FLOATING BODY STRUCTURE CARRYING-OUT METHOD AND SUBMERGING FRAME
To provide a floating body structure carrying-out method dispensing with a large scale mound and a pile-type underwater frame and dispensing with complicated fine adjustment to a launching barge, when performing loading work of the floating body in a state of the launching barge grounded at the front surface of a quay, and a submerging frame.SOLUTION: A floating body structure carrying-out method comprises steps of: correcting water bottom for performing unevenness correction of water bottom 5 in front of a mooring facility 2; submerging a submerging frame 4 on the unevenness-corrected water bottom 5; shore- arriving a barge to shore-arrive a launching barge 3 to the mooring facility 2 and to bottom the launching barge 3 on the submerging frame 4; loading a floating body structure 1 on the launching barge 3 from the mooring facility 2; and floating the launching barge 3 and leaving from the mooring facility 2.SELECTED DRAWING: Figure 1
【課題】岸壁前面で進水台船を着底させた状態で浮体構造物の搭載作業を行うにあたり、大規模なマウンドや杭式の水中架台等を要せず、かつ、進水台船に対して複雑な微調整を要しない浮体構造物搬出方法および沈設架台を提供する。【解決手段】係留施設2前の水底5の不陸整正を行う水底整正工程と、不陸整正を行った水底5に沈設架台4を沈設する架台沈設工程と、進水台船3を係留施設2に着岸させるとともに進水台船3を沈設架台4に着底させる台船着岸工程と、浮体構造物1を係留施設2から進水台船3上に移動させる構造物搭載工程と、進水台船3を浮上させるとともに係留施設2から離岸させる台船離岸工程とを備えている。【選択図】図1
FLOATING BODY STRUCTURE CARRYING-OUT METHOD AND SUBMERGING FRAME
To provide a floating body structure carrying-out method dispensing with a large scale mound and a pile-type underwater frame and dispensing with complicated fine adjustment to a launching barge, when performing loading work of the floating body in a state of the launching barge grounded at the front surface of a quay, and a submerging frame.SOLUTION: A floating body structure carrying-out method comprises steps of: correcting water bottom for performing unevenness correction of water bottom 5 in front of a mooring facility 2; submerging a submerging frame 4 on the unevenness-corrected water bottom 5; shore- arriving a barge to shore-arrive a launching barge 3 to the mooring facility 2 and to bottom the launching barge 3 on the submerging frame 4; loading a floating body structure 1 on the launching barge 3 from the mooring facility 2; and floating the launching barge 3 and leaving from the mooring facility 2.SELECTED DRAWING: Figure 1
【課題】岸壁前面で進水台船を着底させた状態で浮体構造物の搭載作業を行うにあたり、大規模なマウンドや杭式の水中架台等を要せず、かつ、進水台船に対して複雑な微調整を要しない浮体構造物搬出方法および沈設架台を提供する。【解決手段】係留施設2前の水底5の不陸整正を行う水底整正工程と、不陸整正を行った水底5に沈設架台4を沈設する架台沈設工程と、進水台船3を係留施設2に着岸させるとともに進水台船3を沈設架台4に着底させる台船着岸工程と、浮体構造物1を係留施設2から進水台船3上に移動させる構造物搭載工程と、進水台船3を浮上させるとともに係留施設2から離岸させる台船離岸工程とを備えている。【選択図】図1
FLOATING BODY STRUCTURE CARRYING-OUT METHOD AND SUBMERGING FRAME
浮体構造物搬出方法および沈設架台
KOKAYU TARO (Autor:in)
13.06.2022
Patent
Elektronische Ressource
Japanisch
Lake submerging and floating floor construction technology
Europäisches Patentamt | 2024
|SUBMERGING INSTALLATION METHOD FOR CYLINDRICAL BODY, AND SUBMERGING INSTALLATION SUPPORT SYSTEM
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2015
|Swimming pool submerging and floating type automatic navigation sewage suction device
Europäisches Patentamt | 2022
|