Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
WATER PASSAGE CONSTRUCTION METHOD
To provide a water passage construction method which enables the assembly work of a water passage assembly outside a groove excavated in the ground, thus facilitating the assembly work, resulting in improved workability.SOLUTION: A water passage construction method includes: a groove forming step of forming a groove in the ground; a flow passage part assembly step of assembling by combining a plurality of flow passage members made of steel plates; a water passage assembly step of assembling a water passage assembly by a waling material mounting step and a trim beam mounting step; an arrangement step of arranging the lifted water passage assembly in the groove formed in the ground; a connection step of arranging a plurality of water passage assemblies and connecting them; and a back-filling step of filling the gap between the water passage assembly and the groove. The water passage assembly step includes a plurality of water assembly steps. The arrangement step includes a plurality of arrangement steps. The connection step includes a plurality of connection steps. At least two steps progress simultaneously out of the groove forming step, at least a part of the plurality of water passage assembly steps, at least a part of the plurality of arrangement steps, at least a part of the plurality of connection steps and the back-filling step.SELECTED DRAWING: Figure 5
【課題】地盤に掘られた溝外での水路アセンブリの組立て作業を可能にすることにより組み立て作業を容易にし、施工性を改善した水路施工方法を提供する。【解決手段】地盤に溝を造成する溝造成工程と、鋼板の流路部材を複数組み合わせて組み立てる流路部組立工程、腹起材取付工程及び切梁取付工程により水路アセンブリを組み立てる水路アセンブリ工程と、吊り上げた水路アセンブリを地盤に形成されている溝に配置する配置工程と、水路アセンブリを複数配置し接続する接続工程と、水路アセンブリと溝との隙間を埋める埋め戻し工程とを備え、水路アセンブリ工程は、複数の水路アセンブリ工程を含み、配置工程は、複数の配置工程を含み、接続工程は、複数の接続工程を含み、溝造成工程、複数の水路アセンブリ工程の少なくとも一部、複数の配置工程の少なくとも一部、複数の接続工程の少なくとも一部及び埋め戻し工程のうち少なくとも2つの工程が同時に進行する。【選択図】図5
WATER PASSAGE CONSTRUCTION METHOD
To provide a water passage construction method which enables the assembly work of a water passage assembly outside a groove excavated in the ground, thus facilitating the assembly work, resulting in improved workability.SOLUTION: A water passage construction method includes: a groove forming step of forming a groove in the ground; a flow passage part assembly step of assembling by combining a plurality of flow passage members made of steel plates; a water passage assembly step of assembling a water passage assembly by a waling material mounting step and a trim beam mounting step; an arrangement step of arranging the lifted water passage assembly in the groove formed in the ground; a connection step of arranging a plurality of water passage assemblies and connecting them; and a back-filling step of filling the gap between the water passage assembly and the groove. The water passage assembly step includes a plurality of water assembly steps. The arrangement step includes a plurality of arrangement steps. The connection step includes a plurality of connection steps. At least two steps progress simultaneously out of the groove forming step, at least a part of the plurality of water passage assembly steps, at least a part of the plurality of arrangement steps, at least a part of the plurality of connection steps and the back-filling step.SELECTED DRAWING: Figure 5
【課題】地盤に掘られた溝外での水路アセンブリの組立て作業を可能にすることにより組み立て作業を容易にし、施工性を改善した水路施工方法を提供する。【解決手段】地盤に溝を造成する溝造成工程と、鋼板の流路部材を複数組み合わせて組み立てる流路部組立工程、腹起材取付工程及び切梁取付工程により水路アセンブリを組み立てる水路アセンブリ工程と、吊り上げた水路アセンブリを地盤に形成されている溝に配置する配置工程と、水路アセンブリを複数配置し接続する接続工程と、水路アセンブリと溝との隙間を埋める埋め戻し工程とを備え、水路アセンブリ工程は、複数の水路アセンブリ工程を含み、配置工程は、複数の配置工程を含み、接続工程は、複数の接続工程を含み、溝造成工程、複数の水路アセンブリ工程の少なくとも一部、複数の配置工程の少なくとも一部、複数の接続工程の少なくとも一部及び埋め戻し工程のうち少なくとも2つの工程が同時に進行する。【選択図】図5
WATER PASSAGE CONSTRUCTION METHOD
水路施工方法
WADA HIROSHI (Autor:in) / KAMAZAKI YUJI (Autor:in)
08.02.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02B
HYDRAULIC ENGINEERING
,
Wasserbau
CONSTRUCTION METHOD OF WATER PASSAGE, AND JACKING MACHINE
Europäisches Patentamt | 2017
|