PIER COLUMN HAVING SEISMIC PERFORMANCE GRADIENT
To provide a pier column having a seismic performance gradient and its construction method.SOLUTION: A pier column having a seismic performance gradient is composed of a concrete pier column, a reinforcing bar 1 arranged inside the pier column, and a gradient reinforcing material 2 arranged in a stepped manner. The gradient reinforcing material is a fibrous or shape memory alloy streak. The seismic performance gradient is formed in the pier column by changing the cross-sectional area of the gradient reinforcing material continuously or stepwise. During construction, the magnitude of the performance gradient of the pier column and the method of achieving it are determined according to a seismic stress state of the pier column, thereby, other cross sections of a performance gradient zone do not exceed a limit curvature before the top cross section of the performance gradient zone of the pier column reaches the limit curvature. In addition, it is possible to realize that the performance gradient zone of the pier column can reach a plastic state at the same time under the action of the earthquake, and a plastic deformation zone of the pier column becomes significantly larger, which greatly improves the deformation performance and energy consumption capacity. The seismic peak acceleration that can be resisted is greatly increased.SELECTED DRAWING: Figure 1
【課題】耐震性能勾配を有する橋脚柱及びその建設方法を提供する。【解決手段】該耐震性能勾配を有する橋脚柱は、コンクリート橋脚柱、橋脚柱内に配置された鉄筋1と、段階状に配置された勾配補強材2とを含んで構成されている。勾配補強材は、繊維筋又は形状記憶合金筋である。勾配補強材の断面積が連続的又は階段状に変化することにより、橋脚柱内に耐震性能勾配を形成する。建設中に、橋脚柱の地震応力状態に応じて、橋脚柱の性能勾配の大きさと実現方法を決定し、それにより橋脚柱の性能勾配ゾーンの頂部断面が限界曲率に達する前に、性能勾配ゾーンの他の断面がその限界曲率を超えない。また、地震の作用下で橋脚柱の性能勾配ゾーンが塑性状態に同時に達することを実現でき、橋脚柱の塑性変形ゾーンは、大幅に大きくなり、それにより変形性能やエネルギー消費容量などが大幅に改善され、抵抗できる地震ピーク加速度が大幅に増加する。【選択図】図1
PIER COLUMN HAVING SEISMIC PERFORMANCE GRADIENT
To provide a pier column having a seismic performance gradient and its construction method.SOLUTION: A pier column having a seismic performance gradient is composed of a concrete pier column, a reinforcing bar 1 arranged inside the pier column, and a gradient reinforcing material 2 arranged in a stepped manner. The gradient reinforcing material is a fibrous or shape memory alloy streak. The seismic performance gradient is formed in the pier column by changing the cross-sectional area of the gradient reinforcing material continuously or stepwise. During construction, the magnitude of the performance gradient of the pier column and the method of achieving it are determined according to a seismic stress state of the pier column, thereby, other cross sections of a performance gradient zone do not exceed a limit curvature before the top cross section of the performance gradient zone of the pier column reaches the limit curvature. In addition, it is possible to realize that the performance gradient zone of the pier column can reach a plastic state at the same time under the action of the earthquake, and a plastic deformation zone of the pier column becomes significantly larger, which greatly improves the deformation performance and energy consumption capacity. The seismic peak acceleration that can be resisted is greatly increased.SELECTED DRAWING: Figure 1
【課題】耐震性能勾配を有する橋脚柱及びその建設方法を提供する。【解決手段】該耐震性能勾配を有する橋脚柱は、コンクリート橋脚柱、橋脚柱内に配置された鉄筋1と、段階状に配置された勾配補強材2とを含んで構成されている。勾配補強材は、繊維筋又は形状記憶合金筋である。勾配補強材の断面積が連続的又は階段状に変化することにより、橋脚柱内に耐震性能勾配を形成する。建設中に、橋脚柱の地震応力状態に応じて、橋脚柱の性能勾配の大きさと実現方法を決定し、それにより橋脚柱の性能勾配ゾーンの頂部断面が限界曲率に達する前に、性能勾配ゾーンの他の断面がその限界曲率を超えない。また、地震の作用下で橋脚柱の性能勾配ゾーンが塑性状態に同時に達することを実現でき、橋脚柱の塑性変形ゾーンは、大幅に大きくなり、それにより変形性能やエネルギー消費容量などが大幅に改善され、抵抗できる地震ピーク加速度が大幅に増加する。【選択図】図1
PIER COLUMN HAVING SEISMIC PERFORMANCE GRADIENT
耐震性能勾配を有する橋脚柱
DENG JIANGDONG (Autor:in) / LIU AIRONG (Autor:in)
01.04.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E01D
BRIDGES
,
Brücken
Seismic Strengthening of Column-Pier-Cap Connections
British Library Conference Proceedings | 1998
|Seismic Strengthening of Column - Pier-Cap Connections
British Library Online Contents | 1998
|Pier column construction method and pier column template
Europäisches Patentamt | 2015
|Europäisches Patentamt | 2023
|