CONCRETE STRUCTURE USING PRECAST FORMWORK AND CONSTRUCTION METHOD THEREOF
To simplify a reinforcement work of shear reinforcing bars, install the shear reinforcing bars at an appropriate cover thickness, and facilitate installation of precast formwork.SOLUTION: A concrete structure 1 includes a plurality of steel members 4 arranged parallel to each other at intervals, a plurality of shear reinforcing bars 5 supported by the steel members 4 and arranged at intervals in the axial direction of the steel members 4, a plurality of precast formwork 2 supported by the steel members 4 and arranged to surround the shear reinforcing bars 5 and the steel members 4, and concrete filled into a space surrounded with the precast formwork 2. The steel member 4 is provided with hook parts 12 that can support the shear reinforcing bars 5 at positions a predetermined distance from the precast formwork 2, and fitting holes 10 that can support the precast formwork 2 by fitting protrusions 11 provided on the precast formwork 2.SELECTED DRAWING: Figure 7
【課題】せん断補強筋の配筋作業を簡略化し、せん断補強筋を適切なかぶり厚さに設置し、プレキャスト型枠の設置を容易化する。【解決手段】コンクリート構造物1は、間隔を空けて互いに平行して配置される複数の鋼材4と、鋼材4に支持されるとともに、鋼材4の軸方向に間隔を空けて配置される複数のせん断補強筋5と、鋼材4に支持されるとともに、せん断補強筋5及び鋼材4を囲むように配置される複数のプレキャスト型枠2と、プレキャスト型枠2によって囲まれた空間に充填されるコンクリートとからなる。鋼材4に、プレキャスト型枠2から所定の離隔距離をおいた位置でせん断補強筋5を支持可能な掛止部12が備えられており、かつプレキャスト型枠2に設けられた突起部11が嵌合することによりプレキャスト型枠2を支持可能な嵌合穴10備えられている。【選択図】図7
CONCRETE STRUCTURE USING PRECAST FORMWORK AND CONSTRUCTION METHOD THEREOF
To simplify a reinforcement work of shear reinforcing bars, install the shear reinforcing bars at an appropriate cover thickness, and facilitate installation of precast formwork.SOLUTION: A concrete structure 1 includes a plurality of steel members 4 arranged parallel to each other at intervals, a plurality of shear reinforcing bars 5 supported by the steel members 4 and arranged at intervals in the axial direction of the steel members 4, a plurality of precast formwork 2 supported by the steel members 4 and arranged to surround the shear reinforcing bars 5 and the steel members 4, and concrete filled into a space surrounded with the precast formwork 2. The steel member 4 is provided with hook parts 12 that can support the shear reinforcing bars 5 at positions a predetermined distance from the precast formwork 2, and fitting holes 10 that can support the precast formwork 2 by fitting protrusions 11 provided on the precast formwork 2.SELECTED DRAWING: Figure 7
【課題】せん断補強筋の配筋作業を簡略化し、せん断補強筋を適切なかぶり厚さに設置し、プレキャスト型枠の設置を容易化する。【解決手段】コンクリート構造物1は、間隔を空けて互いに平行して配置される複数の鋼材4と、鋼材4に支持されるとともに、鋼材4の軸方向に間隔を空けて配置される複数のせん断補強筋5と、鋼材4に支持されるとともに、せん断補強筋5及び鋼材4を囲むように配置される複数のプレキャスト型枠2と、プレキャスト型枠2によって囲まれた空間に充填されるコンクリートとからなる。鋼材4に、プレキャスト型枠2から所定の離隔距離をおいた位置でせん断補強筋5を支持可能な掛止部12が備えられており、かつプレキャスト型枠2に設けられた突起部11が嵌合することによりプレキャスト型枠2を支持可能な嵌合穴10備えられている。【選択図】図7
CONCRETE STRUCTURE USING PRECAST FORMWORK AND CONSTRUCTION METHOD THEREOF
プレキャスト型枠を用いたコンクリート構造物及びその構築方法
ASANO HITOSHI (Autor:in) / TANAKA TORU (Autor:in) / TANAKA TAKASHI (Autor:in) / OKITA YOSHITAKA (Autor:in) / KANI YUKITSUGU (Autor:in) / MORIYA KENICHI (Autor:in) / OHASHI HIDENORI (Autor:in)
25.10.2023
Patent
Elektronische Ressource
Japanisch
CONSTRUCTION STRUCTURE OF PRECAST FORMWORK INTEGRATED REINFORCED CONCRETE
Europäisches Patentamt | 2023
|Assembled precast concrete formwork structure for road construction
Europäisches Patentamt | 2020
|British Library Online Contents | 2005
Construction method for gate pier bracket formwork-removal-free precast concrete formwork
Europäisches Patentamt | 2024
|PRECAST CONCRETE FORMWORK, FLOOR SYSTEM AND A METHOD OF CONSTRUCTION
Europäisches Patentamt | 2018
|