RECONSTRUCTION METHOD OF EXISTING BUILDING AND RECONSTRUCTION BUILDING
To provide a reconstruction method of an existing building capable of reducing a work period and a construction cost in reconstructing the existing building of which ground water level is higher than a bottom surface of an existing underground skeleton.SOLUTION: A reconstruction method of an existing building is the method for reconstructing an existing building 1 of which ground water level W is higher than a bottom surface of an existing underground skeleton 11. The existing underground skeleton 11 has an existing pressure board 13 configuring the bottom surface and an existing underground outer wall 14. The reconstruction method of the existing building comprises a step S2 of leaving a part of the existing underground outer wall 14 which is deeper than the ground water level W and the existing pressure board 13, demolishing the inside of the existing underground skeleton 11 and forming an underground space S enclosed by the existing pressure board 13 and the existing underground outer wall 14 and a step S3 of constructing a new underground skeleton 30 in the underground space S.SELECTED DRAWING: Figure 3
【課題】地下水位が既存地下躯体の底面よりも高い既存建物を建替える際に、工期の短縮および建設コストの削減を実現できる、既存建物の建替え方法を提供すること。【解決手段】既存建物の建替え方法は、地下水位Wが既存地下躯体11の底面よりも高い既存建物1を建替える方法である。既存地下躯体11は、底面を構成する既存耐圧盤13および側面を構成する既存地下外壁14を有する。既存建物の建替え方法は、既存地下外壁14のうち地下水位W以深となる部分および既存耐圧盤13を存置して、既存地下躯体11の内部を解体して、既存耐圧盤13および既存地下外壁14で囲まれた地下空間Sを形成するステップS2と、地下空間Sに新設地下躯体30を構築するステップS3と、を含む。【選択図】図3
RECONSTRUCTION METHOD OF EXISTING BUILDING AND RECONSTRUCTION BUILDING
To provide a reconstruction method of an existing building capable of reducing a work period and a construction cost in reconstructing the existing building of which ground water level is higher than a bottom surface of an existing underground skeleton.SOLUTION: A reconstruction method of an existing building is the method for reconstructing an existing building 1 of which ground water level W is higher than a bottom surface of an existing underground skeleton 11. The existing underground skeleton 11 has an existing pressure board 13 configuring the bottom surface and an existing underground outer wall 14. The reconstruction method of the existing building comprises a step S2 of leaving a part of the existing underground outer wall 14 which is deeper than the ground water level W and the existing pressure board 13, demolishing the inside of the existing underground skeleton 11 and forming an underground space S enclosed by the existing pressure board 13 and the existing underground outer wall 14 and a step S3 of constructing a new underground skeleton 30 in the underground space S.SELECTED DRAWING: Figure 3
【課題】地下水位が既存地下躯体の底面よりも高い既存建物を建替える際に、工期の短縮および建設コストの削減を実現できる、既存建物の建替え方法を提供すること。【解決手段】既存建物の建替え方法は、地下水位Wが既存地下躯体11の底面よりも高い既存建物1を建替える方法である。既存地下躯体11は、底面を構成する既存耐圧盤13および側面を構成する既存地下外壁14を有する。既存建物の建替え方法は、既存地下外壁14のうち地下水位W以深となる部分および既存耐圧盤13を存置して、既存地下躯体11の内部を解体して、既存耐圧盤13および既存地下外壁14で囲まれた地下空間Sを形成するステップS2と、地下空間Sに新設地下躯体30を構築するステップS3と、を含む。【選択図】図3
RECONSTRUCTION METHOD OF EXISTING BUILDING AND RECONSTRUCTION BUILDING
既存建物の建替え方法および建替え建物
WATANABE TORU (Autor:in) / MORIYAMA TAKAHIRO (Autor:in) / TANAKA RYUICHI (Autor:in) / AKIZUKI MICHITAKA (Autor:in)
28.09.2023
Patent
Elektronische Ressource
Japanisch
Europäisches Patentamt | 2022
|Minimally invasive waterproof layer reconstruction method for existing building
Europäisches Patentamt | 2022
|Europäisches Patentamt | 2020
|