JOINT STRUCTURE BETWEEN PRECAST SLAB AND STEEL BEAM
To provide a joint structure between a precast slab and a steel beam that can effectively transmit forces generated in the slab during an earthquake to the steel beam and can accommodate construction errors.SOLUTION: A joint structure 100 between a precast slab and a steel beam comprises a precast slab 23, a steel beam 22 supporting the precast slab 23, a space portion 241 inside a hole formed through the precast slab 23 in a vertical direction, a nut 31 located in the space portion 241 and smaller than the space portion 241, an adhesive 33 filled into a gap between the space portion 241 and the nut 31, a flange-side bolt hole 221a formed in an upper flange 221 of the steel beam 22 so as to communicate with the nut 31, and a lower bolt 35 inserted from below into the flange-side bolt hole 221a and fastened to the nut 31.SELECTED DRAWING: Figure 1
【課題】地震時に床版に発生する力を鉄骨梁へ有効に伝達するとともに、施工誤差に対応することができるプレキャスト床版と鉄骨梁との接合構造を提供する。【解決手段】プレキャスト床版と鉄骨梁との接合構造100は、プレキャスト床版23と、プレキャスト床版23を支持する鉄骨梁22と、プレキャスト床版23に上下方向に貫通するように形成された孔の内側の空間部241と、空間部241に配置され、空間部241よりも小さいナット31と、空間部241とナット31との隙間に充填された接着剤33と、ナット31と連通するように、鉄骨梁22の上側フランジ221に形成されたフランジ側ボルト孔221aと、フランジ側ボルト孔221aに対して下側から挿通され、ナット31に締結される下側ボルト35と、を備える。【選択図】図1
JOINT STRUCTURE BETWEEN PRECAST SLAB AND STEEL BEAM
To provide a joint structure between a precast slab and a steel beam that can effectively transmit forces generated in the slab during an earthquake to the steel beam and can accommodate construction errors.SOLUTION: A joint structure 100 between a precast slab and a steel beam comprises a precast slab 23, a steel beam 22 supporting the precast slab 23, a space portion 241 inside a hole formed through the precast slab 23 in a vertical direction, a nut 31 located in the space portion 241 and smaller than the space portion 241, an adhesive 33 filled into a gap between the space portion 241 and the nut 31, a flange-side bolt hole 221a formed in an upper flange 221 of the steel beam 22 so as to communicate with the nut 31, and a lower bolt 35 inserted from below into the flange-side bolt hole 221a and fastened to the nut 31.SELECTED DRAWING: Figure 1
【課題】地震時に床版に発生する力を鉄骨梁へ有効に伝達するとともに、施工誤差に対応することができるプレキャスト床版と鉄骨梁との接合構造を提供する。【解決手段】プレキャスト床版と鉄骨梁との接合構造100は、プレキャスト床版23と、プレキャスト床版23を支持する鉄骨梁22と、プレキャスト床版23に上下方向に貫通するように形成された孔の内側の空間部241と、空間部241に配置され、空間部241よりも小さいナット31と、空間部241とナット31との隙間に充填された接着剤33と、ナット31と連通するように、鉄骨梁22の上側フランジ221に形成されたフランジ側ボルト孔221aと、フランジ側ボルト孔221aに対して下側から挿通され、ナット31に締結される下側ボルト35と、を備える。【選択図】図1
JOINT STRUCTURE BETWEEN PRECAST SLAB AND STEEL BEAM
プレキャスト床版と鉄骨梁との接合構造
YAMAZAKI YASUNORI (Autor:in)
07.03.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E04B
Allgemeine Baukonstruktionen
,
GENERAL BUILDING CONSTRUCTIONS
JOINT STRUCTURE BETWEEN STEEL GIRDER AND PRECAST FLOOR SLAB
Europäisches Patentamt | 2023
|PRECAST COMPOSITE SLAB, JOINT METHOD OF PRECAST COMPOSITE SLAB AND BEAM MEMBER, AND JOINT STRUCTURE
Europäisches Patentamt | 2019
|Europäisches Patentamt | 2018
|PRECAST FLOOR SLAB JOINT STRUCTURE AND PRECAST FLOOR SLAB
Europäisches Patentamt | 2021
|