Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
EQUIPMENT FOUNDATION STRUCTURE
To provide technology that can reduce the size of the entire structure while improving construction efficiency in equipment foundation structure installed on slabs such as rooftops.SOLUTION: The present invention comprises a precast concrete equipment foundation body 10 installed on a slab 5 with a fixing member 30, which is formed in a tubular shape having a through hole 10A penetrating vertically in the central portion and protruding upward from the slab 5, inserted through the through hole 10A, and a filler curing portion 20 formed by filling and curing a filler in the through hole 10A of the equipment foundation main body 10 into which the fixing member 30 is inserted. A plurality of anchor members 15 for fixing the equipment are arranged inside the plurality of foundation pillar main bars 11 in the equipment foundation main body 10.SELECTED DRAWING: Figure 1
【課題】屋上などのスラブ上に設置される設備基礎構造において施工効率を向上しながら構造全体の小型化を図ることができる技術を提供する。【解決手段】上下に貫通する貫通孔10Aを中央部に有する筒状に形成されて、スラブ5から上方に突出された定着用部材30を貫通孔10Aに挿通させた状態でスラブ5上に設置されるプレキャストコンクリート製の設備基礎本体10と、定着用部材30が挿通された設備基礎本体10の貫通孔10Aに充填材を充填して硬化させてなる充填材硬化部20と、を備え、設備を固定するための複数のアンカー部材15が、設備基礎本体10における複数の基礎柱主筋11の内側に配置されている。【選択図】図1
EQUIPMENT FOUNDATION STRUCTURE
To provide technology that can reduce the size of the entire structure while improving construction efficiency in equipment foundation structure installed on slabs such as rooftops.SOLUTION: The present invention comprises a precast concrete equipment foundation body 10 installed on a slab 5 with a fixing member 30, which is formed in a tubular shape having a through hole 10A penetrating vertically in the central portion and protruding upward from the slab 5, inserted through the through hole 10A, and a filler curing portion 20 formed by filling and curing a filler in the through hole 10A of the equipment foundation main body 10 into which the fixing member 30 is inserted. A plurality of anchor members 15 for fixing the equipment are arranged inside the plurality of foundation pillar main bars 11 in the equipment foundation main body 10.SELECTED DRAWING: Figure 1
【課題】屋上などのスラブ上に設置される設備基礎構造において施工効率を向上しながら構造全体の小型化を図ることができる技術を提供する。【解決手段】上下に貫通する貫通孔10Aを中央部に有する筒状に形成されて、スラブ5から上方に突出された定着用部材30を貫通孔10Aに挿通させた状態でスラブ5上に設置されるプレキャストコンクリート製の設備基礎本体10と、定着用部材30が挿通された設備基礎本体10の貫通孔10Aに充填材を充填して硬化させてなる充填材硬化部20と、を備え、設備を固定するための複数のアンカー部材15が、設備基礎本体10における複数の基礎柱主筋11の内側に配置されている。【選択図】図1
EQUIPMENT FOUNDATION STRUCTURE
設備基礎構造
NAKASONE YOSHIYUKI (Autor:in) / YAMASHITA YASUHIKO (Autor:in) / OKUNO YUICHIRO (Autor:in) / MORISHITA YASUNARI (Autor:in)
29.06.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Foundation structure construction equipment for housing building
Europäisches Patentamt | 2024
|