Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
TEMPORARY LINING STRUCTURE AND TEMPORARY LINING METHOD
To provide a temporary lining structure and a temporary lining method which suppress an influence on traffic due to traffic regulation accompanying construction, and can improve construction efficiency.SOLUTION: A temporary lining structure 1, which can cancel traffic regulation in a state where an excavation hole 15 formed by excavating a pavement part 21 is left, in construction for executing traffic regulation on a part of traffic lines on a road having a plurality of traffic lanes, and excavating the pavement part 21 on the part of traffic lanes, includes a road decking panel 11 that is erected at a height approximately the same with the formation height of the pavement part 21 on the excavation hole 15 formed by excavating the pavement part 21, and a trestle 12 which is provided between the excavation hole 15 and the road decking panel 11 and supports the road decking panel 11.SELECTED DRAWING: Figure 3
【課題】工事に伴う交通規制による交通への影響を抑制し、施工効率を向上できる仮覆構造および仮覆工法を提供する。【解決手段】複数の車線を有する道路の一部の車線に交通規制を設置し、一部の車線の舗装部21を掘削する工事において、舗装部21を掘削して形成された掘削穴15を残置した状態で交通規制を解除可能とする仮覆構造1であって、舗装部21を掘削して形成された掘削穴15上に舗装部21の形成高さと略一致する高さで架設された覆工版11と、掘削穴15と覆工版11との間に配置され、覆工版11を支持する架台12と、を備える。【選択図】図3
TEMPORARY LINING STRUCTURE AND TEMPORARY LINING METHOD
To provide a temporary lining structure and a temporary lining method which suppress an influence on traffic due to traffic regulation accompanying construction, and can improve construction efficiency.SOLUTION: A temporary lining structure 1, which can cancel traffic regulation in a state where an excavation hole 15 formed by excavating a pavement part 21 is left, in construction for executing traffic regulation on a part of traffic lines on a road having a plurality of traffic lanes, and excavating the pavement part 21 on the part of traffic lanes, includes a road decking panel 11 that is erected at a height approximately the same with the formation height of the pavement part 21 on the excavation hole 15 formed by excavating the pavement part 21, and a trestle 12 which is provided between the excavation hole 15 and the road decking panel 11 and supports the road decking panel 11.SELECTED DRAWING: Figure 3
【課題】工事に伴う交通規制による交通への影響を抑制し、施工効率を向上できる仮覆構造および仮覆工法を提供する。【解決手段】複数の車線を有する道路の一部の車線に交通規制を設置し、一部の車線の舗装部21を掘削する工事において、舗装部21を掘削して形成された掘削穴15を残置した状態で交通規制を解除可能とする仮覆構造1であって、舗装部21を掘削して形成された掘削穴15上に舗装部21の形成高さと略一致する高さで架設された覆工版11と、掘削穴15と覆工版11との間に配置され、覆工版11を支持する架台12と、を備える。【選択図】図3
TEMPORARY LINING STRUCTURE AND TEMPORARY LINING METHOD
仮覆構造および仮覆工法
KONO SHIGEYUKI (Autor:in) / SUZUKI MASANORI (Autor:in) / AWAJI DOTA (Autor:in)
02.11.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Temporary water retaining structure for repairing full-section lining channel
Europäisches Patentamt | 2023
|TEMPORARY BRIDGE WITH VARYING SECTION GIRDER AND CONTINUOUS LINING BOARD
Europäisches Patentamt | 2019
|Temporary tunnel with a lightweight lining at the Kurpsa hydroelectric station
Online Contents | 1980
|Temporary tunnel with a lightweight lining at the Kurpsa hydroelectric station
Springer Verlag | 1980
|Temporary sinking layout and design of steel shaft lining at lehigh, mont
Engineering Index Backfile | 1917
|