Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT DEVICE FOR PNEUMATIC CAISSON
To provide a construction management method and a construction management device for a pneumatic caisson allowing construction management to be improved in efficiency.SOLUTION: A construction management device comprises: three-dimensional configuration data acquisition means 18 acquiring three-dimensional configuration data of an excavation remained part 14; determination means 26 determining an area necessary to be deformed in the excavation remained part 14 by comparing the acquired three-dimensional configuration data with a predetermined planned value of the excavation remained part 14; image generation means 28 generating an image capable of visually recognizing the area necessary to be deformed when the excavation remained part 14 is projected on a surface GL of the ground; and projection means 20 projecting the generated image to the corresponding surface GL of the ground.SELECTED DRAWING: Figure 1
【課題】施工管理を効率化することができるニューマチックケーソンの施工管理方法および施工管理装置を提供する。【解決手段】掘残し部14の3次元形状データを取得する3次元形状データ取得手段18と、取得した3次元形状データと、あらかじめ設定した掘残し部14の計画値とを比較して、掘残し部14において変形が必要な領域を判定する判定手段26と、掘残し部14を含む地盤の表面GLに投射した際に、変形が必要な領域を視覚的に認識可能な画像を生成する画像生成手段28と、生成した画像を対応する地盤の表面GLに投射する投射手段20とを有するようにする。【選択図】図1
CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT DEVICE FOR PNEUMATIC CAISSON
To provide a construction management method and a construction management device for a pneumatic caisson allowing construction management to be improved in efficiency.SOLUTION: A construction management device comprises: three-dimensional configuration data acquisition means 18 acquiring three-dimensional configuration data of an excavation remained part 14; determination means 26 determining an area necessary to be deformed in the excavation remained part 14 by comparing the acquired three-dimensional configuration data with a predetermined planned value of the excavation remained part 14; image generation means 28 generating an image capable of visually recognizing the area necessary to be deformed when the excavation remained part 14 is projected on a surface GL of the ground; and projection means 20 projecting the generated image to the corresponding surface GL of the ground.SELECTED DRAWING: Figure 1
【課題】施工管理を効率化することができるニューマチックケーソンの施工管理方法および施工管理装置を提供する。【解決手段】掘残し部14の3次元形状データを取得する3次元形状データ取得手段18と、取得した3次元形状データと、あらかじめ設定した掘残し部14の計画値とを比較して、掘残し部14において変形が必要な領域を判定する判定手段26と、掘残し部14を含む地盤の表面GLに投射した際に、変形が必要な領域を視覚的に認識可能な画像を生成する画像生成手段28と、生成した画像を対応する地盤の表面GLに投射する投射手段20とを有するようにする。【選択図】図1
CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT DEVICE FOR PNEUMATIC CAISSON
ニューマチックケーソンの施工管理方法および施工管理装置
MAEDA YUICHI (Autor:in) / AONO YASUHISA (Autor:in) / TADA HIROYUKI (Autor:in) / ONO HIROTSUGU (Autor:in) / ENDO KAZUO (Autor:in) / SATO TAMOTSU (Autor:in)
13.12.2021
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION MANAGEMENT METHOD AND CONSTRUCTION MANAGEMENT DEVICE OF PNEUMATIC CAISSON
Europäisches Patentamt | 2023
|CAISSON CONSTRUCTION MANAGEMENT DEVICE AND CAISSON CONSTRUCTION METHOD
Europäisches Patentamt | 2017
|TELPHER CRANE FOR PNEUMATIC CAISSON AND CONSTRUCTION METHOD OF PNEUMATIC CAISSON
Europäisches Patentamt | 2015
|EARTH BUCKET AND PNEUMATIC CAISSON CONSTRUCTION METHOD
Europäisches Patentamt | 2023
|Open caisson construction auxiliary device and open caisson construction method
Europäisches Patentamt | 2023
|