To provide a connection structure and a manufacturing method of a steel pipe pile which can appropriately connect vertically arranged steel pipe piles through a sleeve.SOLUTION: A first cylindrical joint part 30 is provided on a lower side steel pipe pile 10, and a second cylindrical joint part 40 is provided on an upper side steel pipe pile 20. The first joint part 30 extends toward the side of the second joint part 40 in an axial direction from the radial outside out of the upper end of the lower side steel pipe pile 10. The second joint part 40 is provided in the radial outside of the upper side steel pipe pile 20. A first projection 32 is formed at the end of the first joint part 30, and a second recess 43 is formed at the end of the second joint part 40. In a state where the first projection 32 is fit into the second recess 43, the lower side steel pipe pile 10 and the upper side steel pipe pile 20 are separated from one another, and the lower side steel pipe pile 10 and the upper side steel pipe pile 20 become concentric. A sleeve 50 is fit into each of the through holes 34 and 44 formed in each of the joint parts 30 and 40.SELECTED DRAWING: Figure 3
【課題】上下に配置された鋼管杭を、スリーブを介して適正に連結できる鋼管杭の連結構造及び製造方法を提供する。【解決手段】下側鋼管杭10には円筒状の第1継手部30が設けられ、上側鋼管杭20には円筒状の第2継手部40が設けられている。第1継手部30は、下側鋼管杭10の上端部のうち径方向外側の部分から、軸方向において第2継手部40側に向かって延びている。第2継手部40は、上側鋼管杭20の径方向外側の部分に設けられている。第1継手部30の端部には第1凸部32が形成されており、第2継手部40の端部には第2凹部43が形成されている。第1凸部32が第2凹部43に嵌め合わされた状態において、下側鋼管杭10と上側鋼管杭20とが離間し、かつ、下側鋼管杭10と上側鋼管杭20とが同心になっている。各継手部30,40に形成された各貫通孔34,44には、スリーブ50が嵌め合わされている。【選択図】 図3
CONNECTION STRUCTURE OF STEEL PIPE PILE, AND METHOD FOR MANUFACTURING STEEL PIPE PILE
To provide a connection structure and a manufacturing method of a steel pipe pile which can appropriately connect vertically arranged steel pipe piles through a sleeve.SOLUTION: A first cylindrical joint part 30 is provided on a lower side steel pipe pile 10, and a second cylindrical joint part 40 is provided on an upper side steel pipe pile 20. The first joint part 30 extends toward the side of the second joint part 40 in an axial direction from the radial outside out of the upper end of the lower side steel pipe pile 10. The second joint part 40 is provided in the radial outside of the upper side steel pipe pile 20. A first projection 32 is formed at the end of the first joint part 30, and a second recess 43 is formed at the end of the second joint part 40. In a state where the first projection 32 is fit into the second recess 43, the lower side steel pipe pile 10 and the upper side steel pipe pile 20 are separated from one another, and the lower side steel pipe pile 10 and the upper side steel pipe pile 20 become concentric. A sleeve 50 is fit into each of the through holes 34 and 44 formed in each of the joint parts 30 and 40.SELECTED DRAWING: Figure 3
【課題】上下に配置された鋼管杭を、スリーブを介して適正に連結できる鋼管杭の連結構造及び製造方法を提供する。【解決手段】下側鋼管杭10には円筒状の第1継手部30が設けられ、上側鋼管杭20には円筒状の第2継手部40が設けられている。第1継手部30は、下側鋼管杭10の上端部のうち径方向外側の部分から、軸方向において第2継手部40側に向かって延びている。第2継手部40は、上側鋼管杭20の径方向外側の部分に設けられている。第1継手部30の端部には第1凸部32が形成されており、第2継手部40の端部には第2凹部43が形成されている。第1凸部32が第2凹部43に嵌め合わされた状態において、下側鋼管杭10と上側鋼管杭20とが離間し、かつ、下側鋼管杭10と上側鋼管杭20とが同心になっている。各継手部30,40に形成された各貫通孔34,44には、スリーブ50が嵌め合わされている。【選択図】 図3
CONNECTION STRUCTURE OF STEEL PIPE PILE, AND METHOD FOR MANUFACTURING STEEL PIPE PILE
鋼管杭の連結構造、鋼管杭の製造方法
NAKAYAMA HOICHI (Autor:in) / IMAEDA MASAYOSHI (Autor:in) / HIRANO KENICHI (Autor:in)
01.12.2022
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE CONNECTION METHOD
Europäisches Patentamt | 2022
|STEEL PIPE PILE CONNECTION STRUCTURE, STEEL PIPE PILE BASE, AND CONNECTION METHOD OF STEEL PIPE PILE
Europäisches Patentamt | 2023
|JOINT STRUCTURE OF STEEL PIPE PILE AND CONNECTION STEEL PIPE PILE
Europäisches Patentamt | 2017
|