Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SUPPORT METHOD FOR MARKING PILE HEAD REINFORCING BAR POSITION
To easily mark a preferable pile head reinforcing bar position while avoiding interference with a beam main reinforcing bar on a pile head after driving a pile.SOLUTION: In a support method for marking a pile head reinforcing bar position for a pile head 3A to which a plurality of pile head reinforcing bars are welded and joined, an MR device 1 is used that constructs a mixed reality by projecting virtual information in a superimposed state in which a reference point P is aligned with a real space, as the virtual information, drawing data of a pile head reinforcing bar arrangement diagram indicating the arrangement of the pile head reinforcing bars with respect to the pile head 3A actually measured after driving a pile is imported into the MR device 1, and the MR device 1 projects the pile head reinforcing bar arrangement diagram onto the pile head 3A in the real space.SELECTED DRAWING: Figure 2
【課題】杭打ち後の杭頭に対して梁主筋との干渉が回避された好適な杭頭補強筋位置の墨出しを容易に行えるようにする。【解決手段】複数の杭頭補強筋が溶接接合される杭頭3Aに対する杭頭補強筋位置の墨出しを支援する杭頭補強筋位置の墨出し支援方法において、仮想情報を現実空間に基準ポイントPを一致させて重畳させた状態で投影して複合現実を構築するMRデバイス1を使用し、仮想情報として、杭打ち後に実測した杭頭3Aに対する杭頭補強筋の配置を示す杭頭補強筋配置図の図面データをMRデバイス1に取り込み、MRデバイス1にて、現実空間の杭頭3A上に杭頭補強筋配置図を投影する。【選択図】図2
SUPPORT METHOD FOR MARKING PILE HEAD REINFORCING BAR POSITION
To easily mark a preferable pile head reinforcing bar position while avoiding interference with a beam main reinforcing bar on a pile head after driving a pile.SOLUTION: In a support method for marking a pile head reinforcing bar position for a pile head 3A to which a plurality of pile head reinforcing bars are welded and joined, an MR device 1 is used that constructs a mixed reality by projecting virtual information in a superimposed state in which a reference point P is aligned with a real space, as the virtual information, drawing data of a pile head reinforcing bar arrangement diagram indicating the arrangement of the pile head reinforcing bars with respect to the pile head 3A actually measured after driving a pile is imported into the MR device 1, and the MR device 1 projects the pile head reinforcing bar arrangement diagram onto the pile head 3A in the real space.SELECTED DRAWING: Figure 2
【課題】杭打ち後の杭頭に対して梁主筋との干渉が回避された好適な杭頭補強筋位置の墨出しを容易に行えるようにする。【解決手段】複数の杭頭補強筋が溶接接合される杭頭3Aに対する杭頭補強筋位置の墨出しを支援する杭頭補強筋位置の墨出し支援方法において、仮想情報を現実空間に基準ポイントPを一致させて重畳させた状態で投影して複合現実を構築するMRデバイス1を使用し、仮想情報として、杭打ち後に実測した杭頭3Aに対する杭頭補強筋の配置を示す杭頭補強筋配置図の図面データをMRデバイス1に取り込み、MRデバイス1にて、現実空間の杭頭3A上に杭頭補強筋配置図を投影する。【選択図】図2
SUPPORT METHOD FOR MARKING PILE HEAD REINFORCING BAR POSITION
杭頭補強筋位置の墨出し支援方法
MATSUKUBO TSUMUMI (Autor:in) / HAMADA NAOKI (Autor:in) / YAMADA KYOSUKE (Autor:in)
26.09.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
/
G06T
Bilddatenverarbeitung oder Bilddatenerzeugung allgemein
,
IMAGE DATA PROCESSING OR GENERATION, IN GENERAL
/
G09G
Anordnungen oder Schaltungen zur Steuerung oder Regelung von Anzeigevorrichtungen mit statischen Mitteln zur Darstellung veränderlicher Informationen
,
ARRANGEMENTS OR CIRCUITS FOR CONTROL OF INDICATING DEVICES USING STATIC MEANS TO PRESENT VARIABLE INFORMATION