Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SOUND INSULATION PANEL REMOVING METHOD OF SOUND INSULATION WALL
To provide the sound insulation panel removing method of a sound insulation wall allowing easy removal of the sound insulation panel.SOLUTION: In the sound insulation panel removing method of a sound insulation wall, a sound insulation panel 10 is raised up to form a space 40, a space block 50 is inserted in the space, the tip end of a temporary wire rope 30 is connected to the rear end of a main wire 20 to be pulled out, a tip end of the main wire rope is pulled to pass the temporary wire rope through a through-hole 12, and when a joint part 32 reaches the upper part of a replacement sound insulation panel 10x, the connection is released. After replacement by raising up the sound insulation panel, the rear end of the temporary wire rope is pulled to pull back the main wire rope 20 to the through-hole. The connection of the temporary wire rope with the main wire rope is released, the rear end of the pulled back main wire rope 20a is connected again to the tip end of the main wire rope 20 released in the connection, to recover the main wire rope (20) to a sound insulation wall, and the raised sound insulation panel is returned to an original position.SELECTED DRAWING: Figure 5
【課題】遮音パネル板の交換を容易に行える遮音壁の遮音パネル板交換工法を提供する。【解決手段】遮音パネル板10を持ち上げて隙間40を形成するとともに隙間にスペースブロック50を嵌挿して、引き抜こうとする本ワイヤーロープ20の後端に仮ワイヤーロープ30の先端を連結し、本ワイヤーロープの先端を引っ張り挿通孔12に仮ワイヤーロープを通し、ジョイント部32が交換遮音パネル板10xの上方に達した時点で連結を解除する。遮音パネル板を持ち上げて交換したのち、仮ワイヤーロープの後端を引っ張り、挿通孔に本ワイヤーロープ20を引き戻す。仮ワイヤーロープと本ワイヤーロープとの連結を解除し、引き戻しされた本ワイヤーロープ20aの後端を、先の連結を解除した本ワイヤーロープ20bの先端と再度連結して遮音壁に本ワイヤーロープ(20)を復旧させ、持ち上げた遮音パネルを元の位置に戻す。【選択図】図5
SOUND INSULATION PANEL REMOVING METHOD OF SOUND INSULATION WALL
To provide the sound insulation panel removing method of a sound insulation wall allowing easy removal of the sound insulation panel.SOLUTION: In the sound insulation panel removing method of a sound insulation wall, a sound insulation panel 10 is raised up to form a space 40, a space block 50 is inserted in the space, the tip end of a temporary wire rope 30 is connected to the rear end of a main wire 20 to be pulled out, a tip end of the main wire rope is pulled to pass the temporary wire rope through a through-hole 12, and when a joint part 32 reaches the upper part of a replacement sound insulation panel 10x, the connection is released. After replacement by raising up the sound insulation panel, the rear end of the temporary wire rope is pulled to pull back the main wire rope 20 to the through-hole. The connection of the temporary wire rope with the main wire rope is released, the rear end of the pulled back main wire rope 20a is connected again to the tip end of the main wire rope 20 released in the connection, to recover the main wire rope (20) to a sound insulation wall, and the raised sound insulation panel is returned to an original position.SELECTED DRAWING: Figure 5
【課題】遮音パネル板の交換を容易に行える遮音壁の遮音パネル板交換工法を提供する。【解決手段】遮音パネル板10を持ち上げて隙間40を形成するとともに隙間にスペースブロック50を嵌挿して、引き抜こうとする本ワイヤーロープ20の後端に仮ワイヤーロープ30の先端を連結し、本ワイヤーロープの先端を引っ張り挿通孔12に仮ワイヤーロープを通し、ジョイント部32が交換遮音パネル板10xの上方に達した時点で連結を解除する。遮音パネル板を持ち上げて交換したのち、仮ワイヤーロープの後端を引っ張り、挿通孔に本ワイヤーロープ20を引き戻す。仮ワイヤーロープと本ワイヤーロープとの連結を解除し、引き戻しされた本ワイヤーロープ20aの後端を、先の連結を解除した本ワイヤーロープ20bの先端と再度連結して遮音壁に本ワイヤーロープ(20)を復旧させ、持ち上げた遮音パネルを元の位置に戻す。【選択図】図5
SOUND INSULATION PANEL REMOVING METHOD OF SOUND INSULATION WALL
遮音壁の遮音パネル板交換工法
KUMADA MITSUO (Autor:in)
26.05.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
SOUND INSULATION PANEL, SOUND INSULATION WALL, AND CONSTRUCTION METHOD OF SOUND INSULATION WALL
Europäisches Patentamt | 2021
|