BASE ISOLATION BUILDING
To provide a base isolation building 1 that can prevent flooding into a base isolation pit 30 even if flooding depth exceeds height of a retaining wall 23.SOLUTION: The base isolation building 1 of this invention is equipped with a foundation structure 20, a base isolation mechanism 22, and a superstructure 10. The foundation structure 20 includes the retaining wall 23. The superstructure 10 includes a first wall portion 16, a second wall portion 18 housed inside the first wall portion 16, and an opening portion 11 that opens at a position higher than the top of the first wall portion 16. The retaining wall 23 surrounds the base isolation pit 30 and a top edge 23a is higher than a bottom edge 16a of the first wall portion 16. A first channel 16c of the first wall portion 16 forms at least a part of a waterproof wall 180 that prevents water from flowing from outside into the opening portion 11 of the superstructure 10 as the second wall portion 18 is pushed up by water flowing into the first channel 16c from outside.SELECTED DRAWING: Figure 4
【課題】本発明は、浸水深さが擁壁23の高さを超えても、免震ピット30への浸水を防ぐことができる免震建物1を提供する。【解決手段】本発明に係る免震建物1は、基礎構造20と、免震機構22と、上部構造10と、を備える。基礎構造20は擁壁23を備える。上部構造10は、第1壁部16と、第1壁部16の内部に収容された第2壁部18と、第1壁部16の上端より高い位置で開口する開口部11と、を備える。擁壁23は、免震ピット30の周囲を囲み、かつ、上端23aが第1壁部16の下端16aより高い位置にある。第1壁部16の第1流路16cは、第1流路16cに外部から流入した水により押し上げられた第2壁部18が、上部構造10の開口部11へ外部から水が流入することを防止する防水壁180の少なくとも一部を形成する。【選択図】図4
BASE ISOLATION BUILDING
To provide a base isolation building 1 that can prevent flooding into a base isolation pit 30 even if flooding depth exceeds height of a retaining wall 23.SOLUTION: The base isolation building 1 of this invention is equipped with a foundation structure 20, a base isolation mechanism 22, and a superstructure 10. The foundation structure 20 includes the retaining wall 23. The superstructure 10 includes a first wall portion 16, a second wall portion 18 housed inside the first wall portion 16, and an opening portion 11 that opens at a position higher than the top of the first wall portion 16. The retaining wall 23 surrounds the base isolation pit 30 and a top edge 23a is higher than a bottom edge 16a of the first wall portion 16. A first channel 16c of the first wall portion 16 forms at least a part of a waterproof wall 180 that prevents water from flowing from outside into the opening portion 11 of the superstructure 10 as the second wall portion 18 is pushed up by water flowing into the first channel 16c from outside.SELECTED DRAWING: Figure 4
【課題】本発明は、浸水深さが擁壁23の高さを超えても、免震ピット30への浸水を防ぐことができる免震建物1を提供する。【解決手段】本発明に係る免震建物1は、基礎構造20と、免震機構22と、上部構造10と、を備える。基礎構造20は擁壁23を備える。上部構造10は、第1壁部16と、第1壁部16の内部に収容された第2壁部18と、第1壁部16の上端より高い位置で開口する開口部11と、を備える。擁壁23は、免震ピット30の周囲を囲み、かつ、上端23aが第1壁部16の下端16aより高い位置にある。第1壁部16の第1流路16cは、第1流路16cに外部から流入した水により押し上げられた第2壁部18が、上部構造10の開口部11へ外部から水が流入することを防止する防水壁180の少なくとも一部を形成する。【選択図】図4
BASE ISOLATION BUILDING
免震建物
TOYOSHIMA AKIHIKO (Autor:in) / INAI SHINSUKE (Autor:in) / NAKAMURA TAKUMI (Autor:in) / ISHIDA TAKUSHI (Autor:in) / KAKINUMA TAKAHIRO (Autor:in) / YOSHIE KAZUMA (Autor:in) / WATANABE TAKAHIRO (Autor:in) / TOKUNAGA MITSUAKI (Autor:in) / ITO YUJIRO (Autor:in) / KATO NAOKI (Autor:in)
08.03.2023