Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
INSTALLATION MECHANISM OF SCREEN DEVICE IN BUILDING OPENING
To make it possible to simplify the operation of fixedly inserting and removing a screen device into and out of a building opening 1, etc. by allowing the insertion and removal of flexible resin strips 4 attached to both ends of a screen 3 through an insertion/removal port 10 at one end of a rail member 8 in a side frame 2 of the opening.SOLUTION: The insertion/removal ports 10 are provided in the rail members 8 attached to the side frames 2 at both ends of the building opening so as to oppose to grooves 9 which allow for insertion of the flexible resin strips 4 attached to both ends of the screen 3 and are positioned at one end of both rail members 8 to allow for insertions of the resin strips at both ends of the screen such that the resin strips are bent at an angle from the interior side of the building opening. Meanwhile, the flexible resin strips attached to the side ends of the screen are formed with a slipping-out preventing part 4a for preventing slipping-out from the grooves protrusively provided at a part positioned in the rail member, which serves as a holding mechanism for holding the screen in an extended state between upper and lower ends of the screen and upper and lower ends of the building opening.SELECTED DRAWING: Figure 1
【課題】建物開口部1等にスクリーン装置を固定的に挿脱する操作を、該開口部側枠2に設けたレール部材8の一端の挿脱口10を通して、スクリーン3の両側端に取り付けた可撓の樹脂帯材4を挿脱可能にし、簡易な操作を可能にする。【解決手段】建物開口部の両側端の側枠2に取り付けたレール部材8に、スクリーン3の両側端に取り付けた可撓の樹脂帯材4を挿通するための通溝9に対向させて開設し、該両レール部材8の一端に、上記スクリーンの両側端の樹脂帯材を建物開口部の室内側から斜めに曲げて該通溝に挿脱可能にした挿脱口10を設ける。一方、スクリーンの側端に取り付けた可撓の樹脂帯材は、レール部材内に位置する部位に上記通溝から抜け出すのを阻止する抜け止め部4aが突設され、上記スクリーンの上下端と、建物開口部の上下端との間に、該スクリーンを展張状態に保持する保持機構を備えたものとする。【選択図】図1
INSTALLATION MECHANISM OF SCREEN DEVICE IN BUILDING OPENING
To make it possible to simplify the operation of fixedly inserting and removing a screen device into and out of a building opening 1, etc. by allowing the insertion and removal of flexible resin strips 4 attached to both ends of a screen 3 through an insertion/removal port 10 at one end of a rail member 8 in a side frame 2 of the opening.SOLUTION: The insertion/removal ports 10 are provided in the rail members 8 attached to the side frames 2 at both ends of the building opening so as to oppose to grooves 9 which allow for insertion of the flexible resin strips 4 attached to both ends of the screen 3 and are positioned at one end of both rail members 8 to allow for insertions of the resin strips at both ends of the screen such that the resin strips are bent at an angle from the interior side of the building opening. Meanwhile, the flexible resin strips attached to the side ends of the screen are formed with a slipping-out preventing part 4a for preventing slipping-out from the grooves protrusively provided at a part positioned in the rail member, which serves as a holding mechanism for holding the screen in an extended state between upper and lower ends of the screen and upper and lower ends of the building opening.SELECTED DRAWING: Figure 1
【課題】建物開口部1等にスクリーン装置を固定的に挿脱する操作を、該開口部側枠2に設けたレール部材8の一端の挿脱口10を通して、スクリーン3の両側端に取り付けた可撓の樹脂帯材4を挿脱可能にし、簡易な操作を可能にする。【解決手段】建物開口部の両側端の側枠2に取り付けたレール部材8に、スクリーン3の両側端に取り付けた可撓の樹脂帯材4を挿通するための通溝9に対向させて開設し、該両レール部材8の一端に、上記スクリーンの両側端の樹脂帯材を建物開口部の室内側から斜めに曲げて該通溝に挿脱可能にした挿脱口10を設ける。一方、スクリーンの側端に取り付けた可撓の樹脂帯材は、レール部材内に位置する部位に上記通溝から抜け出すのを阻止する抜け止め部4aが突設され、上記スクリーンの上下端と、建物開口部の上下端との間に、該スクリーンを展張状態に保持する保持機構を備えたものとする。【選択図】図1
INSTALLATION MECHANISM OF SCREEN DEVICE IN BUILDING OPENING
建物開口部へのスクリーン装置の設置機構
MORIYA MASAHITO (Autor:in) / SAWAGUCHI NAOTO (Autor:in)
15.04.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E06B
Feste oder bewegliche Abschlüsse für Öffnungen in Bauwerken, Fahrzeugen, Zäunen oder ähnlichen Einfriedungen allgemein, z.B. Türen, Fenster, Läden, Tore
,
FIXED OR MOVABLE CLOSURES FOR OPENINGS IN BUILDINGS, VEHICLES, FENCES, OR LIKE ENCLOSURES, IN GENERAL, e.g. DOORS, WINDOWS, BLINDS, GATES
INSTALLATION MECHANISM OF BUILDING AND INSTALLATION METHOD FOR BUILDING
Europäisches Patentamt | 2022
|