Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
LINING CONCRETE PLACING SYSTEM AND METHOD FOR DETERMINING FILLING COMPLETION TIME IN LINING CONCRETE PLACEMENT
To provide a lining concrete placing system and a method for determining filling completion time in lining concrete placement that can determine the completion time of filling concrete into a lining formwork without relying on experience or intuition and without any danger, and without increasing costs and requiring complicated labor.SOLUTION: In a configuration that includes a concrete pump, a pressure feed pipe of which one end is connected to the concrete pump, and a lining formwork provided with a press-in hole to which the other end of the pressure feed pipe is connected, and in which placement is performed by pressure feed-filling self-compacting concrete into the lining formwork, a pressure sensor that measures the pressure value of the self-compacting concrete to be pressure-fed is installed at least in one place on the pressure feed pipe. When the pressure value measured by the pressure sensor reaches a peak, it is determined that filling with the self-compacting concrete is completed.SELECTED DRAWING: Figure 1
【課題】経験や勘に頼ることなく且つ危険を伴うことなく覆工型枠内へのコンクリートの充填完了時期を判定することができ、しかもコスト増を招くことなく且つ煩雑な手間を掛けることなく判定することができる覆工コンクリートの打込みシステム及び覆工コンクリート打込みにおける充填完了時期の判定方法を提供する。【解決手段】コンクリートポンプと、コンクリートポンプに一端を接続する圧送管と、圧送管の他端が接続される圧入孔が設けられた覆工型枠と、を有し、覆工型枠内に自己充填コンクリートを圧送充填することにより打込みを行う構成において、圧送管には、圧送される自己充填コンクリートの圧力値を計測する圧力センサが少なくとも一カ所に配設されており、圧力センサによって計測された圧力値がピークとなった時に自己充填コンクリートの充填が完了したことを判定する構成であること、を特徴とする。【選択図】図1
LINING CONCRETE PLACING SYSTEM AND METHOD FOR DETERMINING FILLING COMPLETION TIME IN LINING CONCRETE PLACEMENT
To provide a lining concrete placing system and a method for determining filling completion time in lining concrete placement that can determine the completion time of filling concrete into a lining formwork without relying on experience or intuition and without any danger, and without increasing costs and requiring complicated labor.SOLUTION: In a configuration that includes a concrete pump, a pressure feed pipe of which one end is connected to the concrete pump, and a lining formwork provided with a press-in hole to which the other end of the pressure feed pipe is connected, and in which placement is performed by pressure feed-filling self-compacting concrete into the lining formwork, a pressure sensor that measures the pressure value of the self-compacting concrete to be pressure-fed is installed at least in one place on the pressure feed pipe. When the pressure value measured by the pressure sensor reaches a peak, it is determined that filling with the self-compacting concrete is completed.SELECTED DRAWING: Figure 1
【課題】経験や勘に頼ることなく且つ危険を伴うことなく覆工型枠内へのコンクリートの充填完了時期を判定することができ、しかもコスト増を招くことなく且つ煩雑な手間を掛けることなく判定することができる覆工コンクリートの打込みシステム及び覆工コンクリート打込みにおける充填完了時期の判定方法を提供する。【解決手段】コンクリートポンプと、コンクリートポンプに一端を接続する圧送管と、圧送管の他端が接続される圧入孔が設けられた覆工型枠と、を有し、覆工型枠内に自己充填コンクリートを圧送充填することにより打込みを行う構成において、圧送管には、圧送される自己充填コンクリートの圧力値を計測する圧力センサが少なくとも一カ所に配設されており、圧力センサによって計測された圧力値がピークとなった時に自己充填コンクリートの充填が完了したことを判定する構成であること、を特徴とする。【選択図】図1
LINING CONCRETE PLACING SYSTEM AND METHOD FOR DETERMINING FILLING COMPLETION TIME IN LINING CONCRETE PLACEMENT
覆工コンクリートの打込みシステム及び覆工コンクリート打込みにおける充填完了時期の判定方法
HASHIMOTO SHINICHIRO (Autor:in) / UNO YOSHIKI (Autor:in) / ONO KAZUYOSHI (Autor:in) / KOYAMA HIROMITSU (Autor:in) / HIROMITSU TARO (Autor:in) / FUJIWARA SHOSUKE (Autor:in)
08.02.2024
Patent
Elektronische Ressource
Japanisch
Europäisches Patentamt | 2024
|Placing concrete lining in highway tunnel
Engineering Index Backfile | 1941
Placing concrete lining in 19-Ft tunnel
Engineering Index Backfile | 1943
Machine for placing concrete lining in canal
Engineering Index Backfile | 1916
|Concrete shaft lining; development of form handling and concrete placing methods
Engineering Index Backfile | 1916