Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
HOLDING CHUCK ATTACHMENT, AND PILE PRESS-IN CONSTRUCTION METHOD
To enable press-in of a longer press-in pile when press-in piles are connected by a vertical joint and pressed-in.SOLUTION: A pile press-in device 10 comprises: a saddle 1; clamp devices 2F, 2R provided at a bottom of the saddle 1 and gripping upper ends of existing piles pressed into the ground; a mast 4 erected on the saddle 1; a lifting device 5; and a chuck device 6 supported by the mast 4 via the lifting device 5 and gripping pressed-in piles Pd. Using the pile press-in device 10, when connecting a plurality of pressed-in piles Pd by a vertical joint and pressing a connected pile connected in a longitudinal direction into the ground, a holding chuck attachment 60 holds upper parts of the pressed-in piles Pd. The holding chuck attachment 60 includes: a fixing clamp device 64 clamping the upper ends of the existing piles P and fixing the holding chuck attachment 60 to the existing piles P; and holding chuck devices 61, 62 gripping the upper parts of the pressed-in piles Pd.SELECTED DRAWING: Figure 7
【課題】圧入杭と圧入杭とを縦継ぎにより連結して圧入する場合に、より丈の長い圧入杭の圧入を可能とする。【解決手段】サドル1と、サドル1の下部に設けられ、地盤に圧入された既設杭の上端部を把持するクランプ装置2F,2Rと、サドル1上に立設されたマスト4と、昇降装置5と、昇降装置5を介してマスト4に支持され、圧入杭Pdを把持するチャック装置6とを備えた杭圧入装置10を用いて、複数の圧入杭Pdを縦継ぎにより連結して長手方向に連接されてなる連接杭を地盤に圧入する際に圧入杭Pdの上部を保持する保持チャックアタッチメント60であって、既設杭Pの上端部をクランプして保持チャックアタッチメント60を既設杭Pに固定する固定用クランプ装置64と、圧入杭Pdの上部を把持する保持用チャック装置61,62とを有する。【選択図】図7
HOLDING CHUCK ATTACHMENT, AND PILE PRESS-IN CONSTRUCTION METHOD
To enable press-in of a longer press-in pile when press-in piles are connected by a vertical joint and pressed-in.SOLUTION: A pile press-in device 10 comprises: a saddle 1; clamp devices 2F, 2R provided at a bottom of the saddle 1 and gripping upper ends of existing piles pressed into the ground; a mast 4 erected on the saddle 1; a lifting device 5; and a chuck device 6 supported by the mast 4 via the lifting device 5 and gripping pressed-in piles Pd. Using the pile press-in device 10, when connecting a plurality of pressed-in piles Pd by a vertical joint and pressing a connected pile connected in a longitudinal direction into the ground, a holding chuck attachment 60 holds upper parts of the pressed-in piles Pd. The holding chuck attachment 60 includes: a fixing clamp device 64 clamping the upper ends of the existing piles P and fixing the holding chuck attachment 60 to the existing piles P; and holding chuck devices 61, 62 gripping the upper parts of the pressed-in piles Pd.SELECTED DRAWING: Figure 7
【課題】圧入杭と圧入杭とを縦継ぎにより連結して圧入する場合に、より丈の長い圧入杭の圧入を可能とする。【解決手段】サドル1と、サドル1の下部に設けられ、地盤に圧入された既設杭の上端部を把持するクランプ装置2F,2Rと、サドル1上に立設されたマスト4と、昇降装置5と、昇降装置5を介してマスト4に支持され、圧入杭Pdを把持するチャック装置6とを備えた杭圧入装置10を用いて、複数の圧入杭Pdを縦継ぎにより連結して長手方向に連接されてなる連接杭を地盤に圧入する際に圧入杭Pdの上部を保持する保持チャックアタッチメント60であって、既設杭Pの上端部をクランプして保持チャックアタッチメント60を既設杭Pに固定する固定用クランプ装置64と、圧入杭Pdの上部を把持する保持用チャック装置61,62とを有する。【選択図】図7
HOLDING CHUCK ATTACHMENT, AND PILE PRESS-IN CONSTRUCTION METHOD
保持チャックアタッチメント及び杭圧入施工方法
MURATA TOSHIHIKO (Autor:in)
17.01.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
PILE HOLDING JIG, PILE HOLDING JIG ASSEMBLY, AND CONSTRUCTION METHOD FOR HOLDING PILE POSITION
Europäisches Patentamt | 2020
|Pile lifting chuck and Pile lifting device using the chuck
Europäisches Patentamt | 2021
|Pile lifting chuck and Pile lifting device using the chuck
Europäisches Patentamt | 2021
PRECAST PILE HOLDING DEVICE AND FOUNDATION PILE CONSTRUCTION METHOD
Europäisches Patentamt | 2021
|