DRAINPIPE CONSTRUCTION METHOD FOR BRIDGE
The present invention relates to a method to construct a linear drainpipe for a bridge, making a bridge drainpipe have an assembly structure, so as to prevent contact between asphalt deposition equipment and a catch pit, and thereby realizing efficient drainpipe construction. To this end, the method comprises: an elbow pipe installation step (ST 1) of installing an elbow pipe (20) in a slab rebar (11) forming a framework of a bridge slab (10); a slab concrete deposition step (ST-2) of depositing concrete up to an installation height of the elbow pipe (20) to form the bridge slab (10); a catch pit connection step (ST-3) of connecting a catch pit (30) to a top part of the elbow pipe (20) at a predetermined height; a pavement layer deposition step (ST-4) of depositing a pavement layer (12) on an upper surface of the bridge slab (10) as much as a protrusion height of the catch pit (30); an extension pipe connection step (ST-5) of connecting an extending pipe (40) to the other end of the elbow pipe (20); a vertical drainpipe installation step (ST-6) of installing a vertical drainpipe (50) along the connected extension pipe (40).
본 발명은 교량 선배수관 시공방법에 관한 것으로서, 교량 배수관이 조립식 구조를 이루도록 함으로서 아스팔트 타설장비와 집수구의 접촉현상을 방지하고 이에 따른 보다 효율적인 배수관 시공이 이루어질 수 있도록 하기 위한 것이다. 이를 실현하기 위한 본 발명은, 교량 슬라브(10)의 뼈대를 이루게 될 슬라브 철근(11)에 엘보관(20)을 설치하는 엘보관 설치단계와;(ST 1) 상기 엘보관(20) 설치높이까지 콘크리트를 타설하여 교량 슬라브(10)를 형성시키는 슬라브 콘크리트 타설단계와;(ST 2) 상기 엘보관(20)의 상단부에 집수구(30)를 일정 높이로 연결하는 집수구 연결단계와;(ST 3) 상기 교량 슬라브(10) 상면에 집수구(30)의 돌출 높이만큼 포장층(12)을 타설하는 포장층 타설단계와;(ST 4) 상기 엘보관(20)의 타단부에 연장관(40)을 연결하는 연장관 연결단계와;(ST 5) 상기 연결된 연장관(40)을 따라 종배수관(50)을 설치하는 종배수관 설치단계;(ST 6)를 포함하는 것을 특징으로 한다.
DRAINPIPE CONSTRUCTION METHOD FOR BRIDGE
The present invention relates to a method to construct a linear drainpipe for a bridge, making a bridge drainpipe have an assembly structure, so as to prevent contact between asphalt deposition equipment and a catch pit, and thereby realizing efficient drainpipe construction. To this end, the method comprises: an elbow pipe installation step (ST 1) of installing an elbow pipe (20) in a slab rebar (11) forming a framework of a bridge slab (10); a slab concrete deposition step (ST-2) of depositing concrete up to an installation height of the elbow pipe (20) to form the bridge slab (10); a catch pit connection step (ST-3) of connecting a catch pit (30) to a top part of the elbow pipe (20) at a predetermined height; a pavement layer deposition step (ST-4) of depositing a pavement layer (12) on an upper surface of the bridge slab (10) as much as a protrusion height of the catch pit (30); an extension pipe connection step (ST-5) of connecting an extending pipe (40) to the other end of the elbow pipe (20); a vertical drainpipe installation step (ST-6) of installing a vertical drainpipe (50) along the connected extension pipe (40).
본 발명은 교량 선배수관 시공방법에 관한 것으로서, 교량 배수관이 조립식 구조를 이루도록 함으로서 아스팔트 타설장비와 집수구의 접촉현상을 방지하고 이에 따른 보다 효율적인 배수관 시공이 이루어질 수 있도록 하기 위한 것이다. 이를 실현하기 위한 본 발명은, 교량 슬라브(10)의 뼈대를 이루게 될 슬라브 철근(11)에 엘보관(20)을 설치하는 엘보관 설치단계와;(ST 1) 상기 엘보관(20) 설치높이까지 콘크리트를 타설하여 교량 슬라브(10)를 형성시키는 슬라브 콘크리트 타설단계와;(ST 2) 상기 엘보관(20)의 상단부에 집수구(30)를 일정 높이로 연결하는 집수구 연결단계와;(ST 3) 상기 교량 슬라브(10) 상면에 집수구(30)의 돌출 높이만큼 포장층(12)을 타설하는 포장층 타설단계와;(ST 4) 상기 엘보관(20)의 타단부에 연장관(40)을 연결하는 연장관 연결단계와;(ST 5) 상기 연결된 연장관(40)을 따라 종배수관(50)을 설치하는 종배수관 설치단계;(ST 6)를 포함하는 것을 특징으로 한다.
DRAINPIPE CONSTRUCTION METHOD FOR BRIDGE
교량 선배수관 시공방법
CHOI DOO YOUNG (Autor:in)
05.12.2016
Patent
Elektronische Ressource
Koreanisch
Drainpipe, method for preventing blockage of drainpipe and installation structure of drainpipe
Europäisches Patentamt | 2016
|HANGER TYPE BRIDGE DRAINPIPE STRUCTURE AND CONSTRUCTION METHOD
Europäisches Patentamt | 2016
|