Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
GRAVE CHARNEL CHAMBER AND METHOD FOR CONSTRUCTING GRAVE CHARNEL CHAMBER
To provide a grave charnel chamber comprising a base plate that configures the bottom of the charnel chamber and a side wall plate that is fixed to an upper surface of the charnel chamber and configures a side wall of the charnel chamber, in which after a charnel chamber part formed from at least the base plate and the side wall plate is assembled at a factory, it is conveyed to the grave, and even when it is installed at the grave using a crane, damage of the bottom of the charnel chamber part is prevented, and pre-work of lifting the charnel chamber part by the crane can be simplified.SOLUTION: A grave charnel chamber 1 comprises a base plate 9 that is formed from one flat stone and configures the bottom of the charnel chamber 1, stone side wall plates 11, 12 that are fixed to the base plate 9 and configure the side wall of the charnel chamber 1, and a stone top plate 13 that configures an upper part of the charnel chamber 1 and on which a stone monument is placed. A recess 9b is formed on the bottom surface of the base plate 9, the recess being recessed from the bottom surface of the base plate 9 toward the upper side and extending from one end surface to the other end surface of the base plate 9 in the horizontal direction.SELECTED DRAWING: Figure 4
【課題】納骨室の底部を構成する土台板と、土台板の上面に固定され納骨室の側壁を構成する石製の側壁板とを備えるお墓の納骨室において、少なくとも土台板と側壁板とからなる納骨室部を工場で組み立てた後、墓地に搬送して、クレーンを用いて墓地に設置する場合であっても、納骨室部の底部の破損を防止しつつ、クレーンで納骨室部を吊り上げる前の作業を簡素化することが可能なお墓の納骨室を提供する。【解決手段】お墓の納骨室1は、平板状の1枚の石で形成され納骨室1の底部を構成する土台板9と、土台板9の上面に固定され納骨室1の側壁を構成する石製の側壁板11、12と、納骨室1の上部を構成するとともに上側に石碑が載置される石製の天板13とを備えている。土台板9の底面には、土台板9の底面から上側に向かって窪むとともに土台板9の水平方向の端面から端面まで通じる凹部9bが形成されている。【選択図】図4
GRAVE CHARNEL CHAMBER AND METHOD FOR CONSTRUCTING GRAVE CHARNEL CHAMBER
To provide a grave charnel chamber comprising a base plate that configures the bottom of the charnel chamber and a side wall plate that is fixed to an upper surface of the charnel chamber and configures a side wall of the charnel chamber, in which after a charnel chamber part formed from at least the base plate and the side wall plate is assembled at a factory, it is conveyed to the grave, and even when it is installed at the grave using a crane, damage of the bottom of the charnel chamber part is prevented, and pre-work of lifting the charnel chamber part by the crane can be simplified.SOLUTION: A grave charnel chamber 1 comprises a base plate 9 that is formed from one flat stone and configures the bottom of the charnel chamber 1, stone side wall plates 11, 12 that are fixed to the base plate 9 and configure the side wall of the charnel chamber 1, and a stone top plate 13 that configures an upper part of the charnel chamber 1 and on which a stone monument is placed. A recess 9b is formed on the bottom surface of the base plate 9, the recess being recessed from the bottom surface of the base plate 9 toward the upper side and extending from one end surface to the other end surface of the base plate 9 in the horizontal direction.SELECTED DRAWING: Figure 4
【課題】納骨室の底部を構成する土台板と、土台板の上面に固定され納骨室の側壁を構成する石製の側壁板とを備えるお墓の納骨室において、少なくとも土台板と側壁板とからなる納骨室部を工場で組み立てた後、墓地に搬送して、クレーンを用いて墓地に設置する場合であっても、納骨室部の底部の破損を防止しつつ、クレーンで納骨室部を吊り上げる前の作業を簡素化することが可能なお墓の納骨室を提供する。【解決手段】お墓の納骨室1は、平板状の1枚の石で形成され納骨室1の底部を構成する土台板9と、土台板9の上面に固定され納骨室1の側壁を構成する石製の側壁板11、12と、納骨室1の上部を構成するとともに上側に石碑が載置される石製の天板13とを備えている。土台板9の底面には、土台板9の底面から上側に向かって窪むとともに土台板9の水平方向の端面から端面まで通じる凹部9bが形成されている。【選択図】図4
GRAVE CHARNEL CHAMBER AND METHOD FOR CONSTRUCTING GRAVE CHARNEL CHAMBER
お墓の納骨室およびお墓の納骨室の施工方法
HOSHINA HIDEAKI (Autor:in)
06.11.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E04H
Gebäude oder ähnliche Bauwerke für besondere Zwecke
,
BUILDINGS OR LIKE STRUCTURES FOR PARTICULAR PURPOSES
GRAVE HAVING GROUND INSTALLATION TYPE HYBRID CHARNEL CHAMBER
Europäisches Patentamt | 2019
|