Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONCRETE CONSTRUCTION MANAGEMENT DEVICE
To provide a concrete construction management device capable of managing while sharing information on the concrete formation and concrete placement.SOLUTION: A concrete construction management device 100 includes: an acquisition unit 102 that acquires first information that is output from a concrete plant 10 manufacturing and supplying concrete, second information output from a concrete bucket 40 that accommodates concrete supplied by a concrete plant, third information output from a cable crane 80 that moves the concrete bucket along a wire rope stretched above the concrete placement target, and management information for managing concrete placement position and concrete composition according to the placement position; and a display unit 112 that displays images linked to the operating status of the concrete plant, the concrete bucket, and the cable crane based on the first information, the second information, the third information, and the management information.SELECTED DRAWING: Figure 4
【課題】コンクリートの生成とコンクリートの打設の情報を共有して管理できるコンクリート施工管理装置を提供する。【解決手段】コンクリートを製造及び供給するコンクリートプラント10から出力される第1情報と、コンクリートプラントにより供給されたコンクリートを収容するコンクリートバケット40から出力される第2情報と、コンクリートの打設対象の上方に張られたワイヤロープに沿ってコンクリートバケットを移動させるケーブルクレーン80から出力される第3情報と、コンクリートの打設位置と打設位置に応じたコンクリートの配合とを管理する管理情報と、を取得する取得部102と、第1情報、第2情報、第3情報及び管理情報に基づいて、コンクリートプラント、コンクリートバケット及びケーブルクレーンの稼働状況に連動した画像を表示する表示部112を備えることを特徴とする、コンクリート施工管理装置100である。【選択図】図4
CONCRETE CONSTRUCTION MANAGEMENT DEVICE
To provide a concrete construction management device capable of managing while sharing information on the concrete formation and concrete placement.SOLUTION: A concrete construction management device 100 includes: an acquisition unit 102 that acquires first information that is output from a concrete plant 10 manufacturing and supplying concrete, second information output from a concrete bucket 40 that accommodates concrete supplied by a concrete plant, third information output from a cable crane 80 that moves the concrete bucket along a wire rope stretched above the concrete placement target, and management information for managing concrete placement position and concrete composition according to the placement position; and a display unit 112 that displays images linked to the operating status of the concrete plant, the concrete bucket, and the cable crane based on the first information, the second information, the third information, and the management information.SELECTED DRAWING: Figure 4
【課題】コンクリートの生成とコンクリートの打設の情報を共有して管理できるコンクリート施工管理装置を提供する。【解決手段】コンクリートを製造及び供給するコンクリートプラント10から出力される第1情報と、コンクリートプラントにより供給されたコンクリートを収容するコンクリートバケット40から出力される第2情報と、コンクリートの打設対象の上方に張られたワイヤロープに沿ってコンクリートバケットを移動させるケーブルクレーン80から出力される第3情報と、コンクリートの打設位置と打設位置に応じたコンクリートの配合とを管理する管理情報と、を取得する取得部102と、第1情報、第2情報、第3情報及び管理情報に基づいて、コンクリートプラント、コンクリートバケット及びケーブルクレーンの稼働状況に連動した画像を表示する表示部112を備えることを特徴とする、コンクリート施工管理装置100である。【選択図】図4
CONCRETE CONSTRUCTION MANAGEMENT DEVICE
コンクリート施工管理装置
YAMASHITA TETSUKAZU (Autor:in) / TACHIBANA SUBARU (Autor:in) / MORIYAMA SHINOBU (Autor:in) / MORI HIDEO (Autor:in) / KASE TOSHIHISA (Autor:in)
10.06.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E04G
SCAFFOLDING
,
Baugerüste
CONCRETE CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT SYSTEM
Europäisches Patentamt | 2020
|