Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FIXING TOOL OF PANEL AND INSTALLATION METHOD OF THE PANEL
To provide a fixing tool of a panel and an installation method of the panel capable of properly maintaining a pressing force of a spring part by torque management even if a screwing stroke of a bolt is changed.SOLUTION: A bolt 40 has a pointed part 43 at its tip, and the pointed part 43 is inserted into a locking part 21c formed in a spring part 21. A female screw member 30 positioned in a state where a female screw part 31a is slidable in a direction orthogonal to a screw shaft center is provided on the spring part 21 side of a through-hole formed in a flange or an auxiliary member 50. The female screw member 30 has a locking nut 31 having the female screw part 31a, and the pointed part 43 of the bolt 40 is projected to the spring part 21 side by screwing with the female screw part to adjust the elastic force.SELECTED DRAWING: Figure 5
【課題】ボルトの螺合ストロークが変わっても、トルク管理によりばね部の押し付け力を適正に保つことの可能なパネルの固定具及び同パネルの設置方法を提供すること。【解決手段】ボルト40は先端に尖り部43を有し、ばね部21に形成した係止部21cに尖り部43を挿入する。フランジまたは補助部材50に形成された貫通孔のばね部21側に雌ねじ部31aをねじ軸心との直交方向にスライド自在な状態で位置させる雌ねじ部材30を設ける。雌ねじ部材30は雌ねじ部31aを有する緩み止めナット31を有し、雌ねじ部との螺合によりボルト40の尖り部43をばね部21側に突き出して弾性力を調整可能とする。【選択図】 図5
FIXING TOOL OF PANEL AND INSTALLATION METHOD OF THE PANEL
To provide a fixing tool of a panel and an installation method of the panel capable of properly maintaining a pressing force of a spring part by torque management even if a screwing stroke of a bolt is changed.SOLUTION: A bolt 40 has a pointed part 43 at its tip, and the pointed part 43 is inserted into a locking part 21c formed in a spring part 21. A female screw member 30 positioned in a state where a female screw part 31a is slidable in a direction orthogonal to a screw shaft center is provided on the spring part 21 side of a through-hole formed in a flange or an auxiliary member 50. The female screw member 30 has a locking nut 31 having the female screw part 31a, and the pointed part 43 of the bolt 40 is projected to the spring part 21 side by screwing with the female screw part to adjust the elastic force.SELECTED DRAWING: Figure 5
【課題】ボルトの螺合ストロークが変わっても、トルク管理によりばね部の押し付け力を適正に保つことの可能なパネルの固定具及び同パネルの設置方法を提供すること。【解決手段】ボルト40は先端に尖り部43を有し、ばね部21に形成した係止部21cに尖り部43を挿入する。フランジまたは補助部材50に形成された貫通孔のばね部21側に雌ねじ部31aをねじ軸心との直交方向にスライド自在な状態で位置させる雌ねじ部材30を設ける。雌ねじ部材30は雌ねじ部31aを有する緩み止めナット31を有し、雌ねじ部との螺合によりボルト40の尖り部43をばね部21側に突き出して弾性力を調整可能とする。【選択図】 図5
FIXING TOOL OF PANEL AND INSTALLATION METHOD OF THE PANEL
パネルの固定具及び同パネルの設置方法
KIYAMA MASAKAZU (Autor:in) / HOSHINO YASUSHI (Autor:in) / HIRAOKA FUMIHIRO (Autor:in) / OBATA JINJU (Autor:in) / SATO TOMOYUKI (Autor:in)
11.11.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
SOUNDPROOF PANEL FIXING TOOL AND SOUNDPROOF PANEL FIXING METHOD
Europäisches Patentamt | 2020
|PANEL SUPPORT TOOL, FIXING STRUCTURE OF PANEL SUPPORT TOOL AND FIXING METHOD OF PANEL SUPPORT TOOL
Europäisches Patentamt | 2023
|FIXING TOOL FOR PANEL, PANEL STRUCTURE AND ESTABLISHMENT METHOD FOR PANEL
Europäisches Patentamt | 2019
|