Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD FOR EQUIPMENT INSTALLATION PEDESTAL, EQUIPMENT INSTALLATION PEDESTAL, AND FOUNDATION BOLT INSTALLATION TEMPLATE
To provide a construction method for equipment installation pedestal, an equipment installation pedestal, and a foundation bolt installation template to shorten the construction period and reduce construction costs.SOLUTION: The construction method for equipment installation pedestal comprises the steps of: arranging a plurality of secondary reinforcing bars 22 above a primary concrete structure 11; temporarily fixing a plurality of foundation bolts 14 to a foundation bolt installation template 13; arranging the foundation bolt installation template 13 in which the plurality of foundation bolts 14 are temporarily fixed above the primary concrete structure 11; and placing secondary concrete between the primary concrete structure 11 and the template 13 for installing foundation bolts to manufacture a secondary concrete structure 12.SELECTED DRAWING: Figure 1
【課題】施工期間の短縮を図ると共に施工コストの低減を図る、機器設置用架台の施工方法および機器設置用架台並びに基礎ボルト設置用テンプレートを提供する。【解決手段】1次コンクリート構造物11の上方に複数の2次鉄筋22を配置する工程と、複数の基礎ボルト14を基礎ボルト設置用テンプレート13に仮固定する工程と、1次コンクリート構造物11の上方に複数の基礎ボルト14が仮固定された基礎ボルト設置用テンプレート13を配置する工程と、1次コンクリート構造物11と前記基礎ボルト設置用テンプレート13との間に2次コンクリートを打設して2次コンクリート構造物12を製造する工程とを有する。【選択図】図1
CONSTRUCTION METHOD FOR EQUIPMENT INSTALLATION PEDESTAL, EQUIPMENT INSTALLATION PEDESTAL, AND FOUNDATION BOLT INSTALLATION TEMPLATE
To provide a construction method for equipment installation pedestal, an equipment installation pedestal, and a foundation bolt installation template to shorten the construction period and reduce construction costs.SOLUTION: The construction method for equipment installation pedestal comprises the steps of: arranging a plurality of secondary reinforcing bars 22 above a primary concrete structure 11; temporarily fixing a plurality of foundation bolts 14 to a foundation bolt installation template 13; arranging the foundation bolt installation template 13 in which the plurality of foundation bolts 14 are temporarily fixed above the primary concrete structure 11; and placing secondary concrete between the primary concrete structure 11 and the template 13 for installing foundation bolts to manufacture a secondary concrete structure 12.SELECTED DRAWING: Figure 1
【課題】施工期間の短縮を図ると共に施工コストの低減を図る、機器設置用架台の施工方法および機器設置用架台並びに基礎ボルト設置用テンプレートを提供する。【解決手段】1次コンクリート構造物11の上方に複数の2次鉄筋22を配置する工程と、複数の基礎ボルト14を基礎ボルト設置用テンプレート13に仮固定する工程と、1次コンクリート構造物11の上方に複数の基礎ボルト14が仮固定された基礎ボルト設置用テンプレート13を配置する工程と、1次コンクリート構造物11と前記基礎ボルト設置用テンプレート13との間に2次コンクリートを打設して2次コンクリート構造物12を製造する工程とを有する。【選択図】図1
CONSTRUCTION METHOD FOR EQUIPMENT INSTALLATION PEDESTAL, EQUIPMENT INSTALLATION PEDESTAL, AND FOUNDATION BOLT INSTALLATION TEMPLATE
機器設置用架台の施工方法および機器設置用架台並びに基礎ボルト設置用テンプレート
MORI NORIHISA (Autor:in) / KURODA JUNYA (Autor:in)
11.03.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Pedestal and Strut Installation Structure For Earth Anchor Construction
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2015
|Construction method for controlling installation precision of pedestal loading hole
Europäisches Patentamt | 2023
|