Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FIRE-RESISTANT WALL
To improve fire resistance performance while reducing material cost and construction cost of a fire-resistant covering material in a fire-resistant wall including a structural steel aggregate.SOLUTION: A fire-resistant wall comprises: a first and second finishing material constituting a wall surface; a first and second finishing material constituting a wall surface, and a structural steel frame material disposed between the first and second finishing materials so that a first gap part is formed between each of the first and second finishing materials; an opening formed in a direction intersecting the wall surface and penetrating the first and second finishing materials and a second gap part formed between the first and second finishing materials and not intervened by structural steel members; and a third finishing material facing the opening part and disposed so that a third gap part is formed between the third finishing material and the structural steel members; an air layer formed in the first, second, and third gap parts.SELECTED DRAWING: Figure 15
【課題】構造鉄骨材を含む耐火壁において、耐火被覆材の材料コストおよび施工コストを削減しながら耐火性能を向上させる。【解決手段】壁面を構成する第1および第2の仕上材と、第1および第2の仕上材の間に、第1および第2の仕上材のそれぞれとの間に第1の隙間部が形成されるように配置される構造鉄骨材と、壁面に交差する方向に形成され、第1および第2の仕上材、ならびに第1および第2の仕上材の間に形成され構造鉄骨材が介在しない第2の隙間部を貫通する開口部と、開口部に面し、構造鉄骨材との間に第3の隙間部が形成されるように配置される第3の仕上材とを備え、第1、第2および第3の隙間部に空気層が形成される耐火壁が提供される。【選択図】図15
FIRE-RESISTANT WALL
To improve fire resistance performance while reducing material cost and construction cost of a fire-resistant covering material in a fire-resistant wall including a structural steel aggregate.SOLUTION: A fire-resistant wall comprises: a first and second finishing material constituting a wall surface; a first and second finishing material constituting a wall surface, and a structural steel frame material disposed between the first and second finishing materials so that a first gap part is formed between each of the first and second finishing materials; an opening formed in a direction intersecting the wall surface and penetrating the first and second finishing materials and a second gap part formed between the first and second finishing materials and not intervened by structural steel members; and a third finishing material facing the opening part and disposed so that a third gap part is formed between the third finishing material and the structural steel members; an air layer formed in the first, second, and third gap parts.SELECTED DRAWING: Figure 15
【課題】構造鉄骨材を含む耐火壁において、耐火被覆材の材料コストおよび施工コストを削減しながら耐火性能を向上させる。【解決手段】壁面を構成する第1および第2の仕上材と、第1および第2の仕上材の間に、第1および第2の仕上材のそれぞれとの間に第1の隙間部が形成されるように配置される構造鉄骨材と、壁面に交差する方向に形成され、第1および第2の仕上材、ならびに第1および第2の仕上材の間に形成され構造鉄骨材が介在しない第2の隙間部を貫通する開口部と、開口部に面し、構造鉄骨材との間に第3の隙間部が形成されるように配置される第3の仕上材とを備え、第1、第2および第3の隙間部に空気層が形成される耐火壁が提供される。【選択図】図15
FIRE-RESISTANT WALL
耐火壁
KIMURA KEI (Autor:in) / KUWATA RYOHEI (Autor:in) / HIROSHIMA SATORU (Autor:in) / SHIMIZU NOBUTAKA (Autor:in) / TERASAWA HIROOKI (Autor:in) / SUZUKI YUSUKE (Autor:in) / HAYASHI TORU (Autor:in) / ENDO YOSHIAKI (Autor:in) / AIDA YU (Autor:in) / KOBAYASHI YUSUKE (Autor:in)
11.03.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS