To provide a device for reducing excess concrete removal and a method for reducing excess concrete removal, which can reduce a work of removing excess concrete when constructing a cast-in-place concrete body.SOLUTION: A device 40 for reducing excess concrete removal that reduces the removal of excess concrete CS formed at a head of a cast-in-place concrete body P when the cast-in-place concrete body P is constructed by inserting a reinforcing bar cage 50 into an excavation hole 70 created in the ground G and into which stabilizing liquid B is injected, and pouring the concrete C has a bag body 10 that can be expanded and contracted by injecting and extracting air, and a string material 19 provided directly or indirectly at least below the bag body 10 for fixing the bag body 10 to the outer periphery of the head of the reinforcing bar cage 50.SELECTED DRAWING: Figure 3
【課題】場所打ちコンクリート体の施工に際して、余盛りコンクリートの除去作業を軽減することのできる、余盛りコンクリート除去軽減装置と余盛りコンクリート除去軽減方法を提供する。【解決手段】地盤Gに造成され、安定液Bが注入されている掘削孔70に対して鉄筋籠50が挿入され、コンクリートCが打設されることにより場所打ちコンクリート体Pが施工される際に、場所打ちコンクリート体Pの頭部に形成される、余盛りコンクリートCSの除去を軽減する、余盛りコンクリート除去軽減装置40であり、エアの注入と抜き取りにより、膨縮自在である袋体10と、袋体10を鉄筋籠50の頭部の外周に固定するために、袋体10の少なくとも下方において直接的もしくは間接的に設けられている、紐材19とを有する。【選択図】図3
DEVICE FOR REDUCING EXCESS CONCRETE REMOVAL AND METHOD FOR REDUCING EXCESS CONCRETE REMOVAL
To provide a device for reducing excess concrete removal and a method for reducing excess concrete removal, which can reduce a work of removing excess concrete when constructing a cast-in-place concrete body.SOLUTION: A device 40 for reducing excess concrete removal that reduces the removal of excess concrete CS formed at a head of a cast-in-place concrete body P when the cast-in-place concrete body P is constructed by inserting a reinforcing bar cage 50 into an excavation hole 70 created in the ground G and into which stabilizing liquid B is injected, and pouring the concrete C has a bag body 10 that can be expanded and contracted by injecting and extracting air, and a string material 19 provided directly or indirectly at least below the bag body 10 for fixing the bag body 10 to the outer periphery of the head of the reinforcing bar cage 50.SELECTED DRAWING: Figure 3
【課題】場所打ちコンクリート体の施工に際して、余盛りコンクリートの除去作業を軽減することのできる、余盛りコンクリート除去軽減装置と余盛りコンクリート除去軽減方法を提供する。【解決手段】地盤Gに造成され、安定液Bが注入されている掘削孔70に対して鉄筋籠50が挿入され、コンクリートCが打設されることにより場所打ちコンクリート体Pが施工される際に、場所打ちコンクリート体Pの頭部に形成される、余盛りコンクリートCSの除去を軽減する、余盛りコンクリート除去軽減装置40であり、エアの注入と抜き取りにより、膨縮自在である袋体10と、袋体10を鉄筋籠50の頭部の外周に固定するために、袋体10の少なくとも下方において直接的もしくは間接的に設けられている、紐材19とを有する。【選択図】図3
DEVICE FOR REDUCING EXCESS CONCRETE REMOVAL AND METHOD FOR REDUCING EXCESS CONCRETE REMOVAL
余盛りコンクリート除去軽減装置と余盛りコンクリート除去軽減方法
WATANABE MASAYOSHI (Autor:in)
29.08.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Effect of excess water on concrete
Engineering Index Backfile | 1923
Green carbon-reducing concrete admixture, green carbon-reducing concrete and preparation method
Europäisches Patentamt | 2022
|Hime & Erlin on Concrete - Excess Leads to Standardization
Online Contents | 2009