DECOMMISSIONING METHOD
To provide a decommissioning method of a nuclear reactor allowing radiation to be securely shielded for a long period as preventing impact of severe environmental change, and being advantageous in reduction of load for monitoring work and maintenance work.SOLUTION: A caisson skeleton 10 is constructed to be integrally connected to a nuclear reactor building 22 to accommodate the nuclear reactor building 22. Excavating the ground below the caisson skeleton 10 with a caisson shovel 20 makes the caisson skeleton 10 sink with weight of the caisson skeleton 10 integrally connected to the nuclear reactor building 22. Upon completion of sinking the caisson skeleton 10, concrete C is filled within a space 28 under the caisson skeleton 10 and inside the caisson skeleton 10 to bury the nuclear reactor building 22 with the caisson skeleton in the ground to finish the decommissioning work.SELECTED DRAWING: Figure 9
【課題】過酷な環境の変化の影響を回避しつつ長期間にわたって放射線を確実に遮蔽でき、監視作業およびメンテナンス作業の負担の軽減化を図る上で有利な原子炉の廃炉方法を提供する。【解決手段】原子炉建屋22と一体に結合され原子炉建屋22を収容するケーソン躯体10を構築する。ケーソンショベル20でケーソン躯体10の下方の地盤を掘削していくことにより、原子炉建屋22と一体に結合されたケーソン躯体10の重量によりケーソン躯体10を沈下させていく。ケーソン躯体10を沈下させたならば、ケーソン躯体10の下方の空間28と、ケーソン躯体10の内部にコンクリートCを充填し、原子炉建屋22をケーソン躯体と共に地中に埋設して廃炉作業を終了する。【選択図】図9
DECOMMISSIONING METHOD
To provide a decommissioning method of a nuclear reactor allowing radiation to be securely shielded for a long period as preventing impact of severe environmental change, and being advantageous in reduction of load for monitoring work and maintenance work.SOLUTION: A caisson skeleton 10 is constructed to be integrally connected to a nuclear reactor building 22 to accommodate the nuclear reactor building 22. Excavating the ground below the caisson skeleton 10 with a caisson shovel 20 makes the caisson skeleton 10 sink with weight of the caisson skeleton 10 integrally connected to the nuclear reactor building 22. Upon completion of sinking the caisson skeleton 10, concrete C is filled within a space 28 under the caisson skeleton 10 and inside the caisson skeleton 10 to bury the nuclear reactor building 22 with the caisson skeleton in the ground to finish the decommissioning work.SELECTED DRAWING: Figure 9
【課題】過酷な環境の変化の影響を回避しつつ長期間にわたって放射線を確実に遮蔽でき、監視作業およびメンテナンス作業の負担の軽減化を図る上で有利な原子炉の廃炉方法を提供する。【解決手段】原子炉建屋22と一体に結合され原子炉建屋22を収容するケーソン躯体10を構築する。ケーソンショベル20でケーソン躯体10の下方の地盤を掘削していくことにより、原子炉建屋22と一体に結合されたケーソン躯体10の重量によりケーソン躯体10を沈下させていく。ケーソン躯体10を沈下させたならば、ケーソン躯体10の下方の空間28と、ケーソン躯体10の内部にコンクリートCを充填し、原子炉建屋22をケーソン躯体と共に地中に埋設して廃炉作業を終了する。【選択図】図9
DECOMMISSIONING METHOD
原子炉の廃炉方法
OKANO RIKIZO (Autor:in) / SHIBUYA MITSUO (Autor:in)
03.04.2023
Patent
Elektronische Ressource
Japanisch