Eine Plattform für die Wissenschaft: Bauingenieurwesen, Architektur und Urbanistik
Method for Constructing Long Span Continuous Bridge of Spliced Prestressed Concrete Girders without Temporary Supports
The present invention relates to a method for constructing a long span bridge of a spliced prestressed concrete (PSC) girder by unsupported continuation which continuously connects spliced PSC girders in an unsupported manner to construct a long span bridge with a large gap between point bridge posts without installing a temporary bridge (a temporary support) for supporting the spliced PSC girders. According to the present invention, the method for constructing a long span bridge of a spliced PSC girder by unsupported continuation lifts an adjacent span girder (4) and arranges a temporary girder mounting device (2) on a main head girder (1) and the adjacent span girder (4) to integratively connect the main head girder (1) and the adjacent span girder (4) while maintaining a state where the main head girder (1) and the adjacent span girder (4) are continuously arranged.
본 발명은 스플라이스 PSC 거더를 지지하기 위한 임시교각(임시 지보재)을 설치하지 않는 "무지보"의 방식으로 스플라이스 PSC 거더를 서로 연속화시켜서 지점 교각 사이의 간격이 큰 장경간(long span) 교량을 구축할 수 있도록 하는 "무지보 연속화를 통한 스플라이스 PSC 거더의 장경간 교량 시공방법"에 관한 것이다. 본 발명에 따른 시공방법은, 인접경간 거더(4)를 인양하고, 거더 임시거치장치(2)를 주두부 거더(1)와 인접경간 거더(4)의 모두에 걸쳐진 형태로 배치하여, 주두부 거더(1)와 인접경간 거더(4)가 연속 배치된 상태를 유지한 상태에서, 주두부 거더(1)와 인접경간 거더(4)이 일체로 연속되도록 하는 구성을 가지는 것을 특징으로 한다.
Method for Constructing Long Span Continuous Bridge of Spliced Prestressed Concrete Girders without Temporary Supports
The present invention relates to a method for constructing a long span bridge of a spliced prestressed concrete (PSC) girder by unsupported continuation which continuously connects spliced PSC girders in an unsupported manner to construct a long span bridge with a large gap between point bridge posts without installing a temporary bridge (a temporary support) for supporting the spliced PSC girders. According to the present invention, the method for constructing a long span bridge of a spliced PSC girder by unsupported continuation lifts an adjacent span girder (4) and arranges a temporary girder mounting device (2) on a main head girder (1) and the adjacent span girder (4) to integratively connect the main head girder (1) and the adjacent span girder (4) while maintaining a state where the main head girder (1) and the adjacent span girder (4) are continuously arranged.
본 발명은 스플라이스 PSC 거더를 지지하기 위한 임시교각(임시 지보재)을 설치하지 않는 "무지보"의 방식으로 스플라이스 PSC 거더를 서로 연속화시켜서 지점 교각 사이의 간격이 큰 장경간(long span) 교량을 구축할 수 있도록 하는 "무지보 연속화를 통한 스플라이스 PSC 거더의 장경간 교량 시공방법"에 관한 것이다. 본 발명에 따른 시공방법은, 인접경간 거더(4)를 인양하고, 거더 임시거치장치(2)를 주두부 거더(1)와 인접경간 거더(4)의 모두에 걸쳐진 형태로 배치하여, 주두부 거더(1)와 인접경간 거더(4)가 연속 배치된 상태를 유지한 상태에서, 주두부 거더(1)와 인접경간 거더(4)이 일체로 연속되도록 하는 구성을 가지는 것을 특징으로 한다.
Method for Constructing Long Span Continuous Bridge of Spliced Prestressed Concrete Girders without Temporary Supports
무지보 연속화를 통한 스플라이스 프리스트레스트 콘크리트 거더의 장경간 교량 시공방법
AHN BYUNG LOK (Autor:in)
12.10.2016
Patent
Elektronische Ressource
Koreanisch
IPC:
E01D
BRIDGES
,
Brücken
High Strength Concrete in Spliced Prestressed Concrete Bridge Girders
British Library Conference Proceedings | 1997
|Applications of High-Strength Concrete to Long-Span Prestressed Bridge Girders
British Library Conference Proceedings | 1995
|Application of high performance concrete to long-span prestressed Bridge girders
British Library Conference Proceedings | 1996
|Applications of High-Strength Concrete to Long-Span Prestressed Bridge Girders
British Library Online Contents | 1995
|Deformation Behavior of Long-Span Prestressed High Performance Concrete Bridge Girders
British Library Conference Proceedings | 1997
|