Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CEILING PANEL CONSTRUCTION METHOD
To provide a ceiling panel construction method capable of efficiently and stably conducting the work for attaching a ceiling panel to a building frame.SOLUTION: A ceiling panel construction method is the method for attaching a ceiling panel 6 to a building frame 2 constituting a building 1, and conducts a ceiling panel suspension step for suspending the ceiling panel 6 from the building frame 2 so that the same is nearly vertical and a ceiling panel installation step for fixing the ceiling panel 6 to the building frame 2. At this time, a ceiling panel temporary receiving jig 10 may be used which comprises a building frame engaging member 20 having an engaging part 22 for engaging to the building frame 2, a panel fixing member 30 for holding the ceiling panel 6, and wire W for connecting the building frame engaging member 20 and the panel fixing member 30.SELECTED DRAWING: Figure 5
【課題】天井パネルを建物の躯体に取り付ける作業を効率的かつ安定して実施できる天井パネル施工方法を提供する。【解決手段】建物1を構成する躯体2に天井パネル6を取り付ける天井パネル施工方法であって、天井パネル6が略鉛直となるように躯体2から懸下する天井パネル懸下工程と、天井パネル6を躯体2に固定する天井パネル取付工程と、を行う。このとき、躯体2に係合する係合部22を有する躯体係合部材20と、天井パネル6を保持するパネル固定部材30と、躯体係合部材20とパネル固定部材30を連結するワイヤーWと、を備える天井パネル仮受用治具10を用いてもよい。【選択図】図5
CEILING PANEL CONSTRUCTION METHOD
To provide a ceiling panel construction method capable of efficiently and stably conducting the work for attaching a ceiling panel to a building frame.SOLUTION: A ceiling panel construction method is the method for attaching a ceiling panel 6 to a building frame 2 constituting a building 1, and conducts a ceiling panel suspension step for suspending the ceiling panel 6 from the building frame 2 so that the same is nearly vertical and a ceiling panel installation step for fixing the ceiling panel 6 to the building frame 2. At this time, a ceiling panel temporary receiving jig 10 may be used which comprises a building frame engaging member 20 having an engaging part 22 for engaging to the building frame 2, a panel fixing member 30 for holding the ceiling panel 6, and wire W for connecting the building frame engaging member 20 and the panel fixing member 30.SELECTED DRAWING: Figure 5
【課題】天井パネルを建物の躯体に取り付ける作業を効率的かつ安定して実施できる天井パネル施工方法を提供する。【解決手段】建物1を構成する躯体2に天井パネル6を取り付ける天井パネル施工方法であって、天井パネル6が略鉛直となるように躯体2から懸下する天井パネル懸下工程と、天井パネル6を躯体2に固定する天井パネル取付工程と、を行う。このとき、躯体2に係合する係合部22を有する躯体係合部材20と、天井パネル6を保持するパネル固定部材30と、躯体係合部材20とパネル固定部材30を連結するワイヤーWと、を備える天井パネル仮受用治具10を用いてもよい。【選択図】図5
CEILING PANEL CONSTRUCTION METHOD
天井パネル施工方法
NAKAGAWA MASASHI (Autor:in) / TANAKA SHUSUI (Autor:in) / HOSHINO MASAKAZU (Autor:in) / BABA MINEO (Autor:in) / MATSUI YUKA (Autor:in) / HAYASHI TEPPEI (Autor:in) / NOMURA YUKI (Autor:in)
14.01.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
CEILING INTEGRAL FLOOR PANEL STRUCTURE AND CONSTRUCTION METHOD OF CEILING INTEGRAL FLOOR PANEL
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2023
|