CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
To provide a construction method of an underground structure and an underground structure which can suppress generation of a difference of elevation of a ground between a part constructed by a normal construction method and a part constructed by an inverted construction method.SOLUTION: There are provided: a construction method of an underground structure of a building 1 which includes a first construction step of constructing a first structure part 21 of an underground structure 20 by a normal construction method, a second construction step of constructing a second structure part 22 adjacent to the first structure part 21 of the underground structure 20 by an inverted construction method, and a brace installation step of installing a brace 30 in a boundary part B between the first structure part 21 and the second structure part 22; and the underground structure 20 which has the first structure part 21 constructed by the normal construction method, the second structure part 22 constructed by the inverted construction method, and the brace 30 installed in the boundary part B between the first structure part 21 and the second structure part 22.SELECTED DRAWING: Figure 1
【課題】順打ち工法によって構築された部分と逆打ち工法で構築された部分とに地盤の高低差が生じることを抑制することが可能な地下構造物の構築方法及び地下構造物を提供することができる。【解決手段】建築物1の地下構造物の構築方法であって、地下構造物20の第1構造部21を順打ち工法で構築する第1構築工程と、地下構造物20の第1構造部21に隣接する第2構造部22を逆打ち工法で構築する第2構築工程と、第1構造部21と第2構造部22との境界部分Bにブレース30を設置するブレース設置工程と、を有することを特徴とする地下構造物の構築方法、及び、順打ち工法で構築された第1構造部21と、逆打ち工法で構築された第2構造部22と、第1構造部21と第2構造部22との境界部分Bに設置されたブレース30とを有する地下構造物20。【選択図】図1
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
To provide a construction method of an underground structure and an underground structure which can suppress generation of a difference of elevation of a ground between a part constructed by a normal construction method and a part constructed by an inverted construction method.SOLUTION: There are provided: a construction method of an underground structure of a building 1 which includes a first construction step of constructing a first structure part 21 of an underground structure 20 by a normal construction method, a second construction step of constructing a second structure part 22 adjacent to the first structure part 21 of the underground structure 20 by an inverted construction method, and a brace installation step of installing a brace 30 in a boundary part B between the first structure part 21 and the second structure part 22; and the underground structure 20 which has the first structure part 21 constructed by the normal construction method, the second structure part 22 constructed by the inverted construction method, and the brace 30 installed in the boundary part B between the first structure part 21 and the second structure part 22.SELECTED DRAWING: Figure 1
【課題】順打ち工法によって構築された部分と逆打ち工法で構築された部分とに地盤の高低差が生じることを抑制することが可能な地下構造物の構築方法及び地下構造物を提供することができる。【解決手段】建築物1の地下構造物の構築方法であって、地下構造物20の第1構造部21を順打ち工法で構築する第1構築工程と、地下構造物20の第1構造部21に隣接する第2構造部22を逆打ち工法で構築する第2構築工程と、第1構造部21と第2構造部22との境界部分Bにブレース30を設置するブレース設置工程と、を有することを特徴とする地下構造物の構築方法、及び、順打ち工法で構築された第1構造部21と、逆打ち工法で構築された第2構造部22と、第1構造部21と第2構造部22との境界部分Bに設置されたブレース30とを有する地下構造物20。【選択図】図1
CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
地下構造物の構築方法及び地下構造物
MITANI ATSUSHI (Autor:in)
21.11.2024
Patent
Elektronische Ressource
Japanisch
IPC:
E02D
FOUNDATIONS
,
Gründungen
UNDERGROUND STRUCTURE AND CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE
Europäisches Patentamt | 2017
|CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE AND UNDERGROUND STRUCTURE
Europäisches Patentamt | 2023
|Europäisches Patentamt | 2024
|CONSTRUCTION METHOD OF UNDERGROUND STRUCTURE, AND UNDERGROUND STRUCTURE
Europäisches Patentamt | 2018
|Europäisches Patentamt | 2021
|