BEAM CONNECTION STRUCTURE AND STEEL FRAME BUILDING
To achieve improved productivity, workability, and logistics loading effect by using an automatic welding line in a factory to weld each plate and improve the efficiency of transporting H-shaped steel to the site.SOLUTION: A first gusset plate 5 is provided between upper and lower flanges 2 and 3 of a first beam (big beam) 1 so as not to protrude from the side edge of the flange. A second gusset plate 15 is provided on a web 14 of a second beam (small beam) 10 so as to protrude toward the first gusset plate 5 side. The first gusset plate 5 and the second gusset plate 15 are joined with a fastening material 17 between the upper and lower flanges 2 and 3 of the first beam (big beam) 1.SELECTED DRAWING: Figure 3
【課題】工場内で自動溶接ラインを利用して各プレートを溶接し、H形鋼の現場までの搬送効率を向上し、生産性・施工性・物流積載効果を図る。【解決手段】第一梁(大梁)1の上下フランジ2、3の間にフランジ側縁から突出させない状態で第一ガセットプレート5が設けられ、第二梁(小梁)10のウェブ14に第一ガセットプレート5の側に突出させて第二ガセットプレート15が設けられ、第一ガセットプレート5と第二ガセットプレート15とが第一梁(大梁)1の上下フランジ2、3の間で締結材17により接合される。【選択図】図3
BEAM CONNECTION STRUCTURE AND STEEL FRAME BUILDING
To achieve improved productivity, workability, and logistics loading effect by using an automatic welding line in a factory to weld each plate and improve the efficiency of transporting H-shaped steel to the site.SOLUTION: A first gusset plate 5 is provided between upper and lower flanges 2 and 3 of a first beam (big beam) 1 so as not to protrude from the side edge of the flange. A second gusset plate 15 is provided on a web 14 of a second beam (small beam) 10 so as to protrude toward the first gusset plate 5 side. The first gusset plate 5 and the second gusset plate 15 are joined with a fastening material 17 between the upper and lower flanges 2 and 3 of the first beam (big beam) 1.SELECTED DRAWING: Figure 3
【課題】工場内で自動溶接ラインを利用して各プレートを溶接し、H形鋼の現場までの搬送効率を向上し、生産性・施工性・物流積載効果を図る。【解決手段】第一梁(大梁)1の上下フランジ2、3の間にフランジ側縁から突出させない状態で第一ガセットプレート5が設けられ、第二梁(小梁)10のウェブ14に第一ガセットプレート5の側に突出させて第二ガセットプレート15が設けられ、第一ガセットプレート5と第二ガセットプレート15とが第一梁(大梁)1の上下フランジ2、3の間で締結材17により接合される。【選択図】図3
BEAM CONNECTION STRUCTURE AND STEEL FRAME BUILDING
梁接合構造及び鉄骨造建物
NAKATANI YUKIHIKO (Autor:in) / OKAZAKI HIRONORI (Autor:in)
11.04.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
Energy-consuming frame joint for steel structure beam-column connection