METHOD OF CONSTRUCTING CONCRETE FLOOR SURFACE
To provide a method of constructing a concrete floor surface that provides high level precision, cracking suppression and durability.SOLUTION: A method of constructing a concrete floor surface includes a first process S1 of casting concrete on a floor surface of a construction site, and a second process S2 of leveling the concrete floor surface 10 by a laser screed machine 30, and further includes a third process S3 of confirming the level of the concrete floor surface 10 leveled by the laser screed machine 30, and a fourth process S4 of performing re-vibration compaction to a predetermined time after confirming the level of the concrete floor surface 10, the re-vibration compaction being carried out based upon a bleeding measurement result obtained by a breeding measuring device.SELECTED DRAWING: Figure 1
【課題】高度なレベル精度、ひび割れ抑制、耐久性を実現することのできるコンクリート床面の施工方法の提供。【解決手段】コンクリート床面の施工方法はコンクリートを施工場所の床面に打設する第1工程S1と、レーザースクリード機30によってコンクリート床面10を均す第2工程S2とを含み、レーザースクリード機30によって均されたコンクリート床面10のレベルを確認する第3工程S3と、コンクリート床面10のレベルを確認した後所定時間経過に再振動締固めを行う第4工程S4とをさらに含み、再振動締固めは、ブリーディング計測装置によるブリーディング計測結果に基づいて行う。【選択図】図1
METHOD OF CONSTRUCTING CONCRETE FLOOR SURFACE
To provide a method of constructing a concrete floor surface that provides high level precision, cracking suppression and durability.SOLUTION: A method of constructing a concrete floor surface includes a first process S1 of casting concrete on a floor surface of a construction site, and a second process S2 of leveling the concrete floor surface 10 by a laser screed machine 30, and further includes a third process S3 of confirming the level of the concrete floor surface 10 leveled by the laser screed machine 30, and a fourth process S4 of performing re-vibration compaction to a predetermined time after confirming the level of the concrete floor surface 10, the re-vibration compaction being carried out based upon a bleeding measurement result obtained by a breeding measuring device.SELECTED DRAWING: Figure 1
【課題】高度なレベル精度、ひび割れ抑制、耐久性を実現することのできるコンクリート床面の施工方法の提供。【解決手段】コンクリート床面の施工方法はコンクリートを施工場所の床面に打設する第1工程S1と、レーザースクリード機30によってコンクリート床面10を均す第2工程S2とを含み、レーザースクリード機30によって均されたコンクリート床面10のレベルを確認する第3工程S3と、コンクリート床面10のレベルを確認した後所定時間経過に再振動締固めを行う第4工程S4とをさらに含み、再振動締固めは、ブリーディング計測装置によるブリーディング計測結果に基づいて行う。【選択図】図1
METHOD OF CONSTRUCTING CONCRETE FLOOR SURFACE
コンクリート床面の施工方法
MATAYOSHI YUJI (Autor:in)
07.10.2021
Patent
Elektronische Ressource
Japanisch
METHOD FOR CONSTRUCTING CONCRETE FLOOR STRUCTURE AND FLOOR STRUCTURE
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2023
|FLOOR FACE CONSTRUCTING TOOL, AND FLOOR FACE CONSTRUCTING METHOD
Europäisches Patentamt | 2020
|Europäisches Patentamt | 2023
|