Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
PRESTRESSED CONCRETE GIRDER FOR CONTINUOUS COMPOSITE GIRDER BRIDGE AND CONSTRUCTION METHOD FOR THEREOF
The present invention relates to a construction method of a continuous composite girder bridge using a prestressed concrete girder for a continuous composite girder bridge and, more specifically, to a construction method of a continuous composite girder bridge using a prestressed concrete girder for a continuous composite girder bridge, which enables the continuation of a girder using a tendon by installing precast PSC girders on a lower structure, such as an abutment and a pier, and joining the girders to a continuation part in the pier using cast-in-place concrete before the construction of a bottom plate. Therefore, the present invention improves structural efficiency, facilitates a tension work, and is suitable for a multi-span continuous bridge by using tendons of a positive moment applied part and a negative moment applied part of the continuous girder, which are different from each other.
본 발명은 연속 합성거더교용 프리스트레스트 콘크리트 거더 및 이를 이용한 연속 합성거더교의 시공 방법에 관한 것으로서, 더욱 상세하게는 프리캐스트 PSC 거더들을 교대 및 교각 등의 하부구조 위에 설치하고 바닥판을 시공하기 전에 교각상의 연속부에서 거더를 현장타설 콘크리트로 이음하고 텐던을 사용하여 연속화를 하는 거더 연속화 시공방법에 있어서 연속화된 거더의 정모멘트 작용부와 부모멘트 작용부의 텐던을 다르게 구성하여 구조적으로 매우 효율적이며 긴장 작업도 용이하고 다경간 연속교에도 적합한 연속 합성거더교용 프리스트레스트 콘크리트 거더 및 이를 이용한 연속 합성거더교의 시공 방법에 관한 것이다. 본 발명은, 프리캐스트 프리스트레스트 콘크리트 거더들을 교대 및 교각 등의 하부구조 위에 설치하고 바닥판을 시공하기 전에 교각상의 거더 연속부에서 거더를 현장타설 콘크리트로 이음하고 텐던을 사용하여 연속화를 하는 거더 연속화 시공방법에 있어서, 연속거더의 양단부에 배치되는 측경간용 거더와 상기 측경간용 거더의 사이에 배치되는 중앙 경간용 거더를 포함(중앙 경간용 거더는 거더의 수가 3개 이상인 경우에만 포함)하며 연속 합성거더교에 사용되는 프리스트레스트 콘크리트 거더에 있어서, 거더 연속화 이후에 연속 거더에 작용하는 사하중들에 의한 작용 휨모멘트의 부호가 변하는 변곡점 주변(측경간용 거더의 본체에는 교대로부터 먼 단부쪽에 위치하고, 중앙 경간용 거더 본체에는 양 단부쪽에 하나씩 한 쌍이 존재함)에 형성되는 중간 정착부를 포함하며, 일방향으로 길게 제작되는 철근 콘크리트 재질의 본체; 상기 본체의 양단부에 각각 마련되는 제1정착구와, 상기 한 쌍의 제1정착구를 연결하며 어느 하나의 제1정착구로부터 본체의 중앙까지는 점차적으로 아래로 내려가다가 본체의 중앙부로부터 다른 하나의 제1정착구까지는 점차적으로 위로 올라가는 곡선 형상으로 배치되는 제1쉬스관과, 상기 제1쉬스관에 삽입되며 인장력이 가해진 상태로 양단부가 상기 한 쌍의 제1정착구에 각각 정착되는 제1텐던을 포함하는 제1프리스트레싱 유닛; 상기 측경간용 거더 본체의 경우 중간 정착부로부터 먼쪽의 단부와 상기 중간 정착부의에 각각 마련되고, 상기 중앙 경간용 거더 본체의 경우 상기 한 쌍의 중간 정착부에 각각 마련되는 제2정착구와, 상기 한 쌍의 제2정착구를 연결하며 곡선 형상으로 배치되는 제2쉬스관과, 상기 제2쉬스관에 삽입되며 인장력이 가해진 상태로 양단부가 상기 한 쌍의 제2정착구에 각각 정착되는 제2텐던을 포함하는 제2프리스트레싱 유닛; 서로 인접한 한 쌍의 본체의 서로 접하는 단부와 가까이 위치한 한 쌍의 중간 정착부에 각각 마련되는 제3정착구와, 상기 한 쌍의 제3정착구를 연결하며 곡선 형상으로 배치되되 양단부의 일정길이 만큼은 상기 제2텐던과 겹치도록 배치되는 제3쉬스관과, 상기 제3쉬스관에 삽입되며 인장력이 가해진 상태로 양단부가 상기 한 쌍의 제3정착구에 각각 정착되는 제3텐던을 포함하는 제3프리스트레싱 유닛;을 포함하는 것을 특징으로 하는 연속 합성거더교용 프리스트레스트 콘크리트 거더를 제공한다.
PRESTRESSED CONCRETE GIRDER FOR CONTINUOUS COMPOSITE GIRDER BRIDGE AND CONSTRUCTION METHOD FOR THEREOF
The present invention relates to a construction method of a continuous composite girder bridge using a prestressed concrete girder for a continuous composite girder bridge and, more specifically, to a construction method of a continuous composite girder bridge using a prestressed concrete girder for a continuous composite girder bridge, which enables the continuation of a girder using a tendon by installing precast PSC girders on a lower structure, such as an abutment and a pier, and joining the girders to a continuation part in the pier using cast-in-place concrete before the construction of a bottom plate. Therefore, the present invention improves structural efficiency, facilitates a tension work, and is suitable for a multi-span continuous bridge by using tendons of a positive moment applied part and a negative moment applied part of the continuous girder, which are different from each other.
