Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PRECAST CONCRETE FLOOR SLAB AND CONSTRUCTION METHOD FOR THE SAME
To provide a precast concrete floor slab and construction method for the same having improved on-site workability.SOLUTION: A precast concrete floor slab comprises: a body 1; and an engagement part 2 provided on the opposing peripheral surface of the body 1. The engagement part 2 is either an upper engagement part 21 or a lower engagement part 22. On the opposing peripheral surface of the body 1, when one of the engagement parts 2 is the upper engagement part 21, the other of the engagement parts 2 is the lower engagement part 22. A bolt box 3 having a bolt hole 31 on the inner side surface is installed on the upper surface of the upper engagement part 21, and an anchor nut 42 corresponding to the bolt hole 31 is provided on an inclined surface of the lower engagement part 22 with the inclination angle of the inclined surface being 45°. The bolt hole 31 and the anchor nut 42 are orthogonal to the inclined surface.SELECTED DRAWING: Figure 1
【課題】現場での作業性を向上したプレキャストコンクリート床版及びその施工方法を提供する。【解決手段】本体1と、前記本体1の対向する周面に設けた係合部2を有し、前記係合部2は上係合部21と下係合部22のいずれかであり、前記本体1の対向する前記周面において、一方の前記係合部2が前記上係合部21のとき、他方の前記係合部2が前記下係合部22により構成し、前記上係合部21の上面に、内側面にボルト孔31を有するボルトボックス3を設け、前記下係合部22の傾斜面に、前記ボルト孔31に対応するアンカーナット42を設け、前記傾斜面の傾斜角は45°であり、前記ボルト孔31及び前記アンカーナット42は、前記傾斜面に対して直交することを特徴とする、プレキャストコンクリート床版。【選択図】図1
PRECAST CONCRETE FLOOR SLAB AND CONSTRUCTION METHOD FOR THE SAME
To provide a precast concrete floor slab and construction method for the same having improved on-site workability.SOLUTION: A precast concrete floor slab comprises: a body 1; and an engagement part 2 provided on the opposing peripheral surface of the body 1. The engagement part 2 is either an upper engagement part 21 or a lower engagement part 22. On the opposing peripheral surface of the body 1, when one of the engagement parts 2 is the upper engagement part 21, the other of the engagement parts 2 is the lower engagement part 22. A bolt box 3 having a bolt hole 31 on the inner side surface is installed on the upper surface of the upper engagement part 21, and an anchor nut 42 corresponding to the bolt hole 31 is provided on an inclined surface of the lower engagement part 22 with the inclination angle of the inclined surface being 45°. The bolt hole 31 and the anchor nut 42 are orthogonal to the inclined surface.SELECTED DRAWING: Figure 1
【課題】現場での作業性を向上したプレキャストコンクリート床版及びその施工方法を提供する。【解決手段】本体1と、前記本体1の対向する周面に設けた係合部2を有し、前記係合部2は上係合部21と下係合部22のいずれかであり、前記本体1の対向する前記周面において、一方の前記係合部2が前記上係合部21のとき、他方の前記係合部2が前記下係合部22により構成し、前記上係合部21の上面に、内側面にボルト孔31を有するボルトボックス3を設け、前記下係合部22の傾斜面に、前記ボルト孔31に対応するアンカーナット42を設け、前記傾斜面の傾斜角は45°であり、前記ボルト孔31及び前記アンカーナット42は、前記傾斜面に対して直交することを特徴とする、プレキャストコンクリート床版。【選択図】図1
PRECAST CONCRETE FLOOR SLAB AND CONSTRUCTION METHOD FOR THE SAME
プレキャストコンクリート床版及びその施工方法
KUROIWA TOSHIYUKI (Autor:in) / KASAKURA RYOTA (Autor:in)
01.03.2023
Patent
Elektronische Ressource
Japanisch
METHOD FOR PRODUCING PRECAST CONCRETE FLOOR SLAB AND PRECAST CONCRETE FLOOR SLAB
Europäisches Patentamt | 2017
|PRECAST CONCRETE FLOOR SLAB AND CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2022
|PRECAST FLOOR SLAB INSTALLATION METHOD AND PRECAST FLOOR SLAB
Europäisches Patentamt | 2018
|