Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
BOREING METHOD ON TEMPORARY STRUCTURE FOR BOREHOLE BORING
The present invention relates to a method of drilling the upper part of temporary construction equipment for borehole drilling, which installs tools and equipment in the part above the temporary construction equipment without drilling a borehole from the bottom of the basement toward the inside of the ground to install a ground heat exchanger in subway construction or installation of a basement structure. The method of drilling of the present invention comprises: a step of marking a borehole drilling point on the bottom of the basement; a step of removing the temporary construction equipment from a part which is perpendicularly above the drilling point; a step of marking a borehole drilling point on the bottom of the basement; a step of installing a working table on a location from which the temporary construction equipment has been removed; a step of installing a drilling machine on the working table and installing a casing from the working table toward the drilling point on the bottom of the basement; and a step of inserting and installing a drilling rod inside the casing. Preferably, the method of drilling further comprises: a step of inserting and installing the drilling rod inside the casing and drilling borehole at a predetermined depth; a step of inserting and installing a ground heat exchanger pipe through the borehole after drilling the borehole; a step of grouting the borehole after inserting the ground heat exchanger pipe into the borehole; and a step of extracting the casing after the grout is completely cured.
본 발명은, 지하철 공사시 또는 지하 구조물 설치시 지중열 교환기를 설치하기 위해 지하 하부 바닥에서 지중으로 보어홀을 천공하지 않고, 임시가설재에 장비를 설치해 보어홀 천공하기 위한 임시가설재 상부 천공 공법에 관한 것이다.본 발명에 따른 보어홀 천공을 위한 임시가설재 상부 천공 공법은, 지하 하부 바닥에 보어홀 천공 포인트를 지정하는 단계; 상기 천공 포인트의 수직 상방의 임시가설재를 제거하는 단계; 상기 임시가설재 제거후, 임시가설재를 제거한 위치에 작업대를 설치하는 단계; 상기 작업대에 천공기를 설치하고, 작업대로부터 지하 하부 바닥의 천공 포인트까지 케이싱을 설치하는 단계; 및 상기 케이싱 내로 천공기 로드를 삽입·설치하는 단계; 를 거쳐 시공한다.바람직하게는, 상기 케이싱 내로 천공기 로드를 삽입·설치한 후에,보어홀을 소정의 깊이로 천공하는 단계; 상기 보어홀을 천공 후, 지중열교환 파이프를 보어홀에 삽입·설치하는 단계; 상기 지중열교환 파이프를 보어홀에 삽입한 후, 상기 보어홀을 그라우팅하는 단계; 및 상기 그라우팅이 양생된 후, 케이싱을 인발하는 단계; 를 거쳐 시공한다.
BOREING METHOD ON TEMPORARY STRUCTURE FOR BOREHOLE BORING
The present invention relates to a method of drilling the upper part of temporary construction equipment for borehole drilling, which installs tools and equipment in the part above the temporary construction equipment without drilling a borehole from the bottom of the basement toward the inside of the ground to install a ground heat exchanger in subway construction or installation of a basement structure. The method of drilling of the present invention comprises: a step of marking a borehole drilling point on the bottom of the basement; a step of removing the temporary construction equipment from a part which is perpendicularly above the drilling point; a step of marking a borehole drilling point on the bottom of the basement; a step of installing a working table on a location from which the temporary construction equipment has been removed; a step of installing a drilling machine on the working table and installing a casing from the working table toward the drilling point on the bottom of the basement; and a step of inserting and installing a drilling rod inside the casing. Preferably, the method of drilling further comprises: a step of inserting and installing the drilling rod inside the casing and drilling borehole at a predetermined depth; a step of inserting and installing a ground heat exchanger pipe through the borehole after drilling the borehole; a step of grouting the borehole after inserting the ground heat exchanger pipe into the borehole; and a step of extracting the casing after the grout is completely cured.
본 발명은, 지하철 공사시 또는 지하 구조물 설치시 지중열 교환기를 설치하기 위해 지하 하부 바닥에서 지중으로 보어홀을 천공하지 않고, 임시가설재에 장비를 설치해 보어홀 천공하기 위한 임시가설재 상부 천공 공법에 관한 것이다.본 발명에 따른 보어홀 천공을 위한 임시가설재 상부 천공 공법은, 지하 하부 바닥에 보어홀 천공 포인트를 지정하는 단계; 상기 천공 포인트의 수직 상방의 임시가설재를 제거하는 단계; 상기 임시가설재 제거후, 임시가설재를 제거한 위치에 작업대를 설치하는 단계; 상기 작업대에 천공기를 설치하고, 작업대로부터 지하 하부 바닥의 천공 포인트까지 케이싱을 설치하는 단계; 및 상기 케이싱 내로 천공기 로드를 삽입·설치하는 단계; 를 거쳐 시공한다.바람직하게는, 상기 케이싱 내로 천공기 로드를 삽입·설치한 후에,보어홀을 소정의 깊이로 천공하는 단계; 상기 보어홀을 천공 후, 지중열교환 파이프를 보어홀에 삽입·설치하는 단계; 상기 지중열교환 파이프를 보어홀에 삽입한 후, 상기 보어홀을 그라우팅하는 단계; 및 상기 그라우팅이 양생된 후, 케이싱을 인발하는 단계; 를 거쳐 시공한다.
BOREING METHOD ON TEMPORARY STRUCTURE FOR BOREHOLE BORING
보어홀 천공을 위한 임시가설재 상부 천공 공법
KIM KEUM PA (Autor:in)
03.02.2016
Patent
Elektronische Ressource
Koreanisch
Cool Projects, Boring Institutions: Temporary Collaboration in Social Context
Taylor & Francis Verlag | 2002
|Cool Projects, Boring Institutions: Temporary Collaboration in Social Context
Online Contents | 2002
|TEMPORARY JOINT SUPPORTING DEVICE FOR STEEL PIPE AND BORING METHOD THEREOF
Europäisches Patentamt | 2017
|Europäisches Patentamt | 2023
|