CONSTRUCTION METHOD OF BUILDING INTERIOR WORK
To provide a construction method of building interior work capable of performing in-ceiling work and on-floor work in parallel so as to enable reducing the construction period of the interior work as a whole.SOLUTION: The construction method of building interior work includes in-ceiling work and on-floor work which are carried out on each floor of a building 2. The construction method includes: a first step of building a suspended ceiling structure 6 which is configured suspending and supporting a plurality of ceiling panels 8 with a plurality of suspension materials 9, and withstands at least the in-ceiling work on the ceiling panels, in which the plurality of ceiling panels has strength to withstand weight of a worker P and a load C, and is arranged over the entire floor, separated downward from a ceiling of the floor at an interval allowing a person to stand and walk, so as to form a ceiling finish surface 8a, and the plurality of suspension materials is suspended from the ceiling of the floor, and has strength to support the weight of workers, the load and the ceiling panels; and a second step of carrying out parallelly the in-ceiling work proceeding sequentially toward the entire floor on the ceiling panel and the on-floor work proceeding sequentially toward the entire floor on a floor slab 1 of the floor to complete the interior work.SELECTED DRAWING: Figure 6
【課題】天井内工事と床上工事とを並行して行うことが可能で、内装工事の工期を全体として短縮することが可能な建物の内装工事の施工方法を提供する。【解決手段】建物2の階層に対して実施される天井内工事と床上工事を含む内装工事の施工方法であって、作業員Pと荷Cの重量に耐える強度を有し、階層の全域にわたり、当該階層の天井から下方へ作業員の立位歩行が可能な間隔を隔てて配設されて天井仕上げ面8aを形成する複数枚の天井パネル8を、階層の天井から複数本吊り下げられ、人と荷及び天井パネルの重量を支持する強度を有する吊り材9で吊り支持して構成され、少なくとも天井パネル上の天井内工事に耐える吊り天井構造6を構築する第1工程と、次いで、天井パネル上で階層の全域に向けて順次進められていく天井内工事と、階層の床面1aで当該階層の全域に向けて順次進められていく床上工事とを並行して行って内装工事を完了する第2工程とを含む。【選択図】図6
CONSTRUCTION METHOD OF BUILDING INTERIOR WORK
To provide a construction method of building interior work capable of performing in-ceiling work and on-floor work in parallel so as to enable reducing the construction period of the interior work as a whole.SOLUTION: The construction method of building interior work includes in-ceiling work and on-floor work which are carried out on each floor of a building 2. The construction method includes: a first step of building a suspended ceiling structure 6 which is configured suspending and supporting a plurality of ceiling panels 8 with a plurality of suspension materials 9, and withstands at least the in-ceiling work on the ceiling panels, in which the plurality of ceiling panels has strength to withstand weight of a worker P and a load C, and is arranged over the entire floor, separated downward from a ceiling of the floor at an interval allowing a person to stand and walk, so as to form a ceiling finish surface 8a, and the plurality of suspension materials is suspended from the ceiling of the floor, and has strength to support the weight of workers, the load and the ceiling panels; and a second step of carrying out parallelly the in-ceiling work proceeding sequentially toward the entire floor on the ceiling panel and the on-floor work proceeding sequentially toward the entire floor on a floor slab 1 of the floor to complete the interior work.SELECTED DRAWING: Figure 6
【課題】天井内工事と床上工事とを並行して行うことが可能で、内装工事の工期を全体として短縮することが可能な建物の内装工事の施工方法を提供する。【解決手段】建物2の階層に対して実施される天井内工事と床上工事を含む内装工事の施工方法であって、作業員Pと荷Cの重量に耐える強度を有し、階層の全域にわたり、当該階層の天井から下方へ作業員の立位歩行が可能な間隔を隔てて配設されて天井仕上げ面8aを形成する複数枚の天井パネル8を、階層の天井から複数本吊り下げられ、人と荷及び天井パネルの重量を支持する強度を有する吊り材9で吊り支持して構成され、少なくとも天井パネル上の天井内工事に耐える吊り天井構造6を構築する第1工程と、次いで、天井パネル上で階層の全域に向けて順次進められていく天井内工事と、階層の床面1aで当該階層の全域に向けて順次進められていく床上工事とを並行して行って内装工事を完了する第2工程とを含む。【選択図】図6
CONSTRUCTION METHOD OF BUILDING INTERIOR WORK
建物の内装工事の施工方法
NII KENSAKU (Autor:in)
23.05.2022
Patent