CLADDING CONSTRUCTION METHOD
To provide a cladding construction method for fitting a cladding to the outer peripheral part of a prescribed floor of a structure, which can improve workability of the cladding.SOLUTION: The cladding construction method for fitting a cladding 30 to the outer peripheral part of an installing floor 10S of a structure 10 comprises: a transportation step of lifting the cladding 30 by a lifting material 58 of a transportation machine 40 at the installing floor 10S, and transporting the cladding through an opening 18 of the installing floor 10S to the outside of the structure 10; and a fitting step of fitting the cladding 30 lifted by the lifting material 58 outside the structure 10 to the outer peripheral part of the installing floor 10S.SELECTED DRAWING: Figure 6
【課題】構造物の所定階の外周部に外装材を取り付ける外装材施工方法において、外装材の施工性を向上することを目的とする。【解決手段】外装材施工方法は、構造物10の設置階10Sの外周部に、外装材30を取り付ける外装材施工方法であって、設置階10Sにおいて、運搬機40の吊材58によって外装材30を吊り上げ、設置階10Sの開口18から構造物10の外部へ運搬する運搬工程と、構造物10の外部で吊材58に吊り下げられた外装材30を、設置階10Sの外周部に取り付ける取付工程と、を備える。【選択図】図6
CLADDING CONSTRUCTION METHOD
To provide a cladding construction method for fitting a cladding to the outer peripheral part of a prescribed floor of a structure, which can improve workability of the cladding.SOLUTION: The cladding construction method for fitting a cladding 30 to the outer peripheral part of an installing floor 10S of a structure 10 comprises: a transportation step of lifting the cladding 30 by a lifting material 58 of a transportation machine 40 at the installing floor 10S, and transporting the cladding through an opening 18 of the installing floor 10S to the outside of the structure 10; and a fitting step of fitting the cladding 30 lifted by the lifting material 58 outside the structure 10 to the outer peripheral part of the installing floor 10S.SELECTED DRAWING: Figure 6
【課題】構造物の所定階の外周部に外装材を取り付ける外装材施工方法において、外装材の施工性を向上することを目的とする。【解決手段】外装材施工方法は、構造物10の設置階10Sの外周部に、外装材30を取り付ける外装材施工方法であって、設置階10Sにおいて、運搬機40の吊材58によって外装材30を吊り上げ、設置階10Sの開口18から構造物10の外部へ運搬する運搬工程と、構造物10の外部で吊材58に吊り下げられた外装材30を、設置階10Sの外周部に取り付ける取付工程と、を備える。【選択図】図6
CLADDING CONSTRUCTION METHOD
外装材施工方法
NAKAGAWA KEITARO (Autor:in) / MIFUNE KOTARO (Autor:in)
24.10.2022
Patent
Elektronische Ressource
Japanisch
Editorial: Construction and cladding
Online Contents | 1994
|Construction method of cover-excavation method cladding system
Europäisches Patentamt | 2020
|Large steel cladding modular structure and construction method thereof
Europäisches Patentamt | 2024
|