Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION METHOD FOR SOIL MORTAR RETAINING WALL AT CORNER
To provide a construction method for a soil mortar retaining wall at a corner that suppresses the occurrence of cracks at a corner that is convex toward the excavation side, in corners of the retaining wall.SOLUTION: A special core material 22 is built in a corner 12 where first and second soil-mortar walls 11 and 13 intersect. The special core material 22 is composed of ordinary core material 20 (H-shaped steel) arranged diagonally and has a protruding portion 26 from the center of a web surface to the corner. After the construction of a retaining wall 10, prior to excavation of the inside of the wall, the perimeter of the excavated side of the corner 12 is partially excavated. Then, at the partially excavated area, deformation-preventing steel 30 (and steel plates 32) are installed in an L-shape in plan view to restrain the excavated side of the corner 12.SELECTED DRAWING: Figure 2
【課題】山留壁の隅角部のうち、掘削側に凸となる出隅部でのクラックの発生を抑制するソイルモルタル山留壁出隅部の施工方法を提供する。【解決手段】第1及び第2のソイルモルタル壁11、13が交差する出隅部12には、特殊芯材22を建て込む。特殊芯材22は、通常の芯材20(H形鋼)を斜めに配置してなるとともに、ウェブ面の中央からコーナー部に向かう突出部26を有する。山留壁10の構築後に、その内側を掘削するに先立って、出隅部12の掘削側の周囲を部分掘削する。そして、部分掘削箇所に、出隅部12の掘削側を拘束するように、平面視でL字状に変形防止用鋼材30(及び鋼板32)を設置する。【選択図】図2
CONSTRUCTION METHOD FOR SOIL MORTAR RETAINING WALL AT CORNER
To provide a construction method for a soil mortar retaining wall at a corner that suppresses the occurrence of cracks at a corner that is convex toward the excavation side, in corners of the retaining wall.SOLUTION: A special core material 22 is built in a corner 12 where first and second soil-mortar walls 11 and 13 intersect. The special core material 22 is composed of ordinary core material 20 (H-shaped steel) arranged diagonally and has a protruding portion 26 from the center of a web surface to the corner. After the construction of a retaining wall 10, prior to excavation of the inside of the wall, the perimeter of the excavated side of the corner 12 is partially excavated. Then, at the partially excavated area, deformation-preventing steel 30 (and steel plates 32) are installed in an L-shape in plan view to restrain the excavated side of the corner 12.SELECTED DRAWING: Figure 2
【課題】山留壁の隅角部のうち、掘削側に凸となる出隅部でのクラックの発生を抑制するソイルモルタル山留壁出隅部の施工方法を提供する。【解決手段】第1及び第2のソイルモルタル壁11、13が交差する出隅部12には、特殊芯材22を建て込む。特殊芯材22は、通常の芯材20(H形鋼)を斜めに配置してなるとともに、ウェブ面の中央からコーナー部に向かう突出部26を有する。山留壁10の構築後に、その内側を掘削するに先立って、出隅部12の掘削側の周囲を部分掘削する。そして、部分掘削箇所に、出隅部12の掘削側を拘束するように、平面視でL字状に変形防止用鋼材30(及び鋼板32)を設置する。【選択図】図2
CONSTRUCTION METHOD FOR SOIL MORTAR RETAINING WALL AT CORNER
ソイルモルタル山留壁出隅部の施工方法
YASUNAGA MASAMICHI (Autor:in)
25.11.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
RETAINING WALL CORNER BLOCK AND CORNER RETAINING WALL FORMING METHOD
Europäisches Patentamt | 2022
|CONSTRUCTION METHOD OF RETAINING WALL BY MORTAR SPRAYING
Europäisches Patentamt | 2016
|SOIL RETAINING WALL CONSTRUCTION METHOD AND SOIL RETAINING WALL CONSTRUCTED BY THIS
Europäisches Patentamt | 2019
Europäisches Patentamt | 2018
|SOIL RETAINING WALL CONSTRUCTION METHOD AND SOIL RETAINING WALL CONSTRUCTED BY THIS
Europäisches Patentamt | 2019
|