Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
MANHOLE REHABILITATION STRUCTURE AND CONSTRUCTION METHOD THEREOF
To provide a manhole rehabilitation structure and construction method capable of transmitting the vertical load from above acting on a lid to a rehabilitation manhole while shortening the construction period in a manhole rehabilitation structure in which the rehabilitation manhole is installed inside an existing manhole.SOLUTION: A manhole rehabilitation structure 10 having an existing adjustment ring 14 placed on an existing manhole 20, and a rehabilitation manhole 12 installed inside the existing manhole has an annular notch formed on an inner surface of the existing adjustment ring 14 and extending over the entire circumference of the existing adjustment ring 14, and an annular load-transfer structure 30 that is fitted and installed in the annular notch and overlaps a top surface of the rehabilitation manhole 12. The load-transfer structure 30 is composed of a plurality of load-transfer pieces 40 divided in the circumferential direction.SELECTED DRAWING: Figure 1
【課題】既設マンホールの内側に、更生用マンホールを設置したマンホール更生構造において、施工期間の短縮化を図りながら蓋体に作用する上方からの鉛直荷重を更生用マンホールに伝達することができるマンホール更生構造及びその施工方法を提供する。【解決手段】既設マンホール20上に載置された既設調整リング14と、前記既設マンホールの内側に設置された更生用マンホール12と、を備えたマンホール更生構造10において、前記既設調整リング14の内周面に形成され、該既設調整リング14の全周に亘る環状切欠き部と、前記環状切欠き部に嵌合設置され、前記更生用マンホール12の上端面に重なる環状の荷重伝達構造体30と、を有する。前記荷重伝達構造体30は、周方向に分割された複数の荷重伝達片40で構成されている。【選択図】図1
MANHOLE REHABILITATION STRUCTURE AND CONSTRUCTION METHOD THEREOF
To provide a manhole rehabilitation structure and construction method capable of transmitting the vertical load from above acting on a lid to a rehabilitation manhole while shortening the construction period in a manhole rehabilitation structure in which the rehabilitation manhole is installed inside an existing manhole.SOLUTION: A manhole rehabilitation structure 10 having an existing adjustment ring 14 placed on an existing manhole 20, and a rehabilitation manhole 12 installed inside the existing manhole has an annular notch formed on an inner surface of the existing adjustment ring 14 and extending over the entire circumference of the existing adjustment ring 14, and an annular load-transfer structure 30 that is fitted and installed in the annular notch and overlaps a top surface of the rehabilitation manhole 12. The load-transfer structure 30 is composed of a plurality of load-transfer pieces 40 divided in the circumferential direction.SELECTED DRAWING: Figure 1
【課題】既設マンホールの内側に、更生用マンホールを設置したマンホール更生構造において、施工期間の短縮化を図りながら蓋体に作用する上方からの鉛直荷重を更生用マンホールに伝達することができるマンホール更生構造及びその施工方法を提供する。【解決手段】既設マンホール20上に載置された既設調整リング14と、前記既設マンホールの内側に設置された更生用マンホール12と、を備えたマンホール更生構造10において、前記既設調整リング14の内周面に形成され、該既設調整リング14の全周に亘る環状切欠き部と、前記環状切欠き部に嵌合設置され、前記更生用マンホール12の上端面に重なる環状の荷重伝達構造体30と、を有する。前記荷重伝達構造体30は、周方向に分割された複数の荷重伝達片40で構成されている。【選択図】図1
MANHOLE REHABILITATION STRUCTURE AND CONSTRUCTION METHOD THEREOF
マンホール更生構造及びその施工方法
OOKA TARO (Autor:in) / CHO MITSUYOSHI (Autor:in)
17.01.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
MANHOLE REHABILITATION METHOD AND MANHOLE REHABILITATION STRUCTURE
Europäisches Patentamt | 2017
|MANHOLE REHABILITATION STRUCTURE AND MANHOLE REHABILITATION METHOD
Europäisches Patentamt | 2018
|MANHOLE REHABILITATION METHOD AND MANHOLE REHABILITATION STRUCTURE
Europäisches Patentamt | 2022
|CONSTRUCTION METHOD FOR MANHOLE REHABILITATION STRUCTURE
Europäisches Patentamt | 2023
|