Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
To provide a dividing line construction method that can minimize wear of a paint of a dividing line due to travel of vehicles and can reduce the loads of the vehicles imposed on the dividing line.SOLUTION: A dividing line construction method for constructing a dividing line on a paved road comprises: a step S1 of excavating the paved road to form a groove; a step S7 of providing a plurality of reinforcements in the groove and adjusting a height of tops of the plurality of reinforcements so that the tops of the plurality of reinforcements and the paved road surface, which is the surface of the paved road, are at the same height; a step S4 of pouring a paint into the groove following the step S7; and a step S5 of adjusting the height of the surface of the paint so that the surface of the paint poured in the step S4 and the paved road surface are at the same height.SELECTED DRAWING: Figure 8
【課題】車両の走行による区画線の塗料の摩耗を最小限に抑えることができ、かつ、区画線が受ける車両の荷重を低減可能な区画線の施工方法を提供する。【解決手段】区画線を舗装路に施工する区画線の施工方法において、舗装路を掘削して溝を形成するステップS1と、溝に複数の補強部を設け、かつ、複数の補強部の上端と、舗装路の表面である舗装路面とが同じ高さとなるように、複数の補強部の上端の高さを調整するステップS7と、ステップS7に次いで行われ、かつ、溝に塗料を流し込むステップS4と、ステップS4で流し込まれた塗料の表面と、舗装路面とが同じ高さとなるように、塗料の表面の高さを調整するステップS5と、を実行する、区画線の施工方法である。【選択図】図8
To provide a dividing line construction method that can minimize wear of a paint of a dividing line due to travel of vehicles and can reduce the loads of the vehicles imposed on the dividing line.SOLUTION: A dividing line construction method for constructing a dividing line on a paved road comprises: a step S1 of excavating the paved road to form a groove; a step S7 of providing a plurality of reinforcements in the groove and adjusting a height of tops of the plurality of reinforcements so that the tops of the plurality of reinforcements and the paved road surface, which is the surface of the paved road, are at the same height; a step S4 of pouring a paint into the groove following the step S7; and a step S5 of adjusting the height of the surface of the paint so that the surface of the paint poured in the step S4 and the paved road surface are at the same height.SELECTED DRAWING: Figure 8
【課題】車両の走行による区画線の塗料の摩耗を最小限に抑えることができ、かつ、区画線が受ける車両の荷重を低減可能な区画線の施工方法を提供する。【解決手段】区画線を舗装路に施工する区画線の施工方法において、舗装路を掘削して溝を形成するステップS1と、溝に複数の補強部を設け、かつ、複数の補強部の上端と、舗装路の表面である舗装路面とが同じ高さとなるように、複数の補強部の上端の高さを調整するステップS7と、ステップS7に次いで行われ、かつ、溝に塗料を流し込むステップS4と、ステップS4で流し込まれた塗料の表面と、舗装路面とが同じ高さとなるように、塗料の表面の高さを調整するステップS5と、を実行する、区画線の施工方法である。【選択図】図8
DIVIDING LINE CONSTRUCTION METHOD
区画線の施工方法
NAKAJIMA YOSHIE (Autor:in)
01.09.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E01C
Bau von Straßen, Sportplätzen oder dgl., Decken dafür
,
CONSTRUCTION OF, OR SURFACES FOR, ROADS, SPORTS GROUNDS, OR THE LIKE
/
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Construction method for arranging dividing joint of roof
Europäisches Patentamt | 2020
|Functional terrace dividing strip and construction method thereof
Europäisches Patentamt | 2020
|Finished trapezoidal roof dividing strip and construction method
Europäisches Patentamt | 2023
|Manufacturing and construction method of finished product dividing strip
Europäisches Patentamt | 2024
|