INSPECTION MAINTENANCE LIFTING/LOWERING DEVICE OF WIND POWER GENERATION TOWER
To provide an inspection maintenance lifting/lowering device of a wind power generation tower which allows one lifting/lowering cage laid on one rack rail and two guide rail frames to be assembled and lifted/lowered by a small number of operators.SOLUTION: First, a lifting/lowering cage 1 assembles a rack rail 5, a right guide rail frame 2 and a left guide rail frame 3 in the vicinity of a base end of a wind power generation tower, and the parts are installed on an outer peripheral surface 8 of the wind power generation tower. The left guide rail frame 3 is drawn upward, and is fixed by an ON/OFF magnet 10. Similarly, the right guide rail frame 2 is drawn upward, and is fixed by the ON/OFF magnet 10. A projection 16 of the rack rail 5 at a second stage is fit into a recess 15 of the rack rail 5 at a first stage, and is fixed thereto by a strong magnet 18. Sequentially, the lifting/lowering cage 1 can be raised along the rack rail 5 by repeating the above operations.SELECTED DRAWING: Figure 1
【課題】本発明は、1本のラックレール及び2本の案内レール枠に架設させた1台の昇降ケージを、少数の作業員によって組み立て昇降可能とする風力発電タワーの検査メンテナンス昇降装置を提供する。【解決手段】最初に、風力発電タワーの基端近くに昇降ケージ1がラックレール5、右案内レール枠2、左案内レール枠3を組み立てて風力発電タワーの外周面8に設置される。左案内レール枠3を上方に引き出し、ON/OFFマグネット10により固定する。同様にして、右案内レール枠2を上方に引き出し、ON/OFFマグネット10により固定する。そして、1段目のラックレール5の凹部15に2段目のラックレール5の凸部16を嵌合して強力マグネット18により固定する。順次、同様の動作を繰り返して、昇降ケージ1をラックレール5に沿って上昇させることができる。【選択図】図1
INSPECTION MAINTENANCE LIFTING/LOWERING DEVICE OF WIND POWER GENERATION TOWER
To provide an inspection maintenance lifting/lowering device of a wind power generation tower which allows one lifting/lowering cage laid on one rack rail and two guide rail frames to be assembled and lifted/lowered by a small number of operators.SOLUTION: First, a lifting/lowering cage 1 assembles a rack rail 5, a right guide rail frame 2 and a left guide rail frame 3 in the vicinity of a base end of a wind power generation tower, and the parts are installed on an outer peripheral surface 8 of the wind power generation tower. The left guide rail frame 3 is drawn upward, and is fixed by an ON/OFF magnet 10. Similarly, the right guide rail frame 2 is drawn upward, and is fixed by the ON/OFF magnet 10. A projection 16 of the rack rail 5 at a second stage is fit into a recess 15 of the rack rail 5 at a first stage, and is fixed thereto by a strong magnet 18. Sequentially, the lifting/lowering cage 1 can be raised along the rack rail 5 by repeating the above operations.SELECTED DRAWING: Figure 1
【課題】本発明は、1本のラックレール及び2本の案内レール枠に架設させた1台の昇降ケージを、少数の作業員によって組み立て昇降可能とする風力発電タワーの検査メンテナンス昇降装置を提供する。【解決手段】最初に、風力発電タワーの基端近くに昇降ケージ1がラックレール5、右案内レール枠2、左案内レール枠3を組み立てて風力発電タワーの外周面8に設置される。左案内レール枠3を上方に引き出し、ON/OFFマグネット10により固定する。同様にして、右案内レール枠2を上方に引き出し、ON/OFFマグネット10により固定する。そして、1段目のラックレール5の凹部15に2段目のラックレール5の凸部16を嵌合して強力マグネット18により固定する。順次、同様の動作を繰り返して、昇降ケージ1をラックレール5に沿って上昇させることができる。【選択図】図1
INSPECTION MAINTENANCE LIFTING/LOWERING DEVICE OF WIND POWER GENERATION TOWER
風力発電タワーの検査メンテナンス昇降装置
TAKAHASHI TOSHIHIRO (Autor:in)
27.01.2022
Patent
Elektronische Ressource
Japanisch
Rapid-rising lifting device for maintenance of power tower
Europäisches Patentamt | 2023
|Maintenance and overhaul device for wind power generation tower drum
Europäisches Patentamt | 2021
|