본 발명은 연속 합성거더교용 프리스트레스트 콘크리트 거더 및 이를 이용한 연속 합성거더교의 시공 방법에 관한 것으로서, 더욱 상세하게는 프리캐스트 PSC 거더들을 교대 및 교각 등의 하부구조 위에 설치하고 바닥판을 시공하기 전에 교각상의 연속부에서 거더를 현장타설 콘크리트로 이음하고 텐던을 사용하여 연속화를 하는 거더 연속화 시공방법에 있어서 연속화된 거더의 정모멘트 작용부와 부모멘트 작용부의 텐던을 다르게 구성하여 구조적으로 매우 효율적이며 긴장 작업도 용이하고 다경간 연속교에도 적합한 연속 합성거더교용 프리스트레스트 콘크리트 거더 및 이를 이용한 연속 합성거더교의 시공 방법에 관한 것이다. 본 발명은, 프리캐스트 프리스트레스트 콘크리트 거더들을 교대 및 교각 등의 하부구조 위에 설치하고 바닥판을 시공하기 전에 교각상의 거더 연속부에서 거더를 현장타설 콘크리트로 이음하고 텐던을 사용하여 연속화를 하는 거더 연속화 시공방법에 있어서, 연속거더의 양단부에 배치되는 측경간용 거더와 상기 측경간용 거더의 사이에 배치되는 중앙 경간용 거더를 포함(중앙 경간용 거더는 거더의 수가 3개 이상인 경우에만 포함)하며 연속 합성거더교에 사용되는 프리스트레스트 콘크리트 거더에 있어서, 거더 연속화 이후에 연속 거더에 작용하는 사하중들에 의한 작용 휨모멘트의 부호가 변하는 변곡점 주변(측경간용 거더의 본체에는 교대로부터 먼 단부쪽에 위치하고, 중앙 경간용 거더 본체에는 양 단부쪽에 하나씩 한 쌍이 존재함)에 형성되는 중간 정착부를 포함하며, 일방향으로 길게 제작되는 철근 콘크리트 재질의 본체; 상기 본체의 양단부에 각각 마련되는 제1정착구와, 상기 한 쌍의 제1정착구를 연결하며 어느 하나의 제1정착구로부터 본체의 중앙까지는 점차적으로 아래로 내려가다가 본체의 중앙부로부터 다른 하나의 제1정착구까지는 점차적으로 위로 올라가는 곡선 형상으로 배치되는 제1쉬스관과, 상기 제1쉬스관에 삽입되며 인장력이 가해진 상태로 양단부가 상기 한 쌍의 제1정착구에 각각 정착되는 제1텐던을 포함하는 제1프리스트레싱 유닛; 상기 측경간용 거더 본체의 경우 중간 정착부로부터 먼쪽의 단부와 상기 중간 정착부의에 각각 마련되고, 상기 중앙 경간용 거더 본체의 경우 상기 한 쌍의 중간 정착부에 각각 마련되는 제2정착구와, 상기 한 쌍의 제2정착구를 연결하며 곡선 형상으로 배치되는 제2쉬스관과, 상기 제2쉬스관에 삽입되며 인장력이 가해진 상태로 양단부가 상기 한 쌍의 제2정착구에 각각 정착되는 제2텐던을 포함하는 제2프리스트레싱 유닛; 서로 인접한 한 쌍의 본체의 서로 접하는 단부와 가까이 위치한 한 쌍의 중간 정착부에 각각 마련되는 제3정착구와, 상기 한 쌍의 제3정착구를 연결하며 곡선 형상으로 배치되되 양단부의 일정길이 만큼은 상기 제2텐던과 겹치도록 배치되는 제3쉬스관과, 상기 제3쉬스관에 삽입되며 인장력이 가해진 상태로 양단부가 상기 한 쌍의 제3정착구에 각각 정착되는 제3텐던을 포함하는 제3프리스트레싱 유닛;을 포함하는 것을 특징으로 하는 연속 합성거더교용 프리스트레스트 콘크리트 거더를 제공한다.
PRESTRESSED CONCRETE GIRDER FOR CONTINUOUS COMPOSITE GIRDER BRIDGE AND CONSTRUCTION METHOD FOR THEREOF
연속 합성거더교용 프리스트레스트 콘크리트 거더를 이용한 연속 합성거더교의 시공 방법
KIM YOUNG JOO (Autor:in)
17.12.2015
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
GIRDER BRIDGE CONSTRUCTION METHOD OF PRESTRESSED GIRDER
Europäisches Patentamt | 2021
GIRDER BRIDGE CONSTRUCTION METHOD OF PRESTRESSED GIRDER
Europäisches Patentamt | 2020
|PRESTRESSED CONCRETE GIRDER AND BRIDGE CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2021
PRESTRESSED CONCRETE GIRDER AND BRIDGE CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2021
PRESTRESSED CONCRETE GIRDER AND BRIDGE CONSTRUCTION METHOD THEREOF
Europäisches Patentamt | 2020
|