CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT METHOD, AND PROGRAM
To enable the proper identification of a compaction-possible area in a construction site.SOLUTION: A construction management system comprises: a section determination part which, with respect to sections configured to sectionalize a construction object field, based on a result of leveling performed by a bulldozer, determines complete sections where the bulldozer's leveling has been completed and incomplete sections where the leveling has not been completed in the construction object field; and an area-configuration part to configure, as compaction-possible areas that can be compacted by a roller, within the complete sections determined by the section determination part, areas of the complete sections located at a specified minimum distance or farther from incomplete areas of the incomplete sections.SELECTED DRAWING: Figure 8
【課題】施工現場において締め固めが可能な領域を適正に特定できるようにする。【解決手段】施工対象領域を区分するように設定した区画について、前記施工対象領域におけるブルドーザーの敷均しの実行結果に基づいて、前記ブルドーザーによる敷均しが完了した完了区画と、敷均しが完了していない未完区画とを判定する区画判定部と、前記区画判定部により判定された完了区画のうちで、前記未完区画による未完領域から一定以上の距離を有する完了区画による領域をローラーによる締め固めが可能な締め固め可能領域として設定する領域設定部とを備えて施工管理システムを構成する。【選択図】図8
CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT METHOD, AND PROGRAM
To enable the proper identification of a compaction-possible area in a construction site.SOLUTION: A construction management system comprises: a section determination part which, with respect to sections configured to sectionalize a construction object field, based on a result of leveling performed by a bulldozer, determines complete sections where the bulldozer's leveling has been completed and incomplete sections where the leveling has not been completed in the construction object field; and an area-configuration part to configure, as compaction-possible areas that can be compacted by a roller, within the complete sections determined by the section determination part, areas of the complete sections located at a specified minimum distance or farther from incomplete areas of the incomplete sections.SELECTED DRAWING: Figure 8
【課題】施工現場において締め固めが可能な領域を適正に特定できるようにする。【解決手段】施工対象領域を区分するように設定した区画について、前記施工対象領域におけるブルドーザーの敷均しの実行結果に基づいて、前記ブルドーザーによる敷均しが完了した完了区画と、敷均しが完了していない未完区画とを判定する区画判定部と、前記区画判定部により判定された完了区画のうちで、前記未完区画による未完領域から一定以上の距離を有する完了区画による領域をローラーによる締め固めが可能な締め固め可能領域として設定する領域設定部とを備えて施工管理システムを構成する。【選択図】図8
CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT METHOD, AND PROGRAM
施工管理システム、施工管理方法、及びプログラム
HIRATA HIROTATSU (Autor:in) / MIYASHITA YUKI (Autor:in) / YAMAMOTO SHINYA (Autor:in) / SUZUKI MASANORI (Autor:in) / NAKAZATO KENICHI (Autor:in)
24.11.2023
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT PROGRAM, AND CONSTRUCTION MANAGEMENT METHOD
Europäisches Patentamt | 2015
|CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT METHOD, AND PROGRAM
Europäisches Patentamt | 2023
|CONSTRUCTION MANAGEMENT SYSTEM, CONSTRUCTION MANAGEMENT METHOD, AND PROGRAM
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2022
|CONSTRUCTION ERROR MANAGEMENT METHOD, CONSTRUCTION ERROR MANAGEMENT SYSTEM AND PROGRAM
Europäisches Patentamt | 2023
|