の鋼桁の上面や角部の最適化を図る。【解決手段】床版架け替え方法は、既設床版2を鋼桁1から撤去する既設床版撤去工程(S1)と、既設床版2が撤去された鋼桁1に処理を施す鋼桁処理工程(S11)と、この処理が施された鋼桁1上に新設床版15を設置する新設床版設置工程(S3)と、を含む。鋼桁処理工程(S11)は、鋼桁1の上面1a(鋼桁1の上フランジ1fの上面1a)にケレン処理を施すこと、及び/又は、鋼桁1の角部6,7(鋼桁1の上フランジ1fの角部6,7)に面取り処理を施すことを含む。【選択図】図2
FLOOR SLAB REPLACEMENT METHOD AND STEEL GIRDER CONSTRUCTION DEVICE
床版架け替え方法、及び、鋼桁施工装置
MIMURO KEIJI (Autor:in)
29.10.2020
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
FLOOR SLAB REPLACEMENT METHOD FOR STEEL COMPOSITE GIRDER, AND PC FLOOR SLAB
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2017
|FLOOR SLAB REPLACEMENT METHOD FOR COMPOSITE GIRDER BRIDGE
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2018
|