Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
POSITION CONFIRMATION JIG, FOUNDATION CONSTRUCTION JIG AND FOUNDATION CONSTRUCTION METHOD
To provide a position confirmation jig with which center position of a column may be easily confirmed upon constructing a foundation of a building.SOLUTION: A position confirmation jig 30 is a jig which is attached to an upper part of an anchor suspension jig 20 for burying a plurality of anchor bolts F2 in a foundation concrete while a part thereof protrudes therefrom, and that is used for confirmation of center position of a column supported by the plurality of anchor bolts F2. The position confirmation jig 30 has a first extending part 31 that passes through a section to be the center position of the column and extends so as to connect a first anchor bolt F2A and a second anchor bolt F2B among the plurality of anchor bolts in top view, and a second extending part 32 that is connected to the first extending part 31 at a section to be the center position of the column, extends in a direction intersecting the extending direction of the first extending part 31, and extends so as to connect the first extending part 31 and a third anchor bolt F2C in a top view.SELECTED DRAWING: Figure 2
【課題】建物の基礎を施工するにあたって、柱の芯位置を容易に確認することが可能な位置確認治具を提供する。【解決手段】位置確認治具30は、基礎コンクリートに複数のアンカーボルトF2を突出させた状態で埋設するためのアンカー吊り下げ治具20の上部に取り付けられ、複数のアンカーボルトF2によって支持される柱の芯位置を確認するための治具である。位置確認治具30は、柱の芯位置となる部分を通過し、上面視において複数のアンカーボルトのうち、第1アンカーボルトF2A及び第2アンカーボルトF2Bを連結するように延びている第1延出部31と、柱の芯位置となる部分において第1延出部31と連結され、第1延出部31の延出方向とは交差する方向に延出し、上面視において第1延出部31及び第3アンカーボルトF2Cを連結するように延びている第2延出部32と、を備えている。【選択図】図2
POSITION CONFIRMATION JIG, FOUNDATION CONSTRUCTION JIG AND FOUNDATION CONSTRUCTION METHOD
To provide a position confirmation jig with which center position of a column may be easily confirmed upon constructing a foundation of a building.SOLUTION: A position confirmation jig 30 is a jig which is attached to an upper part of an anchor suspension jig 20 for burying a plurality of anchor bolts F2 in a foundation concrete while a part thereof protrudes therefrom, and that is used for confirmation of center position of a column supported by the plurality of anchor bolts F2. The position confirmation jig 30 has a first extending part 31 that passes through a section to be the center position of the column and extends so as to connect a first anchor bolt F2A and a second anchor bolt F2B among the plurality of anchor bolts in top view, and a second extending part 32 that is connected to the first extending part 31 at a section to be the center position of the column, extends in a direction intersecting the extending direction of the first extending part 31, and extends so as to connect the first extending part 31 and a third anchor bolt F2C in a top view.SELECTED DRAWING: Figure 2
【課題】建物の基礎を施工するにあたって、柱の芯位置を容易に確認することが可能な位置確認治具を提供する。【解決手段】位置確認治具30は、基礎コンクリートに複数のアンカーボルトF2を突出させた状態で埋設するためのアンカー吊り下げ治具20の上部に取り付けられ、複数のアンカーボルトF2によって支持される柱の芯位置を確認するための治具である。位置確認治具30は、柱の芯位置となる部分を通過し、上面視において複数のアンカーボルトのうち、第1アンカーボルトF2A及び第2アンカーボルトF2Bを連結するように延びている第1延出部31と、柱の芯位置となる部分において第1延出部31と連結され、第1延出部31の延出方向とは交差する方向に延出し、上面視において第1延出部31及び第3アンカーボルトF2Cを連結するように延びている第2延出部32と、を備えている。【選択図】図2
POSITION CONFIRMATION JIG, FOUNDATION CONSTRUCTION JIG AND FOUNDATION CONSTRUCTION METHOD
位置確認治具、基礎施工治具及び基礎施工方法
SHIMABUKURO TAKAHIRO (Autor:in) / MIYAZAWA NATSUKI (Autor:in) / OMOTE TOSHIHISA (Autor:in) / KISHIDA HISASHI (Autor:in) / KAWAKAMI HIROSHI (Autor:in) / MINAMINO TAKAHIRO (Autor:in) / ZHU HUAJIA (Autor:in) / SUZUKI KINYA (Autor:in) / KAMATA KENICHI (Autor:in)
18.01.2023
Patent
Elektronische Ressource
Japanisch
FOUNDATION CONSTRUCTION METHOD AND FOUNDATION CONSTRUCTION SYSTEM
Europäisches Patentamt | 2016
|FOUNDATION CONSTRUCTION METHOD AND FOUNDATION CONSTRUCTION SYSTEM
Europäisches Patentamt | 2015
|Single-foundation construction elevator foundation and construction method
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2015
|