Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
To provide a reinforcement material capable of improving workability during installation and removal.SOLUTION: A reinforcement material 10 connects a pile 20 to be driven into the ground by a pile hammer 150 and an above-ground part 30. The reinforcement material 10 includes a bottom part 12, a support part 11, and a side part 13. The bottom part 12 is connected to the top of the pile 20. The support part 11 is connected to the above-ground part 30 to support the above-ground part 30. The side part 13 connects the bottom part 12 and the support part 11 and is mounted vertically on the bottom part 12 and the support part 11. The area of the bottom part 12 is larger than the top of the pile 20. At the top of the pile 20, multiple pile joints 221 are provided for the pile hammer 150 to grip. The bottom part 12 has mounting holes 121 at positions corresponding to the multiple pile joints 221.SELECTED DRAWING: Figure 5
【課題】設置及び撤去の際の作業性を向上させる。【解決手段】補強材10は、杭打機150によって地中に打ち込まれる杭20と地上部30とを接続する。補強材10は、底部12と、支持部11と、側部13とを備える。底部12は、杭20の頭頂部に接続される。支持部11は、地上部30に接続され、地上部30を支持する。側部13は、底部12と支持部11とを接続し、底部12及び支持部11に垂直に設けられる。底部12の面積は、杭20の頭頂部の面積より大きい。杭20の頭頂部には、杭打機150が掴むための複数の杭接続部221が設けられる。底部12は、杭接続部221に対応する位置に取付孔121を有する。【選択図】図5
To provide a reinforcement material capable of improving workability during installation and removal.SOLUTION: A reinforcement material 10 connects a pile 20 to be driven into the ground by a pile hammer 150 and an above-ground part 30. The reinforcement material 10 includes a bottom part 12, a support part 11, and a side part 13. The bottom part 12 is connected to the top of the pile 20. The support part 11 is connected to the above-ground part 30 to support the above-ground part 30. The side part 13 connects the bottom part 12 and the support part 11 and is mounted vertically on the bottom part 12 and the support part 11. The area of the bottom part 12 is larger than the top of the pile 20. At the top of the pile 20, multiple pile joints 221 are provided for the pile hammer 150 to grip. The bottom part 12 has mounting holes 121 at positions corresponding to the multiple pile joints 221.SELECTED DRAWING: Figure 5
【課題】設置及び撤去の際の作業性を向上させる。【解決手段】補強材10は、杭打機150によって地中に打ち込まれる杭20と地上部30とを接続する。補強材10は、底部12と、支持部11と、側部13とを備える。底部12は、杭20の頭頂部に接続される。支持部11は、地上部30に接続され、地上部30を支持する。側部13は、底部12と支持部11とを接続し、底部12及び支持部11に垂直に設けられる。底部12の面積は、杭20の頭頂部の面積より大きい。杭20の頭頂部には、杭打機150が掴むための複数の杭接続部221が設けられる。底部12は、杭接続部221に対応する位置に取付孔121を有する。【選択図】図5
REINFORCEMENT MATERIAL
補強材
TABATA TOSHIYUKI (Autor:in)
02.02.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Europäisches Patentamt | 2020
|REINFORCEMENT MATERIAL AND GROUND REINFORCEMENT METHOD
Europäisches Patentamt | 2024
|