Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
GUARDRAIL POST REPAIR METHOD AND REPAIR MEMBER
To provide a guardrail post repair method and a repair member to make effective use of existing posts and reduce work load.SOLUTION: A repair method of a guardrail post 10 whose lower part is buried in the ground and whose upper part is penetrated by a horizontal bolt includes a first insertion step in which, inside the guardrail post 10, a bolt is inserted through a reinforcing pipe 20, which has a vertical slit formed from the lower end upward and a horizontal slit formed to communicate with an intermediate part of the vertical slit, to reach the horizontal slit, a first rotation step of rotating the reinforcing pipe 20 in the horizontal direction so that the bolt enters the horizontal slit, a reinforcing member installation step of installing a reinforcing member 30 that fills the gap between the vertical slits, a second rotation step of rotating the reinforcing pipe 20 in the horizontal direction so that the bolt comes out of the horizontal slit and a second insertion step in which, inside the guardrail post 10, a bolt is inserted through the reinforcing pipe 20 to reach the upper end part of the vertical slit.SELECTED DRAWING: Figure 5
【課題】既設の支柱を有効利用するとともに、作業負担の小さいガードレール用支柱の補修方法及び補修部材を提供する。【解決手段】下部が地中に埋設され上部に水平方向のボルトが貫通してなるガードレール用支柱10の補修方法であって、ガードレール用支柱10の内部に、下端部から上部に向けて形成された縦スリット及び縦スリットの中間部に連通するように形成された横スリットを有する補強管20を、ボルトが横スリットに到達するまで挿入する第1挿入工程と、ボルトが横スリットに入るように、補強管20を水平方向に回転する第1回転工程と、縦スリットの隙間を埋める補強部材30を装着する補強部材装着工程と、ボルトが横スリットから出るように、補強管20を水平方向に回転する第2回転工程と、ガードレール用支柱10の内部に、補強管20を、ボルトが縦スリットの上端部に到達するまで挿入する第2挿入工程と、を含む。【選択図】図5
GUARDRAIL POST REPAIR METHOD AND REPAIR MEMBER
To provide a guardrail post repair method and a repair member to make effective use of existing posts and reduce work load.SOLUTION: A repair method of a guardrail post 10 whose lower part is buried in the ground and whose upper part is penetrated by a horizontal bolt includes a first insertion step in which, inside the guardrail post 10, a bolt is inserted through a reinforcing pipe 20, which has a vertical slit formed from the lower end upward and a horizontal slit formed to communicate with an intermediate part of the vertical slit, to reach the horizontal slit, a first rotation step of rotating the reinforcing pipe 20 in the horizontal direction so that the bolt enters the horizontal slit, a reinforcing member installation step of installing a reinforcing member 30 that fills the gap between the vertical slits, a second rotation step of rotating the reinforcing pipe 20 in the horizontal direction so that the bolt comes out of the horizontal slit and a second insertion step in which, inside the guardrail post 10, a bolt is inserted through the reinforcing pipe 20 to reach the upper end part of the vertical slit.SELECTED DRAWING: Figure 5
【課題】既設の支柱を有効利用するとともに、作業負担の小さいガードレール用支柱の補修方法及び補修部材を提供する。【解決手段】下部が地中に埋設され上部に水平方向のボルトが貫通してなるガードレール用支柱10の補修方法であって、ガードレール用支柱10の内部に、下端部から上部に向けて形成された縦スリット及び縦スリットの中間部に連通するように形成された横スリットを有する補強管20を、ボルトが横スリットに到達するまで挿入する第1挿入工程と、ボルトが横スリットに入るように、補強管20を水平方向に回転する第1回転工程と、縦スリットの隙間を埋める補強部材30を装着する補強部材装着工程と、ボルトが横スリットから出るように、補強管20を水平方向に回転する第2回転工程と、ガードレール用支柱10の内部に、補強管20を、ボルトが縦スリットの上端部に到達するまで挿入する第2挿入工程と、を含む。【選択図】図5
GUARDRAIL POST REPAIR METHOD AND REPAIR MEMBER
ガードレール用支柱の補修方法及び補修部材
KIKUSAWA TOMOMI (Autor:in) / OTA KAZUNARI (Autor:in) / MINAMITANI NAOKI (Autor:in)
06.09.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E01F
ADDITIONAL WORK, SUCH AS EQUIPPING ROADS OR THE CONSTRUCTION OF PLATFORMS, HELICOPTER LANDING STAGES, SIGNS, SNOW FENCES, OR THE LIKE
,
Zusätzliche Baumaßnahmen, wie die Ausstattung von Straßen oder die bauliche Ausbildung von Bahnsteigen, Landeplätzen für Hubschrauber, Wegweisern, Schneezäunen oder dgl.
Europäisches Patentamt | 2018
|Reinforcing member fixed gutter for reinforcing guardrail post
Europäisches Patentamt | 2018
|Multifunctional rush-repair vehicle with centralized control room guardrail
Europäisches Patentamt | 2020
|