Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
FLOOR MATERIAL, METHOD FOR ATTACHING FLOOR MATERIAL AND METHOD FOR REMOVING FLOOR MATERIAL
To provide a floor material that can prevent the formation of steps, a method for attaching the floor material and a method for removing the floor material.SOLUTION: A base material layer 12 of a floor material 10 has a first short edge portion 30, a second short edge portion 40, a first long edge portion 50 and a second long edge portion 60. On the surface side of the first short edge portion 30, there is a first protrusion 34 protruding to one side in the longitudinal direction of the base material layer 12, and on the back side of the second short edge portion 40, there is a second protrusion 44 protruding to the other side in the longitudinal direction of the base material layer 12. The first long edge portion 50 is provided with a male solid portion 52 extending in the longitudinal direction of the base material layer 12, and the second long edge portion 60 is provided with a female solid portion 62 extending in the longitudinal direction of the base material layer 12.SELECTED DRAWING: Figure 1
【課題】段差が生じることを防止できる床材、床材の貼り付け方法および床材の取り外し方法を提供する。【解決手段】床材10の基材層12は、第1短辺部30、第2短辺部40、第1長辺部50および第2長辺部60を有する。第1短辺部30の表面側には、基材層12の長手方向における一方側に突出する第1突出部34が設けられ、第2短辺部40の裏面側には、基材層12の長手方向における他方側に突出する第2突出部44が設けられている。また、第1長辺部50には、基材層12の長手方向に延びる雄実部52が設けられ、第2長辺部60には、基材層12の長手方向に延びる雌実部62が設けられている。【選択図】 図1
FLOOR MATERIAL, METHOD FOR ATTACHING FLOOR MATERIAL AND METHOD FOR REMOVING FLOOR MATERIAL
To provide a floor material that can prevent the formation of steps, a method for attaching the floor material and a method for removing the floor material.SOLUTION: A base material layer 12 of a floor material 10 has a first short edge portion 30, a second short edge portion 40, a first long edge portion 50 and a second long edge portion 60. On the surface side of the first short edge portion 30, there is a first protrusion 34 protruding to one side in the longitudinal direction of the base material layer 12, and on the back side of the second short edge portion 40, there is a second protrusion 44 protruding to the other side in the longitudinal direction of the base material layer 12. The first long edge portion 50 is provided with a male solid portion 52 extending in the longitudinal direction of the base material layer 12, and the second long edge portion 60 is provided with a female solid portion 62 extending in the longitudinal direction of the base material layer 12.SELECTED DRAWING: Figure 1
【課題】段差が生じることを防止できる床材、床材の貼り付け方法および床材の取り外し方法を提供する。【解決手段】床材10の基材層12は、第1短辺部30、第2短辺部40、第1長辺部50および第2長辺部60を有する。第1短辺部30の表面側には、基材層12の長手方向における一方側に突出する第1突出部34が設けられ、第2短辺部40の裏面側には、基材層12の長手方向における他方側に突出する第2突出部44が設けられている。また、第1長辺部50には、基材層12の長手方向に延びる雄実部52が設けられ、第2長辺部60には、基材層12の長手方向に延びる雌実部62が設けられている。【選択図】 図1
FLOOR MATERIAL, METHOD FOR ATTACHING FLOOR MATERIAL AND METHOD FOR REMOVING FLOOR MATERIAL
床材、床材の貼り付け方法および床材の取り外し方法
YAMAZAKI SHINGO (Autor:in) / MASAKI SHOHEI (Autor:in) / YONEMURA TOMOE (Autor:in)
23.08.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E04F
FINISHING WORK ON BUILDINGS, e.g. STAIRS, FLOORS
,
Ausbau von Bauwerken, z.B. Treppen, Fußböden
FLOOR MATERIAL AND METHOD FOR ATTACHING FLOOR MATERIAL
Europäisches Patentamt | 2022
|FLOOR MATERIAL MANUFACTURING METHOD, FLOOR MATERIAL AND FLOOR MATERIAL CONSTRUCTION STRUCTURE
Europäisches Patentamt | 2023
|FLOOR MATERIAL, CONSTRUCTION METHOD OF FLOOR MATERIAL, FLOOR STRUCTURE
Europäisches Patentamt | 2021
|Europäisches Patentamt | 2019
|FLOOR MATERIAL AND FLOOR MATERIAL CONSTRUCTION METHOD
Europäisches Patentamt | 2022
|