Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
SLOPE REINFORCEMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
To provide a slope reinforcement structure and a construction method thereof that can appropriately perform slope reinforcement within a limited construction range.SOLUTION: A slope reinforcement structure 1 for reinforcing the ground having a slope has a first drilled part 11 that is drilled from the slope, and a first reinforcing material 12 that is inserted into the first drilled part 11, and has a first reinforcing body 10 in which the first drilled part 11 is filled with a filler F and the first reinforcing material 12 is fixed, and a second drilled part 21 that is drilled from a location other than the slope and is connected to the first drilled part 11, and a second reinforcing material 22 that is inserted into the second drilled part 21. A second reinforcing body 20 in which the second drilled part 21 is filled with the filler F and the second reinforcing material 22 is fixed and a connection portion 30 where the first reinforcing material 12 and the second reinforcing material 22 are connected are provided.SELECTED DRAWING: Figure 2
【課題】限られた施工範囲で適切に斜面補強を行うことが可能な斜面補強構造及びその工法を提供する。【解決手段】斜面を有する地盤を補強する斜面補強構造1において、斜面から削孔された第一削孔部11と、第一削孔部11に挿入された第一補強材12と、を有し、かつ、第一削孔部11に充填材Fが充填されて第一補強材12が定着した、第一補強体10と、斜面以外の箇所から削孔され、第一削孔部11に接続された第二削孔部21と、第二削孔部21に挿入された第二補強材22と、を有し、かつ、第二削孔部21に充填材Fが充填されて第二補強材22が定着した、第二補強体20と、第一補強材12と第二補強材22とが接続された接続部30と、を設ける。【選択図】図2
SLOPE REINFORCEMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
To provide a slope reinforcement structure and a construction method thereof that can appropriately perform slope reinforcement within a limited construction range.SOLUTION: A slope reinforcement structure 1 for reinforcing the ground having a slope has a first drilled part 11 that is drilled from the slope, and a first reinforcing material 12 that is inserted into the first drilled part 11, and has a first reinforcing body 10 in which the first drilled part 11 is filled with a filler F and the first reinforcing material 12 is fixed, and a second drilled part 21 that is drilled from a location other than the slope and is connected to the first drilled part 11, and a second reinforcing material 22 that is inserted into the second drilled part 21. A second reinforcing body 20 in which the second drilled part 21 is filled with the filler F and the second reinforcing material 22 is fixed and a connection portion 30 where the first reinforcing material 12 and the second reinforcing material 22 are connected are provided.SELECTED DRAWING: Figure 2
【課題】限られた施工範囲で適切に斜面補強を行うことが可能な斜面補強構造及びその工法を提供する。【解決手段】斜面を有する地盤を補強する斜面補強構造1において、斜面から削孔された第一削孔部11と、第一削孔部11に挿入された第一補強材12と、を有し、かつ、第一削孔部11に充填材Fが充填されて第一補強材12が定着した、第一補強体10と、斜面以外の箇所から削孔され、第一削孔部11に接続された第二削孔部21と、第二削孔部21に挿入された第二補強材22と、を有し、かつ、第二削孔部21に充填材Fが充填されて第二補強材22が定着した、第二補強体20と、第一補強材12と第二補強材22とが接続された接続部30と、を設ける。【選択図】図2
SLOPE REINFORCEMENT STRUCTURE AND CONSTRUCTION METHOD THEREOF
斜面補強構造及びその工法
MAEDA KAZUNORI (Autor:in) / HASHIMOTO TAKAO (Autor:in) / IWAZU MASAYA (Autor:in) / KANEKO KEITA (Autor:in) / NODA SHOJI (Autor:in)
17.01.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
Slope reinforcement construction method and reinforcement structure
Europäisches Patentamt | 2024
|Europäisches Patentamt | 2019
|Europäisches Patentamt | 2022
|Slope reinforcement construction method using vegetation soil and slope reinforcement construction
Europäisches Patentamt | 2021
|