Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
POLE AND INSTALLATION METHOD OF POLE BODY
To provide a pole which can be constructed easily and can be in a stable installation state, and to provide an installation method of a pole body.SOLUTION: In an installation method of a pole body 2 having a base part 4, in a hole H for foundation burying, a foundation holding member 12 having an engaging hole 12a is installed, and in the engaging hole 12a of the foundation holding member 12, a cylindrical side surface formation member 6 is engaged, and a space of the hole H for foundation burying other than the side surface formation member 6 is backfilled. In the side surface formation member 6, a cylindrical body 10 for drainage is placed with concrete 7 for foundation, and in the concrete 7 for foundation, an anchor bolt 8 is buried in a state of protruding upward. In the cylindrical body 10 for drainage, a water passing member 11 for passing water is filled, and after elapse of a predetermined time, a foundation block 5 for installing the pole body 2 is formed through solidification of the concrete 7 for foundation. After that, the base part 4 of the pole body 2 is fixed to the anchor bolt 8, and these are covered by a lid material 15.SELECTED DRAWING: Figure 1
【課題】 容易に施工可能で、且つ安定した設置状態とすることができるポール及びポール本体の設置方法を提供する。【解決手段】 ベース部4を有するポール本体2の設置方法であって、基礎埋設用穴Hに、係合孔12aを有する基礎保持部材12を設置し、基礎保持部材12の係合孔12aに、筒状の側面形成部材6を係合させて、側面形成部材6以外の基礎埋設用穴Hの空間を埋め戻し、側面形成部材6の中に、排水用筒体10と基礎用コンクリート7とを入れるとともに、基礎用コンクリート7にアンカーボルト8を上方に突出させた状態で埋め込み、排水用筒体10の中に水を通す通水部材11を充填し、所定時間経過後に、基礎用コンクリート7が固まることで、ポール本体2の設置のための基礎ブロック5が形成された後に、アンカーボルト8にポール本体2のベース部4を固定し、これらを蓋材15で覆うものである。【選択図】図1
POLE AND INSTALLATION METHOD OF POLE BODY
To provide a pole which can be constructed easily and can be in a stable installation state, and to provide an installation method of a pole body.SOLUTION: In an installation method of a pole body 2 having a base part 4, in a hole H for foundation burying, a foundation holding member 12 having an engaging hole 12a is installed, and in the engaging hole 12a of the foundation holding member 12, a cylindrical side surface formation member 6 is engaged, and a space of the hole H for foundation burying other than the side surface formation member 6 is backfilled. In the side surface formation member 6, a cylindrical body 10 for drainage is placed with concrete 7 for foundation, and in the concrete 7 for foundation, an anchor bolt 8 is buried in a state of protruding upward. In the cylindrical body 10 for drainage, a water passing member 11 for passing water is filled, and after elapse of a predetermined time, a foundation block 5 for installing the pole body 2 is formed through solidification of the concrete 7 for foundation. After that, the base part 4 of the pole body 2 is fixed to the anchor bolt 8, and these are covered by a lid material 15.SELECTED DRAWING: Figure 1
【課題】 容易に施工可能で、且つ安定した設置状態とすることができるポール及びポール本体の設置方法を提供する。【解決手段】 ベース部4を有するポール本体2の設置方法であって、基礎埋設用穴Hに、係合孔12aを有する基礎保持部材12を設置し、基礎保持部材12の係合孔12aに、筒状の側面形成部材6を係合させて、側面形成部材6以外の基礎埋設用穴Hの空間を埋め戻し、側面形成部材6の中に、排水用筒体10と基礎用コンクリート7とを入れるとともに、基礎用コンクリート7にアンカーボルト8を上方に突出させた状態で埋め込み、排水用筒体10の中に水を通す通水部材11を充填し、所定時間経過後に、基礎用コンクリート7が固まることで、ポール本体2の設置のための基礎ブロック5が形成された後に、アンカーボルト8にポール本体2のベース部4を固定し、これらを蓋材15で覆うものである。【選択図】図1
POLE AND INSTALLATION METHOD OF POLE BODY
ポール及びポール本体の設置方法
YAMANE MITSUHIRO (Autor:in)
07.04.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
WOODEN POLE INSTALLATION STRUCTURE AND WOODEN POLE INSTALLATION METHOD
Europäisches Patentamt | 2023
|Pole erecting device and pole erecting installation method
Europäisches Patentamt | 2024
|Earth auger and pole machine, and pole installation method
Europäisches Patentamt | 2017
|