Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BRACE CONNECTING METAL FITTING
To improve work efficiency when connecting a brace bolt to a suspension bolt, and to obtain sufficient reinforcing strength without generating a fragile part in the suspension bolt.SOLUTION: A brace connecting metal fitting 1 is arranged along the outer peripheral surface of a hanging bolt 110, and has a metal fitting body 2 fixed to the hanging bolt 110, and connecting metal fittings 5 and 6 attached to the metal fitting body 2. The metal fitting body 2 has a predetermined length in the longitudinal direction of the hanging bolt 110. The connection metal fittings 5 and 6 are attached to the side surfaces 2a and 2b of the metal fitting body 2, and can be connected and fixed to the metal fitting body 2 by sandwiching a plurality of brace bolts 120 arranged in at least two directions between the side surfaces 2a and 2b of the metal fitting body 2.SELECTED DRAWING: Figure 2
【課題】ブレースボルトを吊りボルトに連結する際の作業効率を向上させるでき、しかも吊りボルトに脆弱な部分を生じさせることなく、十分な補強強度を得ることができるようにする。【解決手段】ブレース連結金具1は、吊りボルト110の外周面に沿うように配置され、吊りボルト110に固定される金具本体2と、金具本体2に取り付けられる連結金具5,6とを有する。金具本体2は、吊りボルト110の長手方向に所定長さを有する。連結金具5,6は、金具本体2の側面2a,2bに取り付けられ、金具本体2の側面2a,2bとの間に少なくとも2方向に配置される複数のブレースボルト120を挟み込んで金具本体2に連結固定することが可能な構成である。【選択図】図2
BRACE CONNECTING METAL FITTING
To improve work efficiency when connecting a brace bolt to a suspension bolt, and to obtain sufficient reinforcing strength without generating a fragile part in the suspension bolt.SOLUTION: A brace connecting metal fitting 1 is arranged along the outer peripheral surface of a hanging bolt 110, and has a metal fitting body 2 fixed to the hanging bolt 110, and connecting metal fittings 5 and 6 attached to the metal fitting body 2. The metal fitting body 2 has a predetermined length in the longitudinal direction of the hanging bolt 110. The connection metal fittings 5 and 6 are attached to the side surfaces 2a and 2b of the metal fitting body 2, and can be connected and fixed to the metal fitting body 2 by sandwiching a plurality of brace bolts 120 arranged in at least two directions between the side surfaces 2a and 2b of the metal fitting body 2.SELECTED DRAWING: Figure 2
【課題】ブレースボルトを吊りボルトに連結する際の作業効率を向上させるでき、しかも吊りボルトに脆弱な部分を生じさせることなく、十分な補強強度を得ることができるようにする。【解決手段】ブレース連結金具1は、吊りボルト110の外周面に沿うように配置され、吊りボルト110に固定される金具本体2と、金具本体2に取り付けられる連結金具5,6とを有する。金具本体2は、吊りボルト110の長手方向に所定長さを有する。連結金具5,6は、金具本体2の側面2a,2bに取り付けられ、金具本体2の側面2a,2bとの間に少なくとも2方向に配置される複数のブレースボルト120を挟み込んで金具本体2に連結固定することが可能な構成である。【選択図】図2
BRACE CONNECTING METAL FITTING
ブレース連結金具
IKUNO MAKOTO (Autor:in) / KOUCHI MAKOTO (Autor:in) / SANO MITSUTAKA (Autor:in) / YANADERA YOSHIAKI (Autor:in) / MORITA YOHEI (Autor:in) / KANEKO TAKASHI (Autor:in) / ARAI YASUYUKI (Autor:in) / MIYOSHI KOICHI (Autor:in) / IIDA HIROMORI (Autor:in)
01.04.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
/
F16B
DEVICES FOR FASTENING OR SECURING CONSTRUCTIONAL ELEMENTS OR MACHINE PARTS TOGETHER, e.g. NAILS, BOLTS, CIRCLIPS, CLAMPS, CLIPS OR WEDGES
,
Vorrichtungen zum Befestigen oder Sichern von Konstruktionselementen oder Maschinenteilen, z.B. Nägel, Bolzen, Schrauben, Sprengringe, Klemmen, Klammern oder Keile
CONSTRUCTION METHOD OF BRACE CONNECTING METAL FITTING
Europäisches Patentamt | 2017
|REINFORCEMENT BRACE CONNECTING METAL FITTING OF SUSPENDED CEILING
Europäisches Patentamt | 2016
